ARMY MIL-T-48415-1974 TRACER PROJECTILE M3A1 ASSEMBLY PARTS FOR AND LOADING ASSEMBLING AND PACKING《M3A1型射弹曳光弹组装零件的装载 组装和包装》.pdf
《ARMY MIL-T-48415-1974 TRACER PROJECTILE M3A1 ASSEMBLY PARTS FOR AND LOADING ASSEMBLING AND PACKING《M3A1型射弹曳光弹组装零件的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-T-48415-1974 TRACER PROJECTILE M3A1 ASSEMBLY PARTS FOR AND LOADING ASSEMBLING AND PACKING《M3A1型射弹曳光弹组装零件的装载 组装和包装》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、-_ . MIL-T-48qL5 13 m 777770b O320062 5 W MIL-T-b8415(MU) i5 July 1974 MILITARY SPECIFICATION TRACER, PROJECTILE, M31, ASSEMBLY, PARTS FOR, AND LOADING, ASSEMBLING AND PACKAGING This specification is approved for use by allnepartments and Agencies of the Department of Defense. 1. SCOPE 1.1 This spec
2、ification covers the parts for, and the loading, assembling and packaging for one type of tracer designated as Tracer, Projectile, M3Al, As s embly . 2.1 The following documents of the issue in effect on date of invitation for bids, or request for proposal, form a part of this specification to the e
3、xtent specified herein. SPECIFICATIONS Federal PPP-B-601 PPP-B - 621 PPP-B-636 PPP-B-676 -Boxes , Setup -Boxes , Wood , Cleated-Plywood -Boxes, Wood, Nailed and Lock-corner -Boxes , Shipping , Fiberboard Military MIL-A-2550 -Ammunition, General Specification For n -B - 117 MIL-P- -Powder , Black MIL
4、-P-116 -Preservation-Packaging-Methods of -Bags, Sleeves and Tubing, - Interior Packaging STANDARDS Military MIL-STD-lo5 -Sampling Procedures and Tables for Inspection MIL-STD-109 IL-Sm-4i4 MIL-STD-1167 -Ammunition Data Card MIL-STD- -Lot Rumbering of Ammunition by Attributes -Quality Assurance Term
5、s and Definitions -Sampling Procedures and Tables for Inspection by Variables for Percent Defective FSC i315 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-T-YY25 23 W 777970b 03200b3 7 W 2.1 (Contd) MIL-STD -1234 -Pyrotechnics: Sampling, Insp
6、ection and MIL-STD - i235 Testing -Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes. DRAWINGS Armament Command Di1751175 -Tracer, Projectile, M31, Assembly C8796522 Packing Boxes LI -11751175 Tracer, Projectile, M31, Assembly -Marking Diagram and Sealing f
7、or Wood -Index of Inspection Equipment Lists for 2.2 Other hib1ications.-The following documents form a part of this specification to the extent specified herein. issue in effect on date of invitation for bids or request for proposal shall Unless otherwise indicated, the apply ANSI-B46.1 -Surface Te
8、xture (Application for copies should be addressed to the American National Standards Institute (ANSI), 1430 Broadway, New York, N.Y. 10018). ASTM Methods -American Society for Testing and Materials (Application for copies should be addressed to the American Society for Testing and Materials, 1916 Ra
9、ce Street, Philadelphia, Pa. 19103.) 3.1 General. 3.1.1 Tracer and igniter compositions.-The materials used in the tracer and igniter compositions shall comply with the requirements specified on the drawings and referenced specifications (See 3.7.1, 3.7.2, 4.3.3.1, 4.4.1 Weighed ani the-weight recor
10、ded, for 4 hours at a temperature of i50 degrees Fahrenheit (15OOF). sample shall be reweighed to accept or reject on the results (see 3.7.4, 4.3.3.3 Then th sample shall be placed-in an oven After this the & 6.6). 4.4.4 Failure of the heat seal test of the sealed barrier bag is a major defect. Samp
11、ling, ecceptance criteria and testing procedures for this test shall be as required in specification z-p-116 (see 3.8, 4.3.3.4 & 6.7). 4.4.5 Residual stresses - Cup, Initiator.-The purpose of this mercurous nitrate test is to detect residual stresses in brass components which could result in cracks
