1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 61 13 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 61 13 (April 2006)GUIDE SPECIFICATION FOR CONSTRUCTIONReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 61 13EXCAVATION
2、 AND HANDLING OF CONTAMINATED MATERIAL02/10PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.1.1 Measurement1.1.2 Payment1.1.2.1 Excavation and Transportation1.1.2.2 Backfilling1.1.2.3 Stockpiling1.2 REFERENCES1.3 DESCRIPTION OF WORK1.3.1 Scheduling1.3.2 Work Plan1.3.3 Other Submittal Requirements1.4 SUBMI
3、TTALS1.5 REGULATORY REQUIREMENTS1.5.1 Permits and Licenses1.5.2 Air EmissionsPART 2 PRODUCTS2.1 SPILL RESPONSE MATERIALS2.2 BACKFILLPART 3 EXECUTION3.1 SURVEYS3.2 EXISTING STRUCTURES AND UTILITIES3.3 CLEARING3.4 CONTAMINATED MATERIAL REMOVAL3.4.1 Excavation3.4.2 Shoring3.4.3 Dewatering3.5 CONFIRMATI
4、ON SAMPLING AND ANALYSIS3.6 CONTAMINATED MATERIAL STORAGE3.6.1 Stockpiles3.6.2 Roll-Off UnitsSECTION 02 61 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.6.3 Liquid Storage3.7 SAMPLING3.7.1 Sampling of Stored Material3.7.2 Sampling Liquid
5、3.7.3 Sampling Beneath Storage Units3.8 SPILLS3.9 BACKFILLING3.9.1 Confirmation Test Results3.9.2 Compaction3.10 DISPOSAL REQUIREMENTS3.11 CLOSURE REPORT- End of Section Table of Contents -SECTION 02 61 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
6、m IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 61 13 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 61 13 (April 2006)GUIDE SPECIFICATION FOR CONSTRUCTIONReferences are in agreement with UMRL dated April 2010*SECTION 02 61 13EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL02/10*NOTE
7、: This guide specification covers the requirements for excavation, handling, and temporary storage of contaminated material.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate inf
8、ormation.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including t
9、heir organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The following information should be shown on the project drawings:a. Overall site plan, borrow areas, stockpile areas, sto
10、rage areas, security requirements, special shoring requirements, boring logs, and access routes.b. Individual site plans of each area of contamination with site features such as buildings, roads, utilities, topography, trees, shrubs, surface conditions, etc.c. Limits of pavement removal, fence remov
11、al, and the location of ancillary equipment to be removed.SECTION 02 61 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-All specific chemical testing procedures (including air emissions analysis) should be addressed in the Sampling and Analy
12、sis Plan required by Section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL.When applicable, the use of onsite field screening or field analysis (supported at a prescribed frequency by fixed laboratory analysis) should be encouraged to avoid prolonged delays or equipment downtime. Details on the appro
13、priate application and use of field analyses can be found in Appendix H of EM 200-1-3.*1.1 MEASUREMENT AND PAYMENT*NOTE: These paragraphs should be deleted if the work is in one lump-sum contract price. Coordinate requirements of these paragraphs with the bidding schedule.*1.1.1 Measurement*NOTE: Mo
14、dify this paragraph if the method of payment will be on a weight basis.*Measurement for excavation and onsite transportation shall be based on the actual number of cubic meters yards of contaminated material in-place prior to excavation. Determination of the volume of contaminated material excavated
15、 shall be based on cross-sectional volume determination reflecting the differential between the original elevations of the top of the contaminated material and the final elevations after removal of the contaminated material. Measurement for backfilling of excavated areas shall be based on in-place c
16、ubic meters yards of compacted fill. Measurement for construction of stockpile areas shall be based on the number of square meters yards of stockpile liner constructed.1.1.2 Payment1.1.2.1 Excavation and TransportationCompensation for excavation and onsite transportation of contaminated material wil
17、l be paid as a unit cost. This unit cost shall include any other items incidental to excavation and handling not defined as having a specific unit cost.1.1.2.2 BackfillingCompensation for backfill soil, transportation of backfill, backfill soil conditioning, backfilling, compaction, and geotechnical
18、 testing will be paid as a single unit cost.SECTION 02 61 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.2.3 StockpilingCompensation for construction of stockpile areas will be paid for as a unit cost. This unit cost shall include all a
19、spects of grading, preparation, handling, placement, maintenance, removal, treatment, and disposal of stockpile cover materials and liner materials and all other items incidental to construction of stockpiles.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of t
20、he guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically pl
21、ace the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print proce
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0261132010EXCAVATIONANDHANDLINGOFCONTAMINATEDMATERIAL 挖方 污染 材料 处理 PDF

链接地址:http://www.mydoc123.com/p-449530.html