BS ISO 11563-2003 Crude petroleum and petroleum products - Bulk cargo transfer - Guidelines for achieving the fullness of pipelines《原油和石油产品 散货运输 实现管道满度的指南》.pdf
《BS ISO 11563-2003 Crude petroleum and petroleum products - Bulk cargo transfer - Guidelines for achieving the fullness of pipelines《原油和石油产品 散货运输 实现管道满度的指南》.pdf》由会员分享,可在线阅读,更多相关《BS ISO 11563-2003 Crude petroleum and petroleum products - Bulk cargo transfer - Guidelines for achieving the fullness of pipelines《原油和石油产品 散货运输 实现管道满度的指南》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS ISO 11563:2003 Crude petroleum and petroleum products Bulk cargo transfer Guidelines for achieving the fullness of pipelines ICS 75.180.30 BS ISO 11563:2003 This British Standard was published under the authority of the Standards Policy and Strategy Committee on 21 March 2003 BSI
2、 21 March 2003 ISBN 0 580 41441 8 National foreword This British Standard reproduces verbatim ISO 11563:2003 and implements it as the UK national standard. The UK participation in its preparation was entrusted by Technical Committee PTI/12, Petroleum measurement and sampling, to Subcommittee PTI/12/
3、3, Bulk cargo transfer, which has the responsibility to: A list of organizations represented on this subcommittee can be obtained on request to its secretary. Cross-references The British Standards which implement international publications referred to in this document may be found in the BSI Catalo
4、gue under the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British Standards Online. This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its corr
5、ect application. Compliance with a British Standard does not of itself confer immunity from legal obligations. aid enquirers to understand the text; present to the responsible international/European committee any enquiries on the interpretation, or proposals for change, and keep the UK interests inf
6、ormed; monitor related international and European developments and promulgate them in the UK. Summary of pages This document comprises a front cover, an inside front cover, the ISO title page, pages ii to iv, pages 1 to 5 and a back cover. The BSI copyright date displayed in this document indicates
7、when the document was last issued. Amendments issued since publication Amd. No. Date Comments Reference number ISO 11563:2003(E)INTERNATIONAL STANDARD ISO 11563 First edition 2003-02-15 Crude petroleum and petroleum products Bulk cargo transfer Guidelines for achieving the fullness of pipelines Ptro
8、le brut et produits ptroliers Transfert de cargaison en vrac Principes directeurs pour raliser le remplissage des oloducs BSISO11563:20031BSISO11563:2003iiIS:36511 O3002(E) I SO 3002 All irhgts seredevr iiiForeword ISO (the International Organization for Standardization) is a worldwide federation of
9、 national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. Int
10、ernational organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with t
11、he rules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to prepare International Standards. Draft International Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval
12、by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. ISO 11563 was prepared by Technical Committee I
13、SO/TC 28, Petroleum products and lubricants, Subcommittee SC 6, Bulk cargo transfer, accountability, inspection and reconciliation. BSISO11563:2003iiiIS:36511 O3002(E) vi I SO 3002 All irhgts seredevrIntroduction When petroleum liquids are transferred, the accuracy of measurement of the transferred
14、quantity is affected by the contents and integrity of the pipelines. Pipelines which contain air or vapour with the liquid, or material of different characteristics, require procedures to ensure that, as far as is practical, pipelines are full of liquid compatible with the material to be transferred
15、. BSISO11563:2003ivINTENRATIONAL TSANDADR IS:36511 O3002(E)I SO 3002 All irhgts seredevr 1Crude petroleum and petroleum products Bulk cargo transfer Guidelines for achieving the fullness of pipelines 1 Scope This International Standard establishes procedures to achieve the fullness of a pipeline sys
16、tem. This International Standard is applicable to crude oils and petroleum products which are liquid at atmospheric pressure and at the observed temperature. It can be applied to loading, discharges and movements between local storage tanks. It is not the intention of this International Standard to
17、recommend practices for transcontinental movements. 2 Safety recommendations All safety precautions should comply with the International Safety Guide for Oil Tankers and Terminals (ISGOTT) and regulations specified by the vessel or terminal operator, and any statutory authorities who may be concerne
18、d. 3 Responsibilities 3.1 Terminal 3.1.1 The terminal should designate a pipeline system including meters (if used), and tank(s) (if used), and advise on the nominal capacity of the pipeline system. NOTE The preferred temperature for stating capacity is 15 C. 3.1.2 If the high-point bleed-valve/sigh
19、t-glass procedure (see 4.5) is selected to determine if a designated pipeline system is full, the valve or sight-glass locations for this purpose should be identified by the terminal. 3.2 Vessel 3.2.1 The capacity of the vessels lines designated for the line-displacement operation should be availabl
20、e for reference. The vessel should also report whether the designated lines are full or empty. 3.2.2 The condition of the vessels lines will have a direct effect on the accuracy of the line-displacement procedure between the vessel and the shore. The vessel should provide every assistance to accurat
21、ely determine the fullness condition of the vessels lines. 4 Procedures 4.1 General The following procedures are described in this International Standard: a) line displacement between the vessel and the shore, see 4.3; b) internal circulation of shore lines, see 4.4; c) high-point bleed-valve/sight-
22、glass procedure, see 4.5; BSISO11563:20031IS:36511 O3002(E) 2 I SO 3002 All irhgts seredevrd) pigging of shore lines, see 4.6; e) line press (line pack), see 4.7. Procedures b), c), d) and e) do not require the presence of a vessel. 4.2 Agreed tolerance Parties should agree on the differences in vol
23、umes or tank levels, determined at the commencement and completion of a line-fullness procedure, that will be acceptable. Such differences are referred to as the “agreed tolerance”. NOTE 1 Agreed tolerances can be derived from consideration of the nominal precision of the measurement techniques empl
24、oyed. In addition, records of previous line-fullness operations at a particular terminal can provide details to assist arriving at the agreed tolerance. NOTE 2 For the line-press procedure, a typical agreed tolerance would be a 3 mm difference in tank level. 4.3 Line displacement between vessel and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSISO115632003CRUDEPETROLEUMANDPETROLEUMPRODUCTSBULKCARGOTRANSFERGUIDELINESFORACHIEVINGTHEFULLNESSOFPIPELINES

链接地址:http://www.mydoc123.com/p-583611.html