ARMY MIL-P-60592-1966 PROJECTILE 90MM TP-T M353 METAL PARTS ASSEMBLY《M353式90 mm曳光训练弹(TP-T)用金属部件的组装》.pdf
《ARMY MIL-P-60592-1966 PROJECTILE 90MM TP-T M353 METAL PARTS ASSEMBLY《M353式90 mm曳光训练弹(TP-T)用金属部件的组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60592-1966 PROJECTILE 90MM TP-T M353 METAL PARTS ASSEMBLY《M353式90 mm曳光训练弹(TP-T)用金属部件的组装》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、m-60592 (MU) BUPERSEDING 25 July 1966 FA-PD-MI-2597, Rev. O MILITARY SPECIFIGATTON PROJECITLE, 9OMM, TP-T, M353 mm PARTS ASSEMBLY 1. SCOPE 1.1 This specification covers Projectile, 9OMM, TP-T, M353 Metal Parts Assembly. 2. APPLICABLE DO(JME3ZS 2.1 The following documents of the issue in effect on da
2、te of invitation for bids or request for proposal, form a part of this speciffcation to the extent specified herein. Military MIL-A-2550 - Ammunition and Special Weapons, General Specification for SWKDARDS Federal Federal Test Method Stanamd No. 151 -Metals; Test Methods MILXrnY MIL-STD-105 MIL-STD-
3、log - Quality Assurance Terms and Definitions MIL-STD Amy Ordnance Materiel MIL-STD-u67 - Ammunition Daa Carda MIL-STD-1235 - Sapling Procedures and Tables for - Surface Roughness Values Preferred fr - Single and Multilevel Continuous Sapling Inspection by- AZtributes Procedures and Tables for Inspe
4、ction by Attributes FSC 1315 Metal Parts Assembly Assembly, Details, Packing and Marking 1r1-0522528 - Inspection Equipment List for Projectile, For Cartridge, goMM, TP-T, M353, Metal Parts Assembly PUBLICATIONS Munitions Command Frankford Arsenal Operating Instructions for Use of Detroit Testing Ma
5、chde for Band Seating Inspection (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer. ) 3. m-s 3.1 General.- Materials, parts
6、 and assemblies shall comply With the requirements of the applicable drawings, referenced specifications and the following: article sample by the contractor shall be as specified in the contract. - 3;2 First article sample.- Requirements for submission of first 3.3 Projectile body. 3.3.iMetal defect
7、s.- The projectile body shall not contain cracks. Imperfections on non-metallic inclusions which are greater than two inches in length are not permissible. 3.3.2 Band seat.- Prior to application of rotating band blank, the band seat shallbe clean and free of oil, grease, dirt, rust and other foreign
8、 matter. the band seat after hurling. Shot or sand blasting shall not be used in cleaning. 3.3.3 Protective coating.- Protective coating shall be in accordance with the applicable drawings and specifications referenced thereon. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted w
9、ithout license from IHS-,-,-3.4 Rotating band. 3.4.1 Blank.- The rotating band blank may be applied either hot or - cold; if applied hot, the blank shall not be heated above i600 degrees Fahrenheit preparatory to application, and scale formation shall be held to a minimum. 3.4.2 Mechanical propertie
10、s. - After seating and subsequent removal from the projectile body, the rotating band shall have the following minimm mechanical properties: Tensile strength - 32,000 pounds per square inch (psi) Elongation - i5 percent for one inch of gage length 3.4.3 Band seating. - The diametrical clearance betw
11、een the rotating band and band seat shall not exceed .O06 inch. 3.4.4 Protection.- The machined rotating band shall be carefully protected frombeing nicked, burred or otherwise damaged in subsequent handling and shipping. 3.5 Proving ground func ional tests.- There shall be no evidence of separation
12、 or breakup of components when the metal parts assembly is tested in accordance with 4.4.5.1 and 4.4.5.2. 3.6 Workmanship.- The requirements for workmanship are as specified on the applicable drawings, referenced specifications and the following: o 3.6.1 Metal defects, non-ferrous.- Soundness of mat
13、erial shall be as required by the applicable specification. 3.6.2 Threads.- Threads shall be full and undamaged for the entire minimum length or depth as required by the applicable component drawing. 3.6.3 Burr.- No part shall have a burr which might interfere with the assembly or function of the pr
14、ojectile, or which might be injurious to personnel during handling. 3.6.4 Foreign matter.- No part or assembly shall contain dirt, chips, grease, oil, rust, corrosion or other foreign matter. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided
15、 by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.3.2.1 Contd Defect Method of Inspection MINOR 201 202, 203. 204. 205. 206. 207. 208. 209. Diameter at rear, ou
16、tside Length from re& face to forward outside Length from rear face to rear outside Length of thread, max. Length, total Surf ace finish, improper Radii or chamfers, missing or incorrect Burr Foreign matter basic diameter basic diameter Gage Gage Gage Gage Gage Visual (see 6.1) Visuai (see 6.1) Visu
17、al Vi sual 4.3.2.2 Body, Drawing F10522530 covering a detail of Drawing FlOp2528. CRITICAL None defined MAJOR 101. 102. 103. Metal defective Diameter of rotating band seat Scoring or hurling missing from band seat. MINOR 201. 202. 203. Surface finish, improper 204. 205. Burr 206. Foreign matter Loca
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP605921966PROJECTILE90MMTPTM353METALPARTSASSEMBLYM353 90 MM 曳光 训练 TPT 金属 部件 组装 PDF

链接地址:http://www.mydoc123.com/p-446680.html