ARMY MIL-P-70674 (2)-1991 PROJECTILE 155MM M864 METAL PARTS FOR BASE BURNER ASSEMBLY《M864式155 mm射弹底排组件用金属件》.pdf
《ARMY MIL-P-70674 (2)-1991 PROJECTILE 155MM M864 METAL PARTS FOR BASE BURNER ASSEMBLY《M864式155 mm射弹底排组件用金属件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70674 (2)-1991 PROJECTILE 155MM M864 METAL PARTS FOR BASE BURNER ASSEMBLY《M864式155 mm射弹底排组件用金属件》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、INCH-POUND MIL-P-70674 (AR) AMENDMENT 2 22 May 1991 SUPERSEDING AMENDMENT 1 3 April 1989 MILITARY SPECIFICATION PROJECTILE, 155MM: M864 METAL PARTS FOR BASE BURNER ASSEMBLY This Amendment forms a part of Military Specification MIL-P-70674 (AR), dated 4 April 1988, and is approved for use by the U.S.
2、 Army Armament Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Title: Change projectile nomenclature: From: I1XM864l1 To: If M8 6 4 II 1.1, Scope: Change projectile nomenclature: From: 1fXM86411 To: “M8 6 4 II * 2.1.1, Spec
3、ifications and Standards: Add the new military specification: “MIL-STD-4 14 - Sampling Procedure and Table for Inspection by Variables for Percent Def ectivel FSC 1320 1 of 18 m,sc N/A - DISTIRBUTION STATEMENT A. Approved for public release; distribution is unlimited. O Provided by IHSNot for Resale
4、No reproduction or networking permitted without license from IHS-,-,-, MIL-P-70674 (2) 13 9999906 0486583 7 /*; *h r* MIL-P-70674 (AR) AMEMDMENT 2 * 2.1.2, Other Government Documents, Drawings, and Publications: Add the new Product Drawing (ARDEC) : “9 3 8 1 13 0 - Base Burner Assembly“ PAGE 2 * 2.2
5、 Order of precedence: Change paragraph: From: “2.2 Order of precedence. In the event of a conflict between the text of this specification and the reference cited herein, (except for associated detail specifications, specification sheets, or MS standards), the text of this specification shall take pr
6、ecedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained .It To: “2.2 Non-Government publications. The following document(s) form a part of this document to the extent specified herein. Unless otherwise specified,
7、 the issues of the documents which are DoD adopted are those listed in the issue of the DODISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of the documents cited in the solicitation (see 6.2). AMERICAN NATIONAL STANDARD INSTI
8、TUTE (ANSI) ANSI Zl.1 - Guide for Quality Control Charts ANSI 21.2 - Control Chart Method of Analyzing Data ANSI 21.3 - Control Chart Method of Controlling Quality During Production (Application for copies should be addressed to American National Standards Institute, 1430 Broadway, N.Y. , N.Y. 10018
9、.) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70674 (AR) AMENDMENT 2 * 2., APPLICABLE DOCUMENTS: Add new subparagraph 2.3: “2.3 Order of precedence. In the event of a conflict between the text of this document and the reference cited her
10、ein the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.“ PAGE 3 fe 3.4.2, Process Control Dimensions: Change the last sentence: From: “Dimensions to be gaged for process control are t
11、o be assured to a -40% AQL.“ To : “Dimensions to be gaged for process control are to be assured to a 0.40 AQL.“ PAGE 6 TABLE I: Change item designation in title: From: “XM864“ To: . I M 8 6 4 I PAGE 7 4.4.2, Examination: Add new subparagraph 4 . 4.2 .c : II c. Statistical process control (SPC). For
12、those dimensions identified in the Classification of Defects Tables by referencing Appendix A, the contractor must utilize the principles of SPC as defined herein, ANSI 21.1, ANSI Z1.2, ANSI 21.3 and Appendix A. When the contractor satisfies the control conditions identified in Appendix A, acceptanc
13、e will then be by SPC. The SPC sample size and frequency of selection shall be determined by the contractor. If the SPC sample is to be less than four (4) 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-* MIL-P-70674 (2) 13 = 9997906 0486585 0 MIL-
14、P-70674 (AR) AMENDMENT 2 - I i items per hour, then the approval of the procuring agency must be sought prior to the elimination of sampling inspection for acceptance. The contractor may request to implement SPC acceptance for any other feature that is not annotated in the classification for defects
15、 by requesting approval of the procuring agency and by meeting all the conditions specified in this specification. When not accepting product by SPC acceptance of product for those features identified by referencing Appendix A will only be in accordance with MIL-STD-414 or MIL-STD-1235 plans CSP - 1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP7067421991PROJECTILE155MMM864METALPARTSFORBASEBURNERASSEMBLYM864 155 MM 射弹底排 组件 金属件 PDF

链接地址:http://www.mydoc123.com/p-446928.html