CEPT T TPH 41 E-1988 Reliability of Analogue Leased Circuits《模拟租赁电路可靠性》.pdf
《CEPT T TPH 41 E-1988 Reliability of Analogue Leased Circuits《模拟租赁电路可靠性》.pdf》由会员分享,可在线阅读,更多相关《CEPT T TPH 41 E-1988 Reliability of Analogue Leased Circuits《模拟租赁电路可靠性》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 Page E 1 Recommendation T/Tph 41 (Edinburgh 1988) O RELIABILITY OF ANALOGUE LEASED CIRCUITS Recommendation proposed by the “Telephone Operation and Tariffs” Working Group T/WG 2 (Tph) Text of the Recommendation adopted by the “Telecommtnications” Commission, “The European Conference of Postal and T
2、elecommunications Administrations, considering - the need, for commercial reasons, to provide customers with information on the performance of international - the efforts made by Administrations, for the rational management of their circuits and the need to ensure that - that ILCs are provided and m
3、aintained in accordance with standards, procedures and organizational arrange- leased circuits (ILCs) for private use, customers requirements correspond to the actual technical capacity of the networks, ments as defined in the CCITT M series Recommendations, O recommends that Administrations make th
4、e following information available to customers : 1. The relevant CCITT M Recommendations, which form the basis of international arrangements and standards (see Annex). 2. The average performance of analogue ILCs (Note 1) between CEPT countries (Note 2) has been shown to be consistent and repeatable
5、within the range of observed results obtained during a series of tests over a period of four years (Note 3). 3. Mean values concerning the reliability of intra-CEPT-ILCs, which have been established over three-month observation periods as follows: Mean Downtime per circuit: Mean Time to Restore Serv
6、ice: Mean Time Between Failures : Mean Service Availability per circuit: 12.57 hours 6.06 hours 43.13 days 99.42% 4. This data will be updated when Administrations agree that a significant change of the figures has taken place. 5. The performance of any individual ILC may vary considerably from the
7、mean values stated above. If measured over a longer period than three months, the actual performance figures will tend to the mean value. 6. ILCs with a high degree of utilization tend to show a lower service availability than those of lower utilization, because the closer attention paid by the cust
8、omer to the former leads to a higher level of fault reporting. 7. ILCs used for data transmission tend to show a higher fault report rate than non-data utilizations. 8. As far as the utilization of voice-grade circuits is concerned, only the analogue transmission parameters as specified in CCITT Rec
9、ommendations M. 1020, M. 1025 and M. 1040 are guaranteed by the Administrations. 9. For a particular set of analogue standards, there is a significant variation in the performance of the many types of Modem that may be connected. As a result, no Recommendation on the bit error performance of such ci
10、rcuits can be made. 10. Customer equipment faults are not included in the circuit fault record. An ILC should therefore only be reported faulty after the customer has verified that his equipment and the distant terminal equipment are working correctly. 11. Should the information provided on the basi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CEPTTTPH41E1988RELIABILITYOFANALOGUELEASEDCIRCUITS 模拟 租赁 电路 可靠性 PDF

链接地址:http://www.mydoc123.com/p-593364.html