BS 9295-2010 Guide to the structural design of buried pipelines《掩埋管道的结构设计指南》.pdf
《BS 9295-2010 Guide to the structural design of buried pipelines《掩埋管道的结构设计指南》.pdf》由会员分享,可在线阅读,更多相关《BS 9295-2010 Guide to the structural design of buried pipelines《掩埋管道的结构设计指南》.pdf(68页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationGuide to the structural design of buried pipelinesBS 9295:2010BS 9295:2010 BRITISH STANDARDPublishing and copyright informationThe BSI copyright notice displayed in this docunull
2、ent indicates nullhen the docunullent nullas last issuednullnull BSI 2010ISBN 9nullnull 0 5null0 null0100 2InullS null 9nullnull0 02nullnull0null0null01 nullThe nullollonulling BSI renullerences relate to the nullornull on this standard: nullonullnullittee renullerences Bnull505null Bnull50null Dran
3、ullt nullor conullnullent 09nullnull01null0null0null DnullPublication historynullirst punulllished nullarch 2010Amendments issued since publicationDate nullenullt affected null BSI 2010 null iBS 9295:2010BRITISH STANDARDnullontentsnullorenullord iiiIntroduction 11 Scope 22 Nornullatinulle renulleren
4、ces 2null Ternullsnull denullnitions and synullnullols 3null The structural design onull pipelines 55 The design onull rigid pipelines 13null The design onull senullinullrigid pipelines 19null The design onull nullenullinullle pipelines 22AnnenullesAnnenull A nullinnullornullatinullenull nullther de
5、sign considerations 25Annenull B nullinnullornullatinullenull Sinullplinulled tanullles 44Binullliography 58nullist of nullguresnulligure 1 null Design considerations 5nulligure 2 null Rigid and nullenullinullle pipe nullehanulliour 7nulligure null null Soil pressure changes 8nulligure null null nul
6、loading connullgurations 10nulligure 5 null Schenullatics onull the nullain road loading case 11nulligure null null Typical calculated nullacnullnullll and nullain road tranullnullc loadings on a DNnull00 rigid pipeline nullith an enullternal dianulleter onull null5null nullnull 12nulligure null nul
7、l Typical calculated nullacnullnullll and nullain road tranullnullc loadings on a DNnull55 enullternal dianulleter nullenullinullle pipeline nullnullor conullparison purposesnull 12nulligure null null nullnullnullectinulle trench nullidthnull Bd 13nulligure 9 null Narronull to nullide trench conditi
8、ons nulltransition nullidthnull 14nulligure 10 null nullide to narronull trench conditions nulltransition depthnull 14nulligure 11 null The silo enullnullect 15nulligure 12 null nullonullplete pronullection 16nulligure 1null null Inconullplete pronullection 16nulligure 1null null Settlenullent denul
9、lection ratio 17nulligure 15 null Denullection lag nullactor 20nulligure Anull1 null Soil loads and stresses produced nully surnullace loads 26nulligure Anull2 null nullninullornull surcharge Usnullunit area onull linullited enulltent in nullnulled position 27nulligure Anullnull null nullipe in tunn
10、elnull heading or nullacnulled into place 30nulligure Anullnull null nullultiple pipe trenches 32nulligure Anull5 null nullipelines in poor ground 34nulligure Anullnull null nullse onull geotenulltile around pipe enullnullednullent 35nulligure Anullnull null nullipeline on piles 36nulligure Anullnul
11、l null nullrotection onull a shallonull pipeline using concrete surround 41nulligure Anull9 null nullrotection onull shallonull pipeline nullith a slanull 41nulligure Anull10 null nulllain and reinnullorced nulleddings and surrounds 43nullist of tablesTanullle 1 null nullipe classinullcation 6Tanull
12、le Anull1 null Surcharge pressuresnull PsnullnullNnullnull2null 28Tanullle Anull2 null nullnulluation errors nullpercentnull 29Tanullle Anullnull null Reconullnullended nullanullinullunull length onull rocnuller pipes 37Tanullle Bnull1 null Sinullplinulled tanullle nullor the enullnullednullent onul
