ARMY MIL-P-60521-1966 PROJECTILE HEP-T 106MM M346A1 METAL PARTS《M346A1式106 mm曳光高爆塑胶弹(HEP-T)用金属部件》.pdf
《ARMY MIL-P-60521-1966 PROJECTILE HEP-T 106MM M346A1 METAL PARTS《M346A1式106 mm曳光高爆塑胶弹(HEP-T)用金属部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60521-1966 PROJECTILE HEP-T 106MM M346A1 METAL PARTS《M346A1式106 mm曳光高爆塑胶弹(HEP-T)用金属部件》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、16 May 1966 SUPERSEDING FA-PD-MI-2644, Rev. O 30 April 1965 MILITARY SPECIFICATION PROJECTILE, HEP-T, 106MM, M346A1 METAL PARTS 1. SCOPE 1.1 This specification is the applicable detail specification for Projectile, HEP-T, 106MM, M346A1 Metal Parts. 2. APPLICABLE DOCUMENTS 2.1 The following documents
2、 of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extend specified herein. SPECIFICATION Military. MIL-A-2550 - Ammunition and Special Weapons, General MIL-P-10025 . - Packaging, Packing and Marking for Interplant Specification F
3、or Shipment of Inert Amunition Components, General Specification For 5. STANDARDS Federal Federal Test Method Standard No. 151 - Metals; Test Method Mi li tary MIL-STD-105 MIL-STD-109 MIL-STD-129 MIL-STD-639 - Surface Roughness Values Preferred for MIL-STD-1167 - Ammunition Data Cards MIL-STD-1235 -
4、 Sampling Procedures and Tabies for Inspection by - Quality Assurance Terms and Definitions - Marking for Shipment and Storage Attributes Army Ordnance Materiel - Single and Blultilevel Continuous Sampling Procedures and Tables for Inspection by Attributes THIS CUMENT CONTAINS I.pI PAGES. Provided b
5、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-6052L 13 97977Ob 0338893 b W I MIL-P-6052 1 (Mu) 2.1 (Contd) DRAWINGS Munitions Command a5 9 6 145 F7548604 IEL-8596145 - Projectile, HEP-T, lOGMM, M346A1, Metal Parts - Pallet, for Fixed and Semifixed Proj
6、ectile Assembly - Inspection Equipment List for Projectile, HEP-T, 106MM, M346A1, Metal Parts (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the
7、 contracting officer.) 3. REQUIREMENTS 3.1 General.- Materials, parts and assemblies shall comply with the require- ments specified on the applicable drawings s referenced specifications s and the following : 3.2 First article sample.- Requirements for the submission of first article sample by the c
8、ontractor shall be as specified in the contract. shall be uniform throughout each lot of components, and shall be conducted as to produce in any component the minimum mechanical properties specified. of metal involving plastic flow is permitted without subsequent stress relief, 3.3 Heat treatment or
9、 stress relief.- Heat treatment or stress relief applied No forming 3.4 Mechanical Properties.- The mechanical properties shall conform to the requirements as stated in the applicable specification and on the applicable component drawing . 3.5 Rotating band. 3.5.1 Band Seat.- Prior to application of
10、 the welded overlay rotating band, the band seat shall be clean and free of oil, grease, dirt, rust, and other foreign matter . 3.5.2 Rotatinp band application.- Rotating band shall be overlay welded in accordance with the applicable drawing and specification. 3.6 Protective coatings.- Protective co
11、ating shall be in accordance with the applicable drawing and specifications referenced thereon. 3.7 Functional. 3.7.1 Metal parts security.- Testing for metal parts security under all service conditions of pressure and temperature shall be mandatory. be no breakup of the rotating band in flight, nor
12、 shall there be evidence of failure of components or excessive deformation due to firing stresses, There shall 2 t Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bO52L 13 97799Ob 0338874 8 = 3.7.2 Veloclty-ccuracy,- Testing for velocity-accura
13、cy shall be for information only. 3.8 Workmanship.- The requirements for workmanship are as shown on the applicable drawings, referenced specifications and the following: 3.8.1 Metal defects, steel.- All components shall be free from cracks, splits, seams, cold shuts, inclusions, porosity and any ai
14、milar defect. 3.8.2 Metal defects, nonferrous.- Soundness of material shall be as required by the applicable specifications. with the applicable drawings. 3.8.3 Surface finish.- Surface finish of all components shall be in accordance 3.8.4 Threads.- Threads shall be full and undamaged for the entire
15、 minimum length or depth a8 specified on the applicable component drawing, and shall be in accordance with the provisions of MIL-A-2550, 3.8.5 Burr.- No component shall have a burr which might interfere with the assembly or function of the projectile or which might be injurious to personnel handling
16、 the item. 3.8.6 Foreign matter.- All parts and assemblies shall be free of chips, dirt, grease, oil, rust, corrosion or other foreign matter. 4, QUALITY ASSURANCE PROVISIONS 4,l Responsibilitv for inspection.- Unless otherwise specified in the contract or purchase order, the supplier is responsible
17、 for the performnce of all inspection requirements specified herein. Except as otherwise specified, the supplier my utilize his own facilities or any comercial laboratory acceptable to the Government. The Government reoerves the right to perform any of the inspections set forth in the specification
18、where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements, 4.1.1 guality assurance tem and definitions,- Reference shall be made to MIL-STD-109 to define quality assurance terms used. 4.1.2 Inspection.- Inspection shall be in accordance with MIL-A
19、-2550, except as specified herein. 4.2 First article sample. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60521 13 W 7979706 0338895 T W - MIL-P- 6052 1 (M) 4.2.1 Initial production sample.- At the beginning of regular production, a sample
20、 shall be submitted in accordance with contract requirements and shall consist of twenty-nine assemblies as follows: 22 Metal parts assemblies complete (painted) 2 Metal parts assemblies complete (unpainted) 5 Sets of component parts, unassembled Twenty of the above metal parts assemblies (painted)
21、shall be forwarded to a designated Proving Ground for ballistic testing. using the same materials, equipment, processes and procedures as will be used in regular production. be the same as used for regular production and shall be obtained from the same source of supply . The sample shall be manufact
22、ured All parts and materials, including packaging and packing shall 4.2.1.1 Examination and test.- After inspection and provisional acceptance at source, the sample shall be inspected for all requirements of the drawings and specifications at a Government laboratory or such other facility specified
23、in the contract . 4.2.1.2 Initial production sample failure.- Failure of the sample to comply with requirements of the drawings and specifications shall result in sample disapproval . 4.3 Inspection Provisions. 4.3.1.1 Submission of product.- The contractor shall submit the product in accoFdance wit
24、h MIL-STD-105 or MIL-STD-1235, as applicable. 4.3.1.2 Heat treated or stress relief lots,- Heat treated or stress relieved lots shall contain bodies from not more than one heat of steel that has been heat treated or stress relieved in the same furnace, at the same temperature and for the same length
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP605211966PROJECTILEHEPT106MMM346A1METALPARTSM346A1 106 MM 曳光 塑胶 HEPT 金属 部件 PDF

链接地址:http://www.mydoc123.com/p-446675.html