ASCE 41258-2013 ANCHORAGE DESIGN FOR PETROCHEMICAL FACILITIES.pdf
《ASCE 41258-2013 ANCHORAGE DESIGN FOR PETROCHEMICAL FACILITIES.pdf》由会员分享,可在线阅读,更多相关《ASCE 41258-2013 ANCHORAGE DESIGN FOR PETROCHEMICAL FACILITIES.pdf(175页珍藏版)》请在麦多课文档分享上搜索。
1、 ANCHORAGE DESIGN FOR PETROCHEMICAL FACILITIES PREPARED BY Task Committee on Anchorage of the Petrochemical Committee of the Energy Division of the American Society of Civil Engineers 1801 ALEXANDER BELL DRIVE RESTON, VIRGINIA 20191-4400 Library of Congress Cataloging-in-Publication Data Anchorage d
2、esign for petrochemical facilities / prepared by Task Committee on Anchorage of the Petrochemical Committee of the Energy Division of the American Society of Civil Engineers. pages cm Includes bibliographical references and index. ISBN 978-0-7844-1258-9 (pbk.) - ISBN 978-0-7844-7718-2 (pdf) - ISBN 9
3、78-0-7844-7744-1 (epub) 1. Petroleum refineries-Design and construction. 2. Industrial buildings-Foundations. 3. Wind-pressure. I. American Society of Civil Engineers. Task Committee on Anchorage. TH4571.A53 2013 693.85-dc23 2012035238 Published by American Society of Civil Engineers 1801 Alexander
4、Bell Drive Reston, Virginia, 20191-4400 www.asce.org/pubs Any statements expressed in these materials are those of the individual authors and do not necessarily represent the views of ASCE, which takes no responsibility for any statement made herein. No reference made in this publication to any spec
5、ific method, product, process, or service constitutes or implies an endorsement, recommendation, or warranty thereof by ASCE. The materials are for general information only and do not represent a standard of ASCE, nor are they intended as a reference in purchase specifications, contracts, regulation
6、s, statutes, or any other legal document. ASCE makes no representation or warranty of any kind, whether express or implied, concerning the accuracy, completeness, suitability, or utility of any information, apparatus, product, or process discussed in this publication, and assumes no liability theref
7、ore. This information should not be used without first securing competent advice with respect to its suitability for any general or specific application. Anyone utilizing this information assumes all liability arising from such use, including but not limited to infringement of any patent or patents.
8、 ASCE and American Society of Civil EngineersRegistered in U.S. Patent and Trademark Office. Photocopies and permissions. Permission to photocopy or reproduce material from ASCE publications can be obtained by sending an e-mail to permissionsasce.org or by locating a title in ASCEs online database (
9、http:/cedb.asce.org) and using the “Permission to Reuse” link. Copyright 2013 by the American Society of Civil Engineers. All Rights Reserved. ISBN 978-0-7844-1258-9 (paper) ISBN 978-0-7844-7718-2 (PDF) ISBN 978-0-7844-7744-1 (EPUB) Manufactured in the United States of America. ASCE Petrochemical En
10、ergy Committee This document is one of five state-of-the-practice engineering reports produced, to date, by the ASCE Petrochemical Energy Committee. These engineering reports are intended to be a summary of current engineering knowledge and design practice, and present guidelines for the design of p
11、etrochemical facilities. They represent a consensus opinion of task committee members active in their development. These five ASCE engineering reports are: 1. Design of Blast-Resistant Buildings in Petrochemical Facilities 2. Guidelines for Seismic Evaluation and Design of Petrochemical Facilities 3
12、. Wind Loads for Petrochemical and Other Industrial Facilities 4. Anchorage Design for Petrochemical Facilities 5. Design of Secondary Containment in Petrochemical Facilities The ASCE Petrochemical Energy Committee was organized by A. K. Gupta in 1991 and initially chaired by Curley Turner. Under th
13、eir leadership the five task committees were formed. More recently, the Committee has been chaired by Joseph A. Bohinsky and Frank J. Hsiu. The five reports were initially published in 1997. Building codes and standards have changed significantly since the publication of these five reports, specific
14、ally in the calculation of wind and seismic loads and analysis procedures for anchorage design. Additionally, new research in these areas and in blast resistant design has provided opportunities for improvement of the recommended guidelines. The ASCE has determined the need to update four of the ori
15、ginal reports and publish new editions based on the latest research and for consistency with current building codes and standards. The ASCE Petrochemical Energy Committee was reorganized by Magdy H. Hanna in 2005, and the following four task committees were formed to update their respective reports:
16、 Task Committee on Anchorage for Petrochemical Facilities Task Committee on Blast Design for Petrochemical Facilities Task Committee on Seismic Evaluation and Design for Petrochemical Facilities Task Committee for Wind Load Design for Petrochemical Facilities Current ASCE Petrochemical Energy Commit
17、tee Magdy H. Hanna, PE JacobsTask Committee Chairman William Bounds, PE Fluor CorporationBlast Committee Chairman John B. Falcon, PE JacobsAnchorage Committee Chairman James R. (Bob) Bailey, PhD, PE Exponent, Inc.Wind Committee Chairman J. G. (Greg) Soules CB and provide an updated report that will
18、continue to serve as a source for uniformity in the design, fabrication and installation of anchorage in the petrochemical industry. Although the makeup of the committee and the writing of this report are directed at petrochemical facility design, these guidelines are applicable to similar design si
19、tuations in other industries. This report should interest engineers with responsibility for designing anchorage for equipment and structures, and operating company personnel responsible for establishing internal design, fabrication and construction practices. This report is intended to be a State-of
20、-the-Practice set of guidelines. The guidelines are based on published information and actual design practices. A review of current practices, internal company standards, and published documents was conducted. Also included is a list of references used by the Committee during creation of this report
21、. The Committee acknowledges the work of Process Industry Practices (PIP) (http:/www.pip.org) for providing much of the information used in this report. In helping to create this consensus set of guidelines, the following individuals provided valuable assistance: John B. Falcon, PE Donald W. Boyd Ja
22、cobs Process Industry Practices (PIP) Chairman Anchorage Committee Vice Chairman Tracey Hays, PE S b. summarize anchorage materials and properties; c. present current practices for fabrication and installation of anchorage; d. present recommendations for post-installed anchors; e. make comprehensive
23、 recommendations for cast-in-place anchor design which are appropriate for use by the petrochemical industry; f. present recommended fabrication, constructability, and repair practices. The committee recognized that while several different types of anchorage systems are used in petrochemical facilit
24、ies, the most common types are cast-in-place anchors, welded anchors, post-installed anchors, and shear lugs. Therefore, for this report, the committee limited its investigation and recommendations to these common types. This self-imposed limit should not be construed as an attempt to limit the impo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASCE412582013ANCHORAGEDESIGNFORPETROCHEMICALFACILITIESPDF

链接地址:http://www.mydoc123.com/p-453918.html