ARMY MIL-P-48450 A (1)-1979 PERISCOPE TANK M35E1《M35E1式坦克潜望镜》.pdf
《ARMY MIL-P-48450 A (1)-1979 PERISCOPE TANK M35E1《M35E1式坦克潜望镜》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48450 A (1)-1979 PERISCOPE TANK M35E1《M35E1式坦克潜望镜》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-48950A (1) 12 7777706 0320534 3 W MILITARY SPECIFICATION PERISCOPE, TANK: M35E1 MIL-P-48450A( AR) AMENDMENT 1 15 October 1979 This amendment forms a part of Military Specification MIL-P-48450A(MU) dated 15 March 1976. PAGE 3 Paragraph 3.4.3.1 - Delete and substitute: “3.4.3.1 Vibration “A“. Th
2、is requirement shall be met with the image intensifier tube and reticle projector lamp energized by the application of +24 + 6.0 VDC to Contact 11733497 (Reference Drawing 11733401). interface of the periscope and mount. Vibration shall be applied along each of three mutually perpendicular axes of t
3、he periscope. vibration shall be shall be sinusoidal as follows: The vibration input to the periscope shall be at the The 10%. linearly from .5 G to 1.5 GIs - + 10%. acceleration of 1.5 GIs - + 10%. acceleration of 1.5 GIs - + 10%. linearly from 1.5 GIs to .5 G - + 10%. b. During a frequency sweep o
4、f 5 to 9 Hz, increase c. During a frequency sweep of 9 to 500 Hz, mainta d. During a frequency sweep of 500 to 9 Hz, mainta During a frequency sweep of 9 to 5 Hz, decrease At 5 Hz, the acceleration shall be .5 G - + 10%. e. f. a. A frequency of 5 Hertz(Hz), the acceleration shall be .5 G - + acceler
5、ation n constant n constant acceleration The frequency of applied vibration shall be swept logarithmically in 15 minute + 1 minute sweep cycles for a total of two hours per axis . There shalT be no failure or flicker of light emission from the image intensifier tube nor he reticle projector lamp dur
6、ing vibration and the periscope shall show no evidence of physical failure subsequent to vibration. Following the vibration test the persicope shall m*eet the requirements of 3.6.3.2, 3.6.4.1, 3.6.9, 3.6.2, 3.6.3.1, 3.6.3.1.1, 3:6.3,1.2; 3.6.5, 3.6.6, 3.6.6.1, 3.6.7, 3.6.8, 3.2, 3.1, 3.5 and then ea
7、ch module (see 3.1) shall meet their own respective post-vibration test requirements .I FSC 1240 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-4V50A (1) 12 W 7977706 0320535 O 9 MIL - P - 4E45D3 ( AR ) AMENDMENT 1 Paragraph 3.4.3.2 - Delete a
8、nd substitute: Vibration llBl - This requirement shall be met with the image intensifier tube and reticle projector lamp energized by the application of +24 + 6.0 VDC to Contact 11733497 (Reference Drawing 11733401). The vibration input to the periscope shall be at the interface of the periscope and
9、 mount. Vibration shall be applied along each of three mutually perpendicular axes of the periscope. vibration shall be sinusoidal as follows: “3.4.3.2 The a. b. At a frequency of 5 Hertz(Hz), the acceleration shall be 1.0 G During a frequency sweep of 5 to 500 Hz, maintain constant - + 10%. acceler
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP48450A11979PERISCOPETANKM35E1M35E1 坦克 潜望镜 PDF

链接地址:http://www.mydoc123.com/p-446391.html