ARMY MIL-R-60443-1967 RELAY EXPLOSIVE XM11《XM11型炸药继电器》.pdf
《ARMY MIL-R-60443-1967 RELAY EXPLOSIVE XM11《XM11型炸药继电器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-R-60443-1967 RELAY EXPLOSIVE XM11《XM11型炸药继电器》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、+. . -I MIL-R-60443 13 7779706 0338438 Li m -. I 5-3-i-/9 MIL-R-60443 (MU) 21 APRIL 1967 MILITARY SPECIFICATION RELAY, EXPLOSIVE, XM11 1. SCOPE for Inspection by Attributes (ABC- . 1.1 This specification covers one type of STD-105). explosive relay designated as Relay, Explo- sive, XM11. MIGSTD-109
2、- Quality Assurance 2. APPLICABLE DOCUMENIB Terms and Defini- tions. MIGSTD-1168 - Lot Numbering of . 2.1 The following documents of the issue Ammunition. in effect on date of invitation for bids or re- quest for proposal, form a part of this speci- fication to the extent specified herein. MIGSTD-12
3、35 - Single and Multi- levei Continuous. Sampling Proce- dures and Tables SPECIFICATIONS for Inspection by - MILITARY Attributes. B MIL-P-116 - Preservation, Meth- ! ods of. DRAWNGS . MIL-A-2550 - Ammunition and U.S. hMY MUNITIONS COMMAND Special Weapons, General Specifics: tion for. ? MILI46607 - I
4、nspection Equip- I : ment, Supply and Maintenance of. I i PTANDARDS s i MILITARY i MIGSTD-105 - Sampling Proce- ! .- f -I 7548347 - Box, Set-up, Packing, Am- munition, for Relays and Primers. 7548388 - Box, Packing, Ammunition, for Relays M4, M5, M7, XM10 or Primer, XM42. 7548389 - Box, Set-up, Pack
5、ing, Am- munition Inner for Re- lays or Primers. ;: 4.2 Government verftcation. Using the contractors written quality assurance proce- dure, this detailed specificatiox, the applica- ble drawings, and other contractual docu- ments as a guide, the Government inspector shall verify, at unscheduled int
6、ervals, all quality assurance operations performed by the contractor. Verification will be performed to the extent necessary to assure compliance with the contractual requirements. Severity of Government inspection of individual char- acteristics will be directly related to the ser- iousness of the
7、classification assigned. In no instance will a characteristic classified “Crit- ical” be accepted solely on the basis of the contractors records. 4.2 First article inspection. 4.2.1 Submission. The contractor shall sub- mit a first article quantity to a Government- approved facility as designated by
8、 the Con- tracting Officer (see 6.1) for evaluation in accordance with provisions of 4.2.2. The first article sample shall consist of the following: a. Twenty-five (25) of each component. b. Two hundred (200) loaded assemblies. All components and completed assemblies shall have been produced by the
9、contractor or furnished by a supplier and which have been manufactured using the same produc- tion processes, procedures and equipment as will be used in fulfilling the contract. All parts and materials, including packaging and packing, shall be obtained from the same sources of supply as will be us
10、ed in regular production. The sample shall be accompanied by certificates of conformance for materials. A first article sample, or portion thereof, as directed by the Contracting Officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a
11、change occurs in manufactur- ing process, material used, drawing, specifi- cation, or source of supply as to significantly affect product uniformity as determined by the Government. Prior to submission, the contractor shall inspect the sample to the -3 -. Provided by IHSNot for ResaleNo reproduction
12、 or networking permitted without license from IHS-,-,-m- MIL-R-604q3 13 7779706 0338441 4 . MILR-3 (Mu) degree necessary to assure that it conforms to the requirements of the contract and sub- mit a record of this inspection with the sam- ple. A sample containing known defects will not be submitted
13、unless specifically author- ized by the Contracting Officer. 4.2.2 Inspections to be performed. Com- ponents and completed assemblies will be subjected by the Government to all the exam- inations or tests specified in 4.3.2 and 4.3.3 of this specification, and any or all require- menta of the applic
14、able dragngs. In addi- tion, the following test shall be performed. Thereafter, testing shall be as specified in 4.3.2 and 4.3.3. 4.2.2.1 Functioning (see 3.4). The two hundred (ZOO) Ioaded relay assemblies shall be subjected to the functioning test as speci- fied in 4.4.2 using equipment in accorda
15、nce with 4.3.4. 4.2.3 Rejection. If any component or relay assembly fails to comply with any of the ap- plicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate its inspection upon any failure of a component or relay assembly in the sample to
16、comply with any of the stated requirements. In the event of rejec- tion, the Government reserves the right to require the contractor to take corrective ac- tion and submit a new first article sample or portion thereof. Until a first article sample is accepted, the contractor is in no way authorized
17、by the Government to resume reg- ular production unless otherwise directed by the Contracting Officer. 4.3 Inspection provisions. 4.3.1 Lot formation. The term “Lot” as used throughout this specification refers to an in- spection lot, which is defined as an essentially homogeneous collection of unit
18、s of product from which a representative sample is drawn and inspected to determine conformance of the lot with applicable requirements. The samnle selected shall represent only that 4 f quantity of units from which the sample was drawn and shall not be construed to rep- resent any prior or subseque
19、nt quantities - presented or inspection. Homogeneity shall be considered to exist provided the lot has been produced by one manufacturer, in one unchanged process, in accordance with the same drawing, same drawing revisibn, same specification and same specification revision. Changes to the process,
20、specification or draw- ing not affecting safety, performance, inter- changeability, or storage, as determined by the Government, shall not be deemed to alter the homogeneity of the lot. The lot shall con- tain (a) Parts of one lot interfix number from manufacturer. (b) Lead azide from not more than
21、one lot. The inspection lot shall comply with MIL STD-105 and shall be numbered in accord- ance with MIGSTD-1168: Unless otherwise approved by the Contracting Officer, the in- spection lot size of end items deliverable un- der the contract shall be not less than the smallest weekly estimate of quant
22、ities con- tractually scheduled for production during the contract period, nor more than the Iarg- est monthly quantity contractually scheduled for delivery during the contract period. In- spection lots for components of subassem- blies, other than the items of delivery, shall be homogeneous and of
23、a size mutually con- venient to both the contractor and the Gov- ernment inspector. 1.3.2 Examination. Sampling plans and procedures for the following classifications of defects shall be in accordance with MIL- STD-105 (ABGSTD-105), except that, in- spection for Critical defects shall be 100 per- ce
24、nt. Contractors sampling plans, if used. shall be approved by the Government, and shall provide, as a minimum, the protection afforded the Government by the sampling plans in MIGSTD-105 (ABCSTD-105). Continuous sampling plans in accordance with MIGSTD-1235 may be used if ap- 1 _. Provided by IHSNot
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILR604431967RELAYEXPLOSIVEXM11XM11 炸药 继电器 PDF

链接地址:http://www.mydoc123.com/p-447820.html