ARMY UFGS-01 78 00-2011 CLOSEOUT SUBMITTALS.pdf
《ARMY UFGS-01 78 00-2011 CLOSEOUT SUBMITTALS.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-01 78 00-2011 CLOSEOUT SUBMITTALS.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 78 00 (August 2011)-Preparing Activity: USACE SupersedingUFGS-01 78 00 (May 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 78 00CLOSEOUT
2、 SUBMITTALS08/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 PROJECT RECORD DOCUMENTS1.3.1 Record Drawings1.3.1.1 Government Furnished Materials1.3.1.2 Working Record and Final Record Drawings1.3.1.3 Drawing Preparation1.3.1.4 Computer Aided Design and Drafting (CADD) Drawings1.3.1.5 Manually Prepa
3、red Drawings1.3.1.6 Payment1.3.2 As-Built Record of Equipment and Materials1.3.3 Final Approved Shop Drawings1.3.4 Construction Contract Specifications1.3.5 Real Property Equipment1.4 SPARE PARTS DATA1.5 PREVENTATIVE MAINTENANCE1.6 CERTIFICATION OF EPA DESIGNATED ITEMS1.7 WARRANTY MANAGEMENT1.7.1 Wa
4、rranty Management Plan1.7.2 Performance Bond1.7.3 Pre-Warranty Conference1.7.4 Contractors Response to Construction Warranty Service Requirements1.7.5 Warranty Tags1.8 MECHANICAL TESTING AND BALANCING1.9 OPERATION AND MAINTENANCE MANUALS1.9.1 Configuration1.9.2 Training and Instruction1.10 CLEANUP1.
5、10.1 Extraordinary Cleanup Requirements1.11 REAL PROPERTY RECORD1.12 NAVFAC SUSTAINABLE R 2009) Industrial and Institutional CleanersU.S. ARMY CORPS OF ENGINEERS (USACE)TR-06-X (2006; Supplement 2009) A/E/C (Architectural, Engineering, and Construction) CADD Standard - Release 3.0U.S. DEPARTMENT OF
6、DEFENSE (DOD)UFC 1-300-08 (2009, with Change 1) Criteria for Transfer and Acceptance of DoD Real Property1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Su
7、bmittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed
8、 through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ desi
9、gnation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for
10、 Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*SECTION 01 78 00 Page 4Provided by IHSNot for ResaleNo reproduction or
11、networking permitted without license from IHS-,-,-Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office
12、that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-03 Product DataAs-Built Record of Equipment and MaterialsWarranty Management PlanWarranty TagsFinal CleaningSpare Parts DataSD-08 Manufacturers InstructionsPreventative
13、 MaintenanceCondition Monitoring (Predictive Testing)InspectionPosted InstructionsSD-10 Operation and Maintenance DataOperation and Maintenance ManualsSD-11 Closeout SubmittalsRecord Drawings Certification of EPA Designated Items; GInterim Form DD1354; GChecklist for Form DD1354; GNAVFAC Sustainable
14、 G1.3 PROJECT RECORD DOCUMENTS1.3.1 Record Drawings*NOTE: The USACE policy on Record (As-Built) drawings is as follows:a. Method of Preparation for DoD Projects. The construction Contractor will prepare the final Record drawings, whether in manual or CADD format.b. Method of Preparation for Civil Wo
15、rks Projects. The preferred method of preparing the final Record drawings is by the construction Contractor. The management plan for the project must justify the preparation of the final Record drawings by any other method, such as by in-house personnel. Two such exceptions are “emergency constructi
16、on“ and operations work performed with hired labor. Revise the following specification paragraphs if as-builts are not to be done by the Contractor.c. Customer Coordination. The method of SECTION 01 78 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
17、 IHS-,-,-producing the record drawings and their format will be discussed with the customer at the beginning of a project, reflected in the Memorandum of Understanding with the customer (if applicable) and the management plan for the project, and confirmed with the customer before issuing the constr
18、uction solicitation.*Drawings showing final as-built conditions of the project. This paragraph covers record drawings complete, as a requirement of the contract. The terms “drawings,“ “contract drawings,“ “drawing files,“ “working record drawings“ and “final record drawings“ refer to contract drawin
19、gs which are revised to be used for final record drawings showing as-built conditions. The final CAD record drawings must consist of one set of electronic CAD drawing files in the specified format, 2 sets of prints, and one set of the approved working Record drawings. The manually prepared drawings
20、must consist of 1 set of completed final as-built original transparency drawings, 2 sets of blue-line prints of the transparencies, and the approved marked working as-built prints.1.3.1.1 Government Furnished Materials*NOTE: Edit this paragraph to specify manually prepared drawings or CADD files com
21、patible with the customers CADD system.*One set of mylar drawings revised to reflect all bid amendments will be provided by the Government at the preconstruction conference for projects requiring manually prepared record drawings electronic CADD files in the specified software and format revised to
22、reflect all bid amendments will be provided by the Government at the preconstruction conference for projects requiring CADD file record drawings.1.3.1.2 Working Record and Final Record DrawingsRevise 2 _ sets of paper drawings by red-line process to show the as-built conditions during the prosecutio
23、n of the project. Keep these working as-built marked drawings current on a weekly basis and at least one set available on the jobsite at all times. Changes from the contract plans which are made in the work or additional information which might be uncovered in the course of construction must be accu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0178002011CLOSEOUTSUBMITTALSPDF