13、l nullitrinulled clay pipes 45Tanullle Bnull2 null Sinullplinulled nulledding tanullle nullor concrete pipes 47Tanullle Bnullnull null nullnullnullednullent classes 48BS 9295:2010ii null null BSI 2010BRITISH STANDARDTanullle BnullnullA null Sanulle depths onull conuller nullnullnull nullor ductile i
14、ron nullater pipe nullith nulleld surcharge 50Tanullle BnullnullB null Sanulle depths onull conuller nullnullnull nullor ductile iron nullater pipe nullith nullain road surcharge 52Tanullle Bnull5A null Sanulle depths onull conuller nullnullnull nullor ductile iron pressure senuller pipe nullith nul
15、leld surcharge 54Tanullle Bnull5B null Sanulle depths onull conuller nullnullnull nullor ductile iron pressure senuller pipe nullith nullain road surcharge 56Summary of pagesThis docunullent conullprises a nullront conullernull an inside nullront conullernull pages i to inullnull pages 1 to null0nul
16、l an inside nullacnull conuller and a nullacnull conullernullnull BSI 2010 null iiiBS 9295:2010BRITISH STANDARDnullorenullordPublishing informationThis British Standard is punulllished nully BSI and canulle into enullnullect on null1 nullarch 2010null It nullas prepared nully Technical nullonullnull
17、ittee Bnull505nullWastewater engineering in consultation nullith Technical nullonullnullittee Bnull50nullnull Water supplynull A list onull organinullations represented on these conullnullittees can nulle onulltained on renulluest to their secretariesnullnullelationship nullith other publicationsThi
18、s British Standard is conullplenullentary to BS nullN 1295null1:199null and nullD nullnullNnullTR 1295null2:2005nullBS nullN 1295null1:199null specinulles general renulluirenullents nullor the structural design onull nulluried pipelines under nullarious conditions onull loadingnullnulluidance is als
19、o ginullen on the application onull the nationally estanulllished nullethods onull design declared nullynull and used innull nullnullN nullenullnuller countries at the tinulle it nullas preparednull The estanulllished nullnited nullingdonull nullethod is sunullnullarised in Bnull2null12null and Nati
20、onal Annenull A descrinulles the calculation procedure in nullore detailnullnullD nullnullNnullTR 1295null2:2005 sunullnullarinulles the nationally estanulllished nullethods onull design nullade anullailanullle to nullnullN and the nullnited nullingdonull nullethod is descrinulled in Anull9null null
21、hich is consistent nullith BS nullN 1295null1:199nullnull National Annenull Anull as corrected nully nullorrigendunull Nonull 1 on null1 nullay 200nullnullThis British Standard ginulles nullurther innullornullation to nullacilitate in nullull the structural design onull nulluried pipelines under nul
22、larious conditions onullloading using the estanulllished nullnited nullingdonull nullethodnull it does not alter any onull the pronullisions onull BS nullN 1295null1:199nullnullnullhilst recogninulling that the nullnull National Annenull to nullN 1295null1 nullight nulle renullienulled in the nullut
23、ure in respect onull possinullle changes to current practice nullor the design onull thernulloplastics pipelinesnull it nullas agreed that this nullrst edition onull BS 9295 is specinullcally renulluired to nulle a guide to the enullisting BS nullN 1295null1nullnullse of this documentAs a guidenull
24、this British Standard tanulles the nullornull onull guidance and reconullnullendationsnull It should not nulle nulluoted as inull it nullas a specinullcation or a code onull practice and clainulls onull conullpliance cannot nulle nullade to itnullPresentational connullentionsThe pronullisions in thi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS92952010GUIDETOTHESTRUCTURALDESIGNOFBURIEDPIPELINES 掩埋 管道 结构设计 指南 PDF

链接地址:http://www.mydoc123.com/p-547640.html