1、软件水平考试(高级)信息系统项目管理师上午(综合知识)模拟试卷 19及答案与解析 1 Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the(20) level. ( A) independent resource ( B) individual work load ( C) work milestone ( D) work package 2 (21) 12 assesses the prior
2、ity of identified risks using their probability of occurring, the corresponding impact on project obj ectives if the risks do occur,as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule,scope, and quality. ( A) Quantitative Risk Analysis ( B)
3、 Qualitative Risk Analysis ( C) Enterprise Environmental Factors ( D) Risk Management Plan 3 (22) describes, in detail, the projects deliverables and the work required to create thosed Pliverahles ( A) Product scope description ( B) Project objectives ( C) Stakeholder Analysis ( D) The project scope
4、 statement 3 Fair and(23)competition in government procurement around the world is good business and good public policy.Competitive pricing, product(24) and performance improvements result from competitive practices and help ensure that government authorities get the best(25)for the public they serv
5、e. 4 (23) ( A) open ( B) continue ( C) dependent ( D) reliable 5 (24) ( A) recession ( B) innovation ( C) crisis ( D) ability 6 (25) ( A) help ( B) server ( C) value ( D) policy 7 The(26) process ascertains which risks have the potential of affecting the project and documenting the riskscharacterist
6、ics. ( A) Risk Identification ( B) Quantitative Risk Analysis ( C) Qualitative Risk Analysis ( D) Risk Monitoring and Control 8 The strategies for handling risk comprise of two main types: negative risks.and positive risks.The goal of the plan is to minimize threats and maximize opportunities.When d
7、ealing with negative risks, there are three main response strategies(27),Transfer,Mitigate. ( A) Challenge ( B) Exploit ( C) Avoid ( D) Enhance 9 (28) is a property of object-oriented software by which an abstract operation may be performed in different ways in different classes. ( A) Method ( B) Po
8、lymorphism ( C) Inheritance ( D) Encapsulation 10 The Unified Modeling Language is a standard graphical language for modeling object-oriented software.(29) can show the behavior of systems in terms of how objects interact with each other. ( A) Class diagram ( B) Component diagram ( C) Sequence diagr
9、am ( D) Use case diagram 11 The creation of a work breakdown structure(WBS)is the process of(30)the major project deliverables. ( A) subdividing ( B) assessing ( C) planning ( D) integrating 11 Many of the activities performed during the preliminary investigation are still being conducted in(31), bu
10、t in much greater depth than before.During this phase, the analyst mustbecome fully aware of the(32) and must develop enough knowledge about the(33) and theexisting systems to enable an effective solution to be proposed and implemented.Besides the(34) for process and data of current system, the deli
11、verable from this phase also includes the(35) forthe proposed system. 12 (31) ( A) analysis phase ( B) design phase ( C) implementation phase ( D) maintenance phase 13 (32) ( A) main symptom ( B) root problem ( C) final blueprint ( D) data specification 14 (33) ( A) hardware environment ( B) testing
12、 environment ( C) software environment ( D) business environment 15 (34) ( A) 10gical models ( B) physical models ( C) design models ( D) implementation models 16 (35) ( A) hardware and software specification ( B) system performance specification ( C) formal requirements definition ( D) general prob
13、lem statement 17 Define Activities is the process of identifying the specific actions to be performed to produce the(36). ( A) project elements ( B) work drafts ( C) work package ( D) project deliverables 18 Project work packages are typically decomposed into smaller components called activities to
14、provide a basis for(37),scheduling, executing, and monitoring and controlling the project work. ( A) reviewing ( B) estimating ( C) auditing ( D) expecting 19 The Estimate Activity Resource process i s closely coordinated with the(38) process. ( A) Estimate Costs ( B) Sequence Activities ( C) Plan C
15、ommunications ( D) Conduct Procurements 20 Estimating activity durations uses information on activity scope of(39),required resource types, estimated resource quantities, and resource calendars. ( A) milestone ( B) baseline ( C) quality ( D) work 21 Developing the project schedule is often an iterat
16、ive process.It determines the planned start and finish dates for project activities and milestones.Schedule development can reqmre the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to(40) progress. ( A) analyze (
17、B) track ( C) 1evel ( D) extend 21 The(41) is a gener description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized.The workflow enactment service is the heart of a workflow system which consists of several
18、(42). 22 (41) ( A) waterfall model ( B) workflow reference model ( C) evolutionary model ( D) spiral model 23 (42) ( A) workflow engines ( B) processes ( C) workflow threads ( D) tasks 24 The project maintains a current and approved set of requirements over the life of the project by doing the follo
19、wing: (43) all changes to the requirements Maintaining the relationships among the requirements, the project plans, and the work products ( A) Monitoring ( B) Managing ( C) Gathering ( D) Reducing 25 The receiving activities conduct analyses of the requirements with the reauirements proider to ensur
20、e that a compatible, shared understanding is reached on the meaning of the requirements.e result of this analysis and dialog is an(44) set of requirements. ( A) agreed-to ( B) agree-to ( C) agree-to do ( D) agree-with 26 During the project, requirements change for a variety of reasons.As needs chang
21、e and as work proceeds, additional requirements are derived and changes may have to be made to the existmg requirements It is essential to manage these additions and changes efficientlv and effectively.To effectively analyze the impact of the changes, it is Fiecessarythat the sOurce of each requlrem
22、ent is known and the rationale for any change is documented.The project manager may, howeVer, want to track appropriate measures of requirements volatility to judge whether neW 0r revised(45) are necessary. ( A) proceedings ( B) controls ( C) forecastings ( D) prelibations 27 Project Quality Managem
23、ent processes include all the activities of the(46) that deternline quality policies, objectives and responsibilities so that the project will satisfy the needs for whjch jtwas undertaken. ( A) project ( B) project management team ( C) performing organization ( D) CU stomer 28 The project team membe
24、rs should also be aware of one of the mndamental tenets of modemquality management: quality is planned, designed and built in, not(47). ( A) executed in ( B) inspected in ( C) check.in ( D) look. in 29 The project(48) is a key input to quality planning since it documents major projectdeliverables, t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 试卷 软件 水平 考试 高级 信息系统 项目 管理 上午 综合 知识 模拟 19 答案 解析 DOC