1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 32 00 (May 2010)-Preparing Activity: USACE (CW) SupersedingUFGS-02 32 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 32 00SUBSURF
2、ACE DRILLING, SAMPLING, AND TESTING05/10PART 1 GENERAL1.1 UNIT PRICES1.1.1 Mobilization and Demobilization1.1.1.1 Payment1.1.1.2 Unit of Measure1.1.2 Auger Boring and Sampling of Drill Holes1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of Measure1.1.3 Drive Sample Boring and Sampling1.1.3.1 Payment
3、1.1.3.2 Measurement1.1.3.3 Unit of Measure1.1.4 Undisturbed Sample Boring and Sampling1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of Measurement1.1.5 Core Hole Overburden Drilling, Without Sampling1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of Measure1.1.6 Core Drilling, Vertical Inclined Hole
4、s1.1.6.1 Payment1.1.6.2 Measurement1.1.6.3 Unit of Measure1.1.7 Pressure Testing (Hydraulic)1.1.7.1 Payment1.1.7.2 Measurement1.1.7.3 Unit of Measure1.1.8 Test Pit Excavation1.1.8.1 Payment1.1.8.2 Measurement1.1.8.3 Unit of Measure1.1.9 Test Pit Undisturbed Sample1.1.9.1 PaymentSECTION 02 32 00 Page
5、 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.9.2 Measurement1.1.9.3 Unit of Measure1.1.10 Material for Shoring/Lining Pit Excavation1.1.10.1 Payment1.1.10.2 Measurement1.1.10.3 Unit of Measure1.1.11 Casing Left in Drill Holes1.1.11.1 Payment
6、1.1.11.2 Measurement1.1.11.3 Unit of Measure1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Auger Borings and Sampling1.3.2 Drive Sample Borings and Sampling1.3.3 Undisturbed Sample Borings and Sampling1.3.4 Core Drilling1.3.5 Pressure Testing (Hydraulic)1.3.6 Test Pit Excavation and Sampling1.3.7 Sequenc
7、ing and Scheduling1.3.7.1 Schedule of Drilling, Sampling, and Testing1.3.7.2 Order of Work1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.6 DELIVERY, STORAGE, AND HANDLING1.6.1 General1.6.2 Undisturbed Samples1.7 PROJECT/SITE CONDITIONS1.7.1 Environmental Requirements1.7.2 Field MeasurementsPART 2 PRODUCTS2.1
8、CONTAINERS2.1.1 Sample Jars2.1.2 Shipping Boxes2.1.3 Tubes and Crates2.1.4 Core Boxes2.2 LABELS2.2.1 Sample Jar Labels2.2.2 Shipping Box Labels2.2.3 Core Box Labels2.3 EQUIPMENT AND SUPPLIES2.3.1 Auger Boring and Sampling2.3.2 Drive Sample Boring and Sampling2.3.3 Undisturbed Sample Boring and Sampl
9、ing2.3.4 Core Drilling2.3.5 Pressure Testing (Hydraulic)2.3.6 Test Pit Excavation and SamplingPART 3 EXECUTION3.1 MOBILIZATION AND DEMOBILIZATION3.1.1 Mobilization3.1.2 Demobilization3.2 IDENTIFYING SAMPLES3.3 AUGER BORING AND SAMPLING3.4 DRIVE SAMPLE BORING AND SAMPLING3.5 UNDISTURBED SAMPLE BORING
10、 AND SAMPLING3.5.1 ProcedureSECTION 02 32 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5.2 Sealing3.5.2.1 Alternate 13.5.2.2 Alternate 23.5.2.3 Alternate 33.6 CORE HOLE OVERBURDEN DRILLING3.7 CORE DRILLING3.7.1 Procedure3.7.2 Arrangemen
11、t of Core3.7.3 Preservation of Core3.7.4 Labeling, Marking and Packing Core3.7.5 Disposition of Core3.8 PRESSURE TESTING (HYDRAULIC)3.9 TEST PIT EXCAVATION AND SAMPLING3.9.1 Excavation3.9.2 Sampling3.9.3 Disposition of Samples3.10 SUPPLEMENTAL BORINGS PITS3.11 BACKFILLING3.11.1 Drill Holes3.11.2 Tes
12、t Pits3.12 RECORDS- End of Section Table of Contents -SECTION 02 32 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 32 00 (May 2010)-Preparing Activity: USACE (CW) SupersedingUFGS-02 32 00 (April 2006)
13、UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 02 32 00SUBSURFACE DRILLING, SAMPLING, AND TESTING05/10*NOTE: This guide specification covers the requirements for determining the type, nature, and characteristics of subsurface materials as they e
14、xist to the depths and at the locations specified.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective pr
15、oject, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Rec
16、ommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).NOTE: TO DOWNLOAD UFGS GRAPHICSGo to http:/wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.*PART 1 GENERAL1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this parag
17、raph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs below should be inserted into Section 01 22 00.00 10.*SECTION 02 32 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Make all me
18、asurements for payment by or in the presence of the Contracting Officer. Preserve all holes in good condition until final measurement and until the records and samples have been examined and accepted. Payment will be made only for drilling and pressure testing those holes or for excavating those tes
19、t pits that are included in the SCHEDULE OF DRILLING, SAMPLING, AND TESTING, or are directed by the Contracting Officer to be so drilled or excavated. Payment will not be made for any hole or testing for which satisfactory records (and samples), as determined by the Contracting Officer, are not furn
20、ished.1.1.1 Mobilization and Demobilization1.1.1.1 PaymentPayment will be made for costs associated with mobilization and demobilization. Sixty percent of the Mobilization and Demobilization lump-sum price will be paid following completion of moving onto the site, including complete assembly in work
21、ing order, of all equipment necessary to perform the required drilling, sampling, pressure-testing and test pit excavation operations. The remaining 40 percent of the contract lump sum price will be paid after all site restoration is completed and all equipment has been removed from the site. No sep
22、arate payment will be made for moves between holes or test pits.1.1.1.2 Unit of MeasureUnit of measure: lump sum.1.1.2 Auger Boring and Sampling of Drill Holes1.1.2.1 PaymentPayment will be made for costs associated with Auger Boring and Sampling, _ mm inch Diameter Drill Holes.1.1.2.2 MeasurementAu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0232002010SUBSURFACEDRILLINGSAMPLINGANDTESTING 地下 土壤 钻探 取样 测试 PDF

链接地址:http://www.mydoc123.com/p-449516.html