1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 78 23.33 (February 2010)-Preparing Activity: USACEUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 78 23.33OPERATION AND MAINTENANCE MANUALS FOR
2、AVIATION FUEL SYSTEMS02/10PART 1 GENERAL1.1 REFERENCES1.2 CONTRACTOR RESPONSIBILITY1.3 SUBMITTALSPART 2 PRODUCTS2.1 DEVELOPMENT OF SUBMITTALS2.1.1 Operation and Maintenance System Instructions (OMSI) Submittal Requirements2.1.2 Assembly2.2 IDENTIFICATIONPART 3 EXECUTION3.1 OPERATING INSTRUCTIONS3.1.
3、1 Safety3.1.2 Operator Prestart3.1.3 Starting and Shutdown Procedures and Controls3.1.4 Normal Operating Instructions3.1.5 Emergency Operating Procedures3.1.6 Operator Service Requirements3.2 OPERATION INSTRUCTION TO GOVERNMENT PERSONNEL3.3 MAINTENANCE, SERVICE AND REPAIR INSTRUCTIONS3.3.1 Lubricati
4、on Instructions3.3.2 Table of Preventative Maintenance Instructions3.3.3 Preventative Maintenance Inspection3.3.4 Troubleshooting Guides and Diagnostic Techniques3.3.5 Removal and Replacement Instructions3.3.6 Maintenance and Repair Procedure3.4 PARTS MANUAL3.4.1 Contents3.4.2 Illustrations, Drawing
5、s, and/or Exploded Views3.4.3 End Item Manufacturers Part Numbers3.4.4 Components Assemblies/Parts3.4.5 AppendicesSECTION 01 78 23.33 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5 VALIDATION3.6 SPECIFIC EQUIPMENT SUBMITTALS3.6.1 Pressure
6、Gages3.6.2 Automatic Pump Controls3.6.3 Meters3.6.4 Oil/Water separator and Accessories3.6.5 Product Recovery Tank and Accessories3.6.6 Truck Offload System3.6.7 Hydrant Outlet Pits, Isolation Valve Pits, High Point Vent and Low Point Drain Pits3.6.8 Operating Tank Level Indicator3.6.9 Pantographs3.
7、6.10 Piping and Fittings3.6.11 Manual Valves3.6.12 Flexible Ball Joints3.6.13 Gaskets and Isolating Gasket Kits3.6.14 Strainers3.6.15 Protective Coatings3.6.16 Sample Connections3.6.17 Filter Separators3.6.18 Water Draw-Off System3.6.19 Pumps - Fueling, Offload, Fuel Transfer, Bowser Pumpoff Pump, P
8、roduct Return3.6.20 Flexible Hoses3.6.21 Control Valves3.6.22 Engine-Generator3.6.23 Fire Alarm and Fire Detecting System3.6.24 Motor Control Center3.6.25 Non-Automatic Transfer Switch3.6.26 Pump Control Panel (PCP)- End of Section Table of Contents -SECTION 01 78 23.33 Page 2Provided by IHSNot for
9、ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 78 23.33 (February 2010)-Preparing Activity: USACEUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 01 78 23.33OPERATION AND MAINTENA
10、NCE MANUALS FOR AVIATION FUEL SYSTEMS02/10*NOTE: This guide specification covers the requirements for O “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ t
11、ypically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation ar
12、e for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-10 Operation and Maintenance Da
13、taSystem Instructions; G; G, _PART 2 PRODUCTS2.1 DEVELOPMENT OF SUBMITTALS2.1.1 Operation and Maintenance System Instructions (OMSI) Submittal RequirementsOMSI submittals are required in order that complete documentation can be assembled to provide the Government “Activity“ with the necessary inform
14、ation and orientation to adequately operate and maintain the new structures/facilities of this project. The Contractor shall submit the OMSI documents and information specified for the equipment listed under the OMSI submittal paragraphs in each technical section. Five copies of each OMSI submittal
15、shall be forwarded to the Contracting Officer no later than 120-days prior to contract completion. OMSI submittals are to be submitted separate from and in addition to Contractors product approval submittals.2.1.2 Assembly*NOTE: If electronic copies of manuals are required, include last bracketed st
16、atement.*Provide submittals in separate folders consistent with the Contractors standard practice. Manufacturers manuals or data for the components, assemblies, subassemblies, and other operating parts which are provided shall be assembled into a loose-leaf notebook-type folder, indexed by major ass
17、embly and component in sequential order. Manuals shall be complete in all respects for all equipment, controls, and accessories provided. In SECTION 01 78 23.33 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-addition, provide an electronic cop
18、y of the manuals in Adobe Acrobat 8.0 or later (CD-ROM or DVD-ROM). Utilize Bookmarks to display indexing, and assembly and component requirements. 2.2 IDENTIFICATIONOn each folder identify and mark as follows:a. Inscribe on the cover, the words, “FUEL SYSTEM OPERATION AND MAINTENANCE MANUAL“, the n
19、ame and location of the building, and the contract number.b. Equipment manufacturer and/or Contractors address and telephone number; names, address and telephone numbers of each subcontractor installing equipment; and local representative for each item of equipment.c. Volume number and title of the
20、folder.d. The manual shall have a table of contents and be assembled to conform to the table of contents with the tab sheets placed beforeinstructions covering the subject. Sub-divide manuals or provideseparate manuals for each of the following categories.(1) Operating Instructions(2) Maintenance, S
21、ervice, and Repair Instructions(3) Parts ManualPART 3 EXECUTION3.1 OPERATING INSTRUCTIONSThe operators instructions shall include specific instructions and illustrations of the equipment operation required or recommended by the manufacturer as follows:3.1.1 SafetyInclude manufacturers safety precaut
22、ions to be observed while operating under all conditions for which the equipment was designed. Clearly list all major hazards to personnel and equipment safety that are peculiar to systems and equipment described in the manual.3.1.2 Operator PrestartInclude instructions for prestart checks, lubricat
23、ion, and service requirements necessary for setting up or preparing each system for use, warm up procedures, and verification of normal operation. Include control diagrams with data to explain detailed operation and control of each item of the equipment.3.1.3 Starting and Shutdown Procedures and Con
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS017823332010OPERATIONANDMAINTENANCEMANUALSFORAVIATIONFUELSYSTEMS 航空 燃料 系统 操作 维护 手册 PDF

链接地址:http://www.mydoc123.com/p-449514.html