12、or splits during extended ammunition storage. pieces maximum. subject a sample of 25 pieces of each sub-lot to this test, be rejected if one or more initiator cups of the sample shows a split. Lot size to be 100,000 Divide the lot into Sub-lots of 10,000 pieces equally and The sub-lot shall 12 Provi
13、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-T-484iS 13 = 9999906 032007Li 1 MIL-T-48415 (Mu) 4.4.5.1 Mandatory safety requirememts. 4.4.5.1.1 Food shall not be eaten or stored in the laboratory or space in which these tests are conducted. 4.4.5.1
14、.2 Acid resistant apron and gloves or the equivalent shall be worn by each test technician. 4.4.5.1.3 Face shields shall be worn at all times during the pouring or mixing of acids and water. of this test. Safety glasses shall be worn during other phases 4.4.5.1.4 Asbestos or heat insulating gloves s
15、hall be worn during the heat volatilization phase of the test to facilitate handling. 4.4.5.1.5 During the entire period of volatilization the oven door shall be closed, 4.4.5.1.6 Extreme care shall be exercised in the mixing of acid with water and shall only be accomplished by the pouring of the ac
16、id into the water, 4.4.5.1.7 This test shall be conducted under canopy or hood having a forced draft ventilation system to remove the noxious fumes. of tested components local regulations shall be observed. In the disposition 4.4.5.2 Preparation for test. The initiator cups are submerged in an aqueo
17、us solution of nitric acid (40% by volume of 1.42 specific gravity nitric acid in distilled water) for thirty seconds and are then rinsed thoroughly in cold running water. 4.4.5.3 Method of conducting test, 4.4.5.3.1 The aqueous mercurous nitrate solution used in this tes: shall consist of 10 grams
18、of mercurous nitrate and 10 milliliters of nitric acid (spec. gr. 1.42) per liter of solution. 4.4.5.3.1.1 The aqaeous -ercurous nitrate solution container shall be equipped with a suitable grid or screen in the bottom to permit full access of the solu- tion to the head of the initiator cup, The lev
19、el of the solution in the container shall be such that the initiator cup is completely submerged when standing upright on tiie grid or screen, 4.4.5.3.2 The initiator cups shall then be immersed uprigiit in the mercur- ous nitrate solution for 15 minutes. water and drained. They are then rinsedthoro
20、ughly in cold running 4.4.5.3.3 After completion of tne procedure of 4.4.5.3.2, the initiator cups are then placed in an oven or other suitable heat source tovolatilize the mercury. When the mercury has been completely mlatilized, the initiator cups 4.4.5.3.4 are examined under a magnification of 10
21、 to 15 power for cracks or splits. 13 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ - MIL-T-4Y15 13 7797706 0320075 3 I MIL-T-48415(MU) 4.4.5,4 Definitions 4.4.5.4.1 A split is a separation of metal entirely through the wall or head 4.4.5.4,2 A c
22、rack is a surface condition in which the separation of the metal 4.4.5.5 Recording of data. 4.4.5.5.1 The results of the test shall be recorded 4.4.5.5.2 The test record shall be reproduced and cupies distributed as of the initiator cup. does not go entirely through the wall or head of the initiator
23、 cup. (See 4.4.5.6). directed by the responsible agency for the acceptance of the item (See 6.13). 4.4.5.6 Suggested Format MERCUROUS NITRATE TEST - ACCEPTANCE REPORT End Item: - Tracer, Projectile Assembly, M3Al Part Name: - Cup, Initiator Part No.: - i75i179 Contractor: - Contract No. : - Lot: - S
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILT484151974TRACERPROJECTILEM3A1ASSEMBLYPARTSFORANDLOADINGASSEMBLINGANDPACKINGM3A1 型射弹 曳光弹 组装 零件

链接地址:http://www.mydoc123.com/p-448669.html