ARMY MIL-P-60454-1967 PRIMER PERCUSSION MARK 2A4 METAL PARTS FOR《撞击引物用MK 2A4金属部件》.pdf
《ARMY MIL-P-60454-1967 PRIMER PERCUSSION MARK 2A4 METAL PARTS FOR《撞击引物用MK 2A4金属部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60454-1967 PRIMER PERCUSSION MARK 2A4 METAL PARTS FOR《撞击引物用MK 2A4金属部件》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-by Attributes. DRAWINGS ARMY 8840358 - Metal Parts Assembly PUBLICATIONS ARMY ET08840358 - Equipment Tabulation (Copies of specifications, Sta dards, drawings and publ.cations required by contractors in
2、 connection with speclfc procurement functions should be obtained from the procuring activity or as directed by the contracting officer) 3. REQUIREMENTS 3;1 Material.-Materials shall be in accordance with 3.2 -Parts.-The arts shall comply with all requirements applicable drawngs and specifications.
3、specified on Drawing P dwg.) 8840358 as applicable, and with all requirements specified in applicable specifications. no cracks when subjected to the mercurous nitrate test specified in 4.4.3. in a thorough, workmanlike manner. They shall be clean and free of burrs, sharp edges, unblended radii, cra
4、cks, surface defects, chips, dirt, grease, rust and other foreign matter. cleaping method used shall not be InJurious to any part nor shall the parts be contaminated by the cleaning agent. 3.3 Mercurous Nitrate test,-The primer bodies shall exhibit 3.4 Workmanship.-All parts shall be fabricated and
5、finished The 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-to the seriousness of the classification assigned. In no instance will a characteristic c
6、lassified “critical“ be accepted solely on the basis of the contractors records. First article inspection 4.2.1 Submission.-The contractor shall submit a first article sample as designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first article sample
7、shall consist of twenty-five assemblies and twenty-five each of every component which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which.wil1 be used In fulfilling the contract. All part
8、s and materials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production, Prior to submission, the contractor shall inspect the sample to the degree necessary t8-: assure that it conforms to the requirements of the contract and submit a
9、 record of this inspection with the sample, including statements of findings for materials, processes and tests. A sample containing known defects will not be submitted unless specifically authorized, by the Contracting Officer. A first article.sample, or portion thereof, as directed by the contract
10、ing officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs in manufacturing process, material used, drawing or specification such as to significantly affect product uniformity as determined by the Government. 4.2.2 Inspe
11、ctions to be performed.-Assemblies and components will be subjected by the Government to any or all the examinations or tests specified in 4,3,2 and 4.3.3 of this specification and any or all requirements of ths applicable drawings. 4 4.1.2 Government verification.-Using the contractors Witten quali
12、ty assurance procedure, this detail specification, the applicable drawings and other contractual documents as a gide, the Government inspector shall verify at unscheduled intervals all quality assurance operations performed by the contractor. Verification will be performed to the extent necessary to
13、 assure compliance with the contractual requirements. inspection of individual characteristics will be directly related Severity of Government Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.2.3 Rejection.-If any assembly or component fails to comp
14、ly with any of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate its inspection upon any faflure of an assembly or component to comply with any of the stated requirements. 4.3 Inspection provisions 4.2.1 Lot formation.-The term “l
15、ot“ as used throughout this specification refers to an inspection lot, which is defined as an essentially homogeneous collection of units of product from which conformance of the lot with applicable requirements. The sample selected shall represent only that quantity of units from which the sample w
16、as drawn and shall not be construed to represent any p-ior or subsequent quantities presented for inspection. Homogeneity shall be considered to exist provided the lot has been produced by one manufacturer, in one unchanged process, in accordance with the same drawing, same drawing revision, same sp
17、ecification and same specification revision. Changes to the process, specification, or drawing not affecting safety, performance, interchangeability, or storage, as determined by the Government, shall not be deemed to alter the homogeneity of the lot. Inspection lots shall comply with MIL-STD-105 an
18、d shall be numbered in accordance with MIL-STD- 1168. Unless otherwlse approved by the contracting officer, the inspection lot size of end items deliverable under the contract shall be not less than the smallest weekly estimate of quantities contractually scheduled for production during the contract
19、 period nor more than the largest monthly quantity contractually scheduled for delivery during the contract period. Inspection lots for components or subassemblies, other.than the Items of delivery, shall be homogeneous and of a size mutually convenient to both the contractor and the Government insp
20、ector. 4.3.2 Examination.-Inspection for Critical defects (and Major defects, when so specified,) shall be 100 percent. Sampling plans and procedures for Major and Minor defects shall be in accordance with MIL-STD-105 except that continuous sampling plans in accordance with MIL-STD-1235 may be used
21、If approved by the procuring activity. Also, at the option of the procuring activity, Aals and sampling plans may be applied to individual characteristics listed using an AQL of 0.65 percent for each Minor defect and an AQL of 0.40 percent for each Major defect, except where 100 percent inspection i
22、s specified. Equipment necessary for the performance of the inspections listed shall be in accordance with 4.2.4. a representative sample is drawn and inspected to determine O 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60454 (MU) 8840358
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP604541967PRIMERPERCUSSIONMARK2A4METALPARTSFOR 撞击 引物 MK2A4 金属 部件 PDF

链接地址:http://www.mydoc123.com/p-446665.html