ARMY UFGS-02 56 15-2010 GEOSYNTHETIC CLAY LINER (GCL)《土木合成材料粘土垫》.pdf
《ARMY UFGS-02 56 15-2010 GEOSYNTHETIC CLAY LINER (GCL)《土木合成材料粘土垫》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-02 56 15-2010 GEOSYNTHETIC CLAY LINER (GCL)《土木合成材料粘土垫》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 56 15 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 56 15 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 56 15GEOSYNT
2、HETIC CLAY LINER (GCL)02/10PART 1 GENERAL1.1 UNIT PRICES1.2 REFERENCES1.3 SUBMITTAL REQUIREMENTS1.4 SUBMITTALS1.5 QUALIFICATIONS1.5.1 Manufacturer1.5.2 Installer1.5.3 QC Inspector1.5.4 QC Laboratory1.6 DELIVERY, STORAGE, AND HANDLING1.6.1 Delivery1.6.2 Storage1.6.3 Handling1.7 WARRANTYPART 2 PRODUCT
3、S2.1 GCL PROPERTIES2.2 TESTS, INSPECTIONS, AND VERIFICATIONS2.2.1 Manufacturing Sampling and Testing2.2.2 Shear Strength Testing2.2.2.1 Mid-Plane Shear Strength Testing2.2.2.2 Interface Shear Strength TestingPART 3 EXECUTION3.1 SAMPLES AND TESTS3.1.1 Samples3.1.2 Conformance Tests3.2 INSTALLATION3.2
4、.1 Subgrade Preparation3.2.2 Placement3.2.3 Anchor Trench3.2.4 SeamsSECTION 02 56 15 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.5 Protection3.3 REPAIRS3.4 PENETRATIONS3.5 COVERING- End of Section Table of Contents -SECTION 02 56 15 Pag
5、e 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 56 15 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 56 15 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UM
6、RL dated April 2010*SECTION 02 56 15GEOSYNTHETIC CLAY LINER (GCL)02/10*NOTE: This guide specification covers the requirements for geosynthetic clay liners.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable ite
7、ms(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of te
8、chnical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: Delete this paragraph when lump sum bidding is used.*Measurement will be mad
9、e of the total surface area covered by GCL in square m yards as shown on the contract drawings. Final quantities will be based on as-built conditions. Allowance will be made for GCL in anchor and drainage trenches; however, no allowance will be made for waste, overlap, repairs, or materials used for
10、 the convenience of the Contractor. GCL installed and accepted will be paid for at the respective contract unit price in the bidding schedule.SECTION 02 56 15 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2 REFERENCES*NOTE: This paragraph i
11、s used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside
12、 of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you cho
13、ose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 1505 (2003) Density of Plastics by the De
14、nsity-Gradient TechniqueASTM D 5199 (2001; R 2006) Measuring Nominal Thickness of GeosyntheticsASTM D 5261 (1992; R 2009) Measuring Mass Per Unit Area of GeotextilesASTM D 5887 (2009) Measurement of Index Flux Through Saturated Geosynthetic Clay Liner Specimens Using a Flexible Wall PermeameterASTM
15、D 5888 (2006) Storage and Handling of Geosynthetic Clay LinersASTM D 5889 (1997; R 2008) Quality Control of Geosynthetic Clay LinersASTM D 5890 (2006) Swell Index of Clay Mineral Component of Geosynthetic Clay LinersASTM D 5891 (2002) Fluid Loss of Clay Component of Geosynthetic Clay LinersASTM D 59
16、93 (1999; R 2004) Measuring Mass Per Unit of Geosynthetic Clay LinersASTM D 5994 (1998; R 2003) Measuring Core Thickness of Textured GeomembraneSECTION 02 56 15 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM D 6072/D 6072M (2009) Obtainin
17、g Samples of Geosynthetic Clay LinersASTM D 6243 (2009) Determining the Internal and Interface Shear Resistance of Geosynthetic Clay Liner by the Direct Shear MethodASTM D 6496 (2004a) Determining Average Bonding Peel Strength Between the Top and Bottom Layers of Needle-Punched Geosynthetic Clay Lin
18、ersASTM D 6768 (2004) Tensile Strength of Geosynthetic Clay LinersASTM D 792 (2008) Density and Specific Gravity (Relative Density) of Plastics by Displacement1.3 SUBMITTAL REQUIREMENTSSubmit manufacturers certified raw and roll material data sheets. If needle punching or stitch bonding is used in c
19、onstruction of GCL, the certification shall indicate that the GCL has been continuously inspected for broken needles using an in-line metal detector and all broken needles have been removed. The certified data sheets shall be attested to by a person having legal authority to bind the GCL manufacturi
20、ng company. Certified test results shall be submitted at least 14 _ working days prior to delivery of the GCL. Submit GCL panel layout and detail drawings, for approval, a minimum of 14 _ days prior to deployment. The following shall also be submitted as specified:a. GCL panel layout and penetration
21、 detail drawings.b. Manufacturers warranty statement.c. Manufacturers quality control (QC) manual which describes testing procedures, frequency of testing and acceptance/rejection criteria for QC testing at least 14 _ days prior to delivery of the GCL. QC samples shall be delivered at the specified
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0256152010GEOSYNTHETICCLAYLINERGCL 土木 合成 材料 粘土 PDF

链接地址:http://www.mydoc123.com/p-449529.html