1、li MILITARY STANDARD FLOW CHECK, LUBRICATING OIL; PROCEDURE FOR MIL-STD-342( AT) 26 Mav 1988 SUPERSEDING (see 6.3) I AMSC NIA AREA QCIC DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THIS DOCUMENT CONTAINS 16 PAGES. Provided by IHSNot for ResaleNo reproduction or n
2、etworking permitted without license from IHS-,-,-MIL-STD-3Y2 dC W 9999733 00b0024 O 9 DEPARTMENT OF DEFENSE Washington, DC 20301 Flow Check, Lubricating Oil; Procedure for 1. This Military Standard is approved for within the US Army Tank-Automotive Command, Department of the Army, and is available f
3、or use by all Departments and Agencies of the Department of Defense. 2. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: U Army Tank-Automotive Command, ATTN: AMSTA-GDS, Warren, MI 48397-5000, by
4、 using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. ii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-STD-3q2 QC W 77777LL 0060025 2 9 MIL-STD-342( AT) FORE
5、WORD This standard provides the means for checking the oil flow through the AGT 1500 engine. i ii Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Paragraph 1 . 1.1 2 . 2.1 2.1.1 2.2 2.3 3 . 4 . 4.1 4.1.1 4.1.2 4.1.4 4.1.3 5 . 5.1 5.2 5.3 5.4 5.46 1 5
6、.4.2 5.4.3 5.4.4 f 6. 6.1 6.2 6.3 Table I . CONTENTS SCOPE scope 1 1 DEFINITIONS (Not applicable). GENERAL REQUIREMENTSar.,. Equipment . Flow-checking medium Flow bench Pressure gage . Lines. fittings. and fixtures . DETAILED .QUIIIE.NTS Preliminary precautions . Configuration . Procedure . Pressure
7、 gage location Flow reading Flow check test . Residual magnetism Flow rate. pressure. and temperature 3 NOTES Intended use Subject term (key word) listing . Supersession data . TABLE Flow check requiLements. . IV 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license
8、from IHS-,-,-MIL-STD-3q2 QC W 7777733 0060027 b MIL-STD-342( AT) 1. SCOPE 1.1 Scope. This standard covers a standard procedure for checking the oil flow through parts, subassemblies, and assemblies of the AGT 1500 engine. 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without
9、 license from IHS-,-,-I- MIL-STD-392 QC - 77777ltl 0060028 8 - 2. REFERENCED DOCUMENTS 2.1 Government document. 2.1.1 Specification. Unless otherwise specified, the following specification of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) s
10、pecified in the solicitation forms a part of this standard to the extent specified herein. SPECIFICATION MILITARY MIL-L-23699 - Lubricating Oil, Aircraft Turbine Engine, Synthetic Base. (Copies of specifications required by contractors in connection with specific acquisition functions should be obta
11、ined from the contracting activity or as directed by the contracting officer.) 2.2 Other publication. The following document forms a part of this standard to the extent specified herein. Unless otherwise specified, the issue of the document which is DOD adopted shall be that listed in the issue of t
12、he DODISS specified in the solicitation. The issue of the document which has not been adopted shall be that in effect on the date of the cited DODISS. AVCO LYCOMING DIVISION 91547-LTCT5398 - Spray Fixture, /Il Bearing Housing. P6828 - Residual Magnetism Inspection. * (Application for copies should b
13、e addressed to the US Army Tank-Automotive Command, ATTN: AMSTA-GDS, Warren, MI 48397-5000.) 2.3 Order of precedence. In the event of a conflict between the text of this standard and the references cited herein, the text of this standard shall take precedence. 2 Provided by IHSNot for ResaleNo repro
14、duction or networking permitted without license from IHS-,-,-c 1 MIL-STD-342 QC 77779LL O060029 T MIL-STD-342(AT) 3. DEFINITIONS (Not applicable) .3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-342 dC 7779731i OObO030 b M MIL-STD-3421AT) 4
15、. GENERAL REQUIREMENTS 4.1 Equipment . 4.1.1 Flow-checking medium. The flow-checking medium shall be oil conforming to MIL-L-23699. 4.1.2 Flow bench. The flow bench shall be calibrated for and capable of The flow measurement shall be accurate to flowing oil up to 5x0 pounds per hour (pph) at a fluid
16、 temperature of 95 to 100 degrees Fahrenheit (OF). within plus or minus (+) - 2 percent (%). 4.1.3 Pressure gage. The pressure gage shall be a suitable aircraft type, calibrated to 100 pounds per square inch gage (psig) and having an accuracy of f 1%. 4.1.4 Lines, fittings, and fixtures: a. Lines an
17、d fittings. Suitable aircraft-type lines and b. Fixtures. When required, suitable fixturing shall be used fittings shall be used. for parts, subassemblies, and assemblies being flow checked. NOTE: No restriction smaller than the inside diameter of the inlet port shall be allowed. 4 Provided by IHSNo
18、t for ResaleNo reproduction or networking permitted without license from IHS-,-,-5. DETAILED REQUIREMENTS 5.1 Preliminary precautions. Before flow checking parts, subassemblies, and assemblies, the following precautions shall be observed: a. Check for residual magnetism. Magnetism shall not exceed b
19、. C. All assembly requirements, such as the installation of three (3) gauss. All oil holes, grooves, and passages shall be clean and free of burrs . O-rings and seals, correct bolt torques, and bearing pinch, shall be met. mandatory. The locking of bolts, nuts, etc. shall not be 5.2 Configuration. P
20、arts, subassemblies, and assemblies requiring a flow check shall be as specified in table I by part number and description. - 5.3 Flow rate, pressure, and temperature. Flow rate, pressure, and temperature requirements for parts, subassemblies, and assemblies requiring a flow check shall be as specif
21、ied in table I. The pressures listed in table I shall be considered as actual part, subassembly, and assembly inlet port pressure requirements. 5.4 Procedure. 5.4.1 Pressure gage location. The pressure gage (see 4.1.3) shall be located within 1 inch of the inlet port of the part, subassembly, or ass
22、embly being flow checked or on the fixture being used. 5.4.2 Flow readina. The flow reading shall be obtained under the conditions specified in table I. The part, subassembly, or assembly shall be verified to meet the specif ied flow requirements . 5.4.3 Flow check test. All parts, subassemblies, an
23、d assemblies shall be tested as follows: a. Determine the pressure drop across the inlet fixturing (section of line, fitting, or fixture after pressure gage). Increase the inlet pressure by the amount equal to the pressure drop ( P). Record the flow measured with the pressure specified in table I at
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILSTD3421988FLOWCHECKLUBRICATINGOILPROCEDUREFOR 机油 流速 检查 PDF

链接地址:http://www.mydoc123.com/p-448389.html