ARMY MIL-STD-331 C CHANGE 1-2009 FUZE AND FUZE COMPONENTS ENVIRONMENTAL AND PERFORMANCE TESTS FOR《环境和作业测试引信和引信组件》.pdf
《ARMY MIL-STD-331 C CHANGE 1-2009 FUZE AND FUZE COMPONENTS ENVIRONMENTAL AND PERFORMANCE TESTS FOR《环境和作业测试引信和引信组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-STD-331 C CHANGE 1-2009 FUZE AND FUZE COMPONENTS ENVIRONMENTAL AND PERFORMANCE TESTS FOR《环境和作业测试引信和引信组件》.pdf(286页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-STD-331C w/CHANGE 1 22 June 2009 SUPERSEDING MIL-STD-331C 5 JANUARY 2005 DEPARTMENT OF DEFENSE TEST METHOD STANDARD FUZE AND FUZE COMPONENTS, ENVIRONMENTAL AND PERFORMANCE TESTS FOR AMSC N/A FSG 13GP DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREME
2、NT SENSITIVE Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-331C w/CHANGE 1 iiFOREWORD 1. This standard is approved for use by all Departments and Agencies of the Department of Defense. 2. MIL-STD-331C supersedes MIL-STD-331B, dated 1 Decemb
3、er 1989, including all change notices. It has been prepared in accordance with MIL-STD-962C and complies with DoD policy for greater use of commercial products and practices. 3. MIL-STD-331 is a test method type standard. Its scope has evolved over the years reflecting increased standardization of e
4、nvironmental and performance tests among the services and improvements in fuze design, test technology and safety. MIL-STD-331B was largely an editorial effort to consolidate test methods and restructure the standard. Attention is directed to the test grouping and use of standard, alternate and opti
5、onal test methods described in sections 5.2 and 5.4 respectively. 4. In the process of reorganization, tests were renumbered. Where old test numbers are still referenced in fuze specifications and test plans, Table I is included to show the correspondence between prior test numbers and the new numbe
6、rs. 5. Design agencies are cautioned that the existence of this standard does not relieve them of the responsibility to define the environments the fuze will be exposed to during its life cycle. This definition is essential for proper test selection and the identification of any required test deviat
7、ion. Specification of the test method alone in a test directive may not adequately define the conditions in which a test is conducted. Many test methods in this standard include parameters or options which permit tailoring to specific fuze designs, environments and uses. Table II results from the co
8、ncern for properly invoking the use of test methods. The use of Table II and careful review of the entire test method is strongly encouraged when preparing development or production specifications and test plans. 6. Paragraph numbers in each test have been modified to include the test method number.
9、 Although this makes the numbers longer, each paragraph in the standard is now uniquely identified. This is intended to reduce confusion when referencing specific material. 7. MIL-STD-331C includes three new tests (D6, D7 and D8) and two revised tests (F2.1 and F4.1). Test D6, Brush Impact No-Fire T
10、est has been included to verify the performance of an armed anti armor munition demonstrating it will penetrate light foliage such as brush. Test D7, Mortar Ammunition Fuze Double Loading Test has been included to determine, in the event of double loading, whether the contour of the ogive of the pro
11、jectile fuze can initiate the round dropped on it. Test D8, Progressive Arming Test has been included to determine the correlation between the position of the explosive train interrupter and the probability of explosive transfer. 8. Test B1.1, Transportation Vibration (Bare and Packaged Fuzes), repl
12、aces both Tests B1 and B2. It employs the use of random vibration test techniques and can be tailored to various land, sea and air transportation scenarios. All former sinusoidal vibration test methods have been retained as alternate tests in Section B1.6 and may be specified for procurement of olde
13、r fuzes which cannot comply with the requirements of the random vibration test schedules. 9. Design agencies which frequently use other fuze and explosive component tests or variations of tests contained in this standard are requested to furnish this information to the preparing activity (see addres
14、s above) for possible inclusion in MIL-STD-331. 10. Comments, suggestions, or questions on this document should be addressed to: US Army, Research, Development and Engineering Command, Armament Research, Development and Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
15、ense from IHS-,-,-MIL-STD-331C w/CHANGE 1 iiiEngineering Center, ATTN: RDAR-QES-E, Picatinny Arsenal, NJ 07806-5000 or emailed to ardecstdznconus.army.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online data base at http:
16、/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-331C w/CHANGE 1 ivSUMMARY OF CHANGE 1 MODIFICATIONS 1. Test C1 - Temperature and Humidity, TABLE C1-1 and TABLE C1- II: the start and stop times on two-cycle days were corr
17、ected. 2. Test D1 - Primary Explosive Component Safety Test: a second part was added to determine the numerical effectiveness of the interrupter. 3. Test D1 - Primary Explosive Component Safety Test, section D1.6 - Alternate and Optional Tests: the Missing Barrier Test was added; the paragraphs for
18、the cookoff test for projectile fuzes and the fast cookoff test for fuzes were deleted. 4. Test D1 - Primary Explosive Component Safety Test, section D1.7.2 - Bibliography: the bibliography was updated. 5. Test D2 - Arming Distance Test, section D2.5.1 - Arming procedure: the four statistical method
19、s listed were removed and transferred to Appendix G. 6. Test D-8 - Progressive Arm Test: the use of this test to determine the numerical effectiveness of the interrupter was addressed. Definitions and procedures for testing pyrotechnic trains were added. 7. Appendix G - Statistical Methods to Determ
20、ine the Initiation Probability of One-Shot Devices: this is a new Appendix to the document. The four statistical methods removed from Test D2 are included in this Appendix while the Neyer D-Optimal method was added as a fifth method. 8. Typographical and formatting errors were corrected throughout t
21、he document. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-331C w/CHANGE 1 vCONTENTS Section Page 1 SCOPE 1 1.1 Scope 1 1.2 Safety and Suitability for Service Assessment of Fuzing Systems 1 1.2.1 NATO 1 1.2.1.1 STANAG 4157 1 1.3 Application
22、 3 1.4 Test identification 3 1.5 Method of revision 3 1.6 Method of reference 3 2 APPLICABLE DOCUMENTS 3 2.1 Government documents 3 2.1.1 Specifications, standards and handbooks 3 2.1.2 Other Government documents, drawings and publications 4 2.2 Non-Government publications 5 2.3 Order of precedence
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILSTD331CCHANGE12009FUZEANDFUZECOMPONENTSENVIRONMENTALANDPERFORMANCETESTSFOR 环境 作业 测试 引信 组件 PDF

链接地址:http://www.mydoc123.com/p-448386.html