BS EN 62110-2009 Electric and magnetic field levels generated by AC power systems - Measurement procedures with regard to public exposure《交流功率系统产生的电场和磁场等级 公共暴露测量法》.pdf
《BS EN 62110-2009 Electric and magnetic field levels generated by AC power systems - Measurement procedures with regard to public exposure《交流功率系统产生的电场和磁场等级 公共暴露测量法》.pdf》由会员分享,可在线阅读,更多相关《BS EN 62110-2009 Electric and magnetic field levels generated by AC power systems - Measurement procedures with regard to public exposure《交流功率系统产生的电场和磁场等级 公共暴露测量法》.pdf(54页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationElectric and magnetic field levels generated by AC power systems Measurement procedures with regard to public exposureBS EN 62110:2009Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA
2、STANDARDS, 31/08/2010 07:06, Uncontrolled Copy, (c) BSINational forewordThis British Standard is the UK implementation of EN 62110:2009. It is identical to IEC 62110:2009.The UK participation in its preparation was entrusted to Technical CommitteeGEL/106, Human exposure to low frequency and high fre
3、quency electromagnetic radiation.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions of acontract. Users are responsible for its correct application. BSI 2010ISBN 978 0 580 71375 0I
4、CS 17.220.20; 29.240.01Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 31 May 2010.Amendments issued since publicationAmd. No. Date Text affectedBRITISH STANDARDBS
5、 EN 62110:2009Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 31/08/2010 07:06, Uncontrolled Copy, (c) BSIEUROPEAN STANDARD EN 62110 NORME EUROPENNE EUROPISCHE NORM December 2009 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Eu
6、ropisches Komitee fr Elektrotechnische Normung Central Secretariat: Avenue Marnix 17, B - 1000 Brussels 2009 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 62110:2009 E ICS 17.220.20; 29.240 English version Electric and magnetic
7、field levels generated by AC power systems - Measurement procedures with regard to public exposure (IEC 62110:2009) Champs lectriques et magntiques gnrs par les systmes dalimentation courant alternatif - Procdures de mesure des niveaux dexposition du public (CEI 62110:2009) Magnetische Felder, die v
8、on Wechselstrom-Energieversorgungssystemen erzeugt werden - Messverfahren im Hinblick auf die Exposition der Allgemeinbevlkerung (IEC 62110:2009) This European Standard was approved by CENELEC on 2009-11-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulat
9、e the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member. This European Standard e
10、xists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions. CENELEC members are the national el
11、ectrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Swit
12、zerland and the United Kingdom. BS EN 62110:2009Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 31/08/2010 07:06, Uncontrolled Copy, (c) BSIEN 62110:2009 - 2 - Foreword The text of document 106/177/FDIS, future edition 1 of IEC 62110, prepared by IEC TC 106, Methods for the assessment of elec
13、tric, magnetic and electromagnetic fields associated with human exposure, was submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 62110 on 2009-11-01. The following dates were fixed: latest date by which the EN has to be implemented at national level by publication of an ide
14、ntical national standard or by endorsement (dop) 2010-08-01 latest date by which the national standards conflicting with the EN have to be withdrawn (dow) 2012-11-01 Terms defined in Clause 3 appear in italics throughout the document. Annex ZA has been added by CENELEC. _ Endorsement notice The text
15、 of the International Standard IEC 62110:2009 was approved by CENELEC as a European Standard without any modification. In the official version, for Bibliography, the following note has to be added for the standard indicated: IEC 61000-2-2 NOTE Harmonized as EN 61000-2-2:2002 (not modified). _ BS EN
16、62110:2009Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 31/08/2010 07:06, Uncontrolled Copy, (c) BSI- 3 - EN 62110:2009 Annex ZA (normative) Normative references to international publications with their corresponding European publications The following referenced documents are indispensable
17、 for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod),
18、 the relevant EN/HD applies. Publication Year Title EN/HD Year IEC 61786 -1)Measurement of low-frequency magnetic and electric fields with regard to exposure of human beings - Special requirements for instruments and guidance for measurement - - 1)Undated reference. BS EN 62110:2009Licensed Copy: Wa
19、ng Bin, ISO/EXCHANGE CHINA STANDARDS, 31/08/2010 07:06, Uncontrolled Copy, (c) BSI 2 62110 IEC:2009 CONTENTS INTRODUCTION.7 1 Scope.8 2 Normative reference .8 3 Terms and definitions .8 4 Measurement principle for electric and magnetic fields.9 4.1 General .9 4.2 Instruments .9 4.3 Harmonic content
20、10 4.4 Record of measurement result.10 4.5 Measurement considerations.11 4.5.1 Field orientation.11 4.5.2 Measurement locations12 4.5.3 Perturbing effects of an operator in electric field measurement12 4.5.4 Effects from other sources in magnetic field measurement 12 4.5.5 Humidity condition in elec
21、tric field measurement .12 5 Fundamental measurement procedures for electric and magnetic fields12 5.1 General procedure 12 5.2 Single-point measurement.13 5.3 Three-point measurement13 5.4 Five-point measurement 14 6 Measurement procedures for finding the maximum exposure level to an electric field
22、15 6.1 Overhead lines 15 6.2 Underground cables 15 6.3 Substations and power system equipment .15 7 Measurement procedures for finding the maximum exposure level to a magnetic field16 7.1 Overhead lines 16 7.2 Underground cables 16 7.3 Substations and power system equipment .16 Annex A (informative)
23、 Characteristics of electric fields generated by AC overhead lines18 Annex B (informative) Characteristics of magnetic fields generated by AC power systems 30 Annex C (informative) Concept of the three-point measurement with regard to the average exposure level.42 Annex D (informative) Example of a
24、reporting form for field measurement 47 Bibliography50 Figure 1 Heights of the three-point measurement.13 Figure 2 Five-point measurement.14 Figure A.1 Linear charge distribution above ground .19 Figure A.2 General n-phase system with ground 20 Figure A.3 Electric field levels under an overhead tran
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN621102009ELECTRICANDMAGNETICFIELDLEVELSGENERATEDBYACPOWERSYSTEMSMEASUREMENTPROCEDURESWITHREGARDTOPUBLICEXPOSURE

链接地址:http://www.mydoc123.com/p-578163.html