ARMY MIL-P-48349-1974 PROPELLANT M3OA1 FOR USE IN 155MM PROPELLING CHARGES《155毫米发射装药系统用M3OA1发射药》.pdf
《ARMY MIL-P-48349-1974 PROPELLANT M3OA1 FOR USE IN 155MM PROPELLING CHARGES《155毫米发射装药系统用M3OA1发射药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48349-1974 PROPELLANT M3OA1 FOR USE IN 155MM PROPELLING CHARGES《155毫米发射装药系统用M3OA1发射药》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY MIL-P-Q8349(PA) 26 August 1974 SPECIFICATION PROPELLANT M30A1 FOR USE IN 155I“i PROPELLING CHARGES This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers M30A1 Propellant for use in Cartridges employed with
2、 the xMi98 Cannon prior to DT/OT II Testing. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids, or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 - Ammunition and Speci
3、al Weapons; General Specification for STANDARDS MILITARY MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-652 - Propellants Solid for Cannons Require- MIL-STD-1168- Lot Numbering of Ammunition MIL-STD-1171- Acceptance and Description Sheets for MIL-STD-414 - Sampling Procedures and Tabl
4、es for ments and Packing Propellants and Explosives Inspection by Variables for Percent Defective FSC: i376 ,/- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48349 13 W 9799906 0319134 T = MIL-P-48349 (PA) 2.2 Other publications. The followin
5、g documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invitation for bids shall apply. CODE OF FEDERAL REGULATIONS Title 49, Department of Transportation: Parts 0-199 AMC PAMPHLET 706-114 Experimental Statistics, Sect
6、ion 5, Tables The Code of Federal Regulations is available from the Superintendent of Documents, Government Printing Office, Washington,D.C., 20402, Orders for the above publication should cite: 49 CFR 0-199 (latest revision). 3. REQUIREMENTS 3.1 Materials. The propellant shall be M3OAl, Type II con
7、forming to the requirements of MIL-STD-652, except para 4.2.3.3.1.2. 3.2 Proving Ground. The propellant, when fired in the mi98 Cannon and with the weight of projectile (96 pounds (lbs) for which it was manufactured, shall comply with the following requirements when tested as specified in 4.3. 3.2.1
8、 Assessment. At 70 degrees Fahrenheit (OF) