ARMY MIL-P-70674-1988 PROJECTILE 155MM M864 METAL PARTS FOR BASE BURNER ASSEMBLY《M864式155 mm射弹底排组件用金属件》.pdf
《ARMY MIL-P-70674-1988 PROJECTILE 155MM M864 METAL PARTS FOR BASE BURNER ASSEMBLY《M864式155 mm射弹底排组件用金属件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70674-1988 PROJECTILE 155MM M864 METAL PARTS FOR BASE BURNER ASSEMBLY《M864式155 mm射弹底排组件用金属件》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、hIL-P-7067q 13 W 7777906 0356676 O R s-37-K MIL-P-70674 4 April 1988 MILITARY SPECIFICATION PROJECTILE 155MM: XM864 METAL PARTS FOR BASE BURNER ASSEMBLY This specification is approved for use within the U.S. Army Armament Munitions and Chemical Command, and is available for use by all Departments an
2、d Agencies of the Department of Defense. SCOPE 1. - 1.1 Scope. This specification covers the requirements, quality evaluation provisions, and packing for Base Burner Assembly Metal Parts for the XM864 projectile. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. T
3、he following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified (see 6.2), the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplemen
4、t thereto, cited in the solicitation. 0 SPECIFICATIONS MI LI TARY MIL-A- 48 O 7 8 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in Improving this document
5、 should e addressed to: Commander, U.S. Army Armarnent,Munitions and Chemical Command, Atm. AMSMC-QA. Picatinny Arsenal, New Jersey 07806-5000 by using the self-addressed Standardiza- tion Document Improvement Proposal (DD Form 1426) appearing et the end of this document or by letter, AMSC N/A FSC 1
6、320 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 0 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70679 13 7777706 035bb77 2 E MIL-P-70674 (AR) MI LI TARY MIL-STD-105 - Sampling Procedures and Tables for MI
7、L-STD-1169 - Packaging, Packing and Marking for MIL-STD-1235 - Single and Multilevel Continuous Inspection by Attributes Shipment of Inert Ammunition Components Sampling Procedures for Sampling by Attributes 2.1.2 Other Government documents, drawinqs, and publications. The following other Government
8、 documents, drawings, and publications form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS U .S. ARMY ARMAMENT, RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) PRODUCT AND PAC
9、KING DRAWINGS 8597488 8822518 9 381110 9381116 Plug CUP Re ta ine r Housing, Igniter (Copies of specifications, standards, handbooks, drawings, and publications required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed b
10、y the contracting activity.) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing
11、in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 General. Materials, parts and assemblies shall comply with the requirements specified on the applicable drawings and referenced specifications. 3.2 Defec
12、t standards. Defect standards must be approved by the technical engineering agency. All visual standards for defects will be established for each contract after the first months production or whenever requested by the contracting activity . 2 Provided by IHSNot for ResaleNo reproduction or networkin
13、g permitted without license from IHS-,-,-MIL-P-70674 13 I 777730b 0356678 4 I O I . I l l MIL-P-70674 (AR) 3.3 First article inspection. When specified in the contract or purchase order, a sample shall be subjected to first article inspection in accordance with the technical provisions herein (see 4
14、.3) 3.4 Control dimensions. 3.4.1 Tool control dimensions. Dimensions marked tool control shall be gaged after eight hours maximum production on each machine in operation and prior to any tooling change. Where destruction of components is necessary to inspect these dimensions, measurements of the to
15、ol may be substituted provided the contractor has established correlation between the tool dimension and the component dimensions prior to the start of production. The contractor shall be responsible for maintaining adequate surveillance and to institute corrective action that assures drawing requir
16、ements are being met throughout the life of the tool. 3.4.2 Process control dimensions. The contractor shall prepare a process control plan for the dimensions marked process control. The plan shall be submitted to the technical agency for approval prior to use. Dimensions to be gaged for process con
17、trol are to be assured to a .40% AQL. 3.5 Protective finish. Details of the proposed procedure for protective coating the various components shall be submitted in writing to the Government Technical Agency and written approval received prior to initiation of production. The proposed procedure shall
18、include materials, process and equipment to be used by the contractor, detailed method of control including limits for time, temperature, concentration and all other information pertinent to the process. Approval of process, materials, or equipment implies no guarantee of acceptance of the results o
19、btained in use. 3.6 Workmanship. The requirements for workmanship are as specified on the applicable drawings, referenced specifications and the following: 3.61 Burr and sharp edges. No component shall have a burr or sharp edge which might interfere with assembly or function of the item or which mig
20、ht be injurious to personnel handling the item. 3.6.2 Foreign matter. All parts and assemblies shall be free of chips, dirt, grease, oil, rust, or other foreign matter which may interfere with final inspection and completely free of same prior to shipping. i l. 3 i Provided by IHSNot for ResaleNo re
21、production or networking permitted without license from IHS-,-,-MIL-P-70674 13 W 7979906 035bb79 b W MIL-P-70674 (AR) 3.6.3 Threads. Threads shall be full and undamaged, for the entire minimum length or depth as required by the applicable drawings. 3.6.4 Painting. Painting shall be complete, void fr
22、ee, and undamaged. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibi-lity for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements and for the provisions of MIL-A-48078 as specified herein. Except as o
23、therwise specified in the contract or purchase order, the contractot- may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP706741988PROJECTILE155MMM864METALPARTSFORBASEBURNERASSEMBLYM864 155 MM 射弹底排 组件 金属件 PDF

链接地址:http://www.mydoc123.com/p-446930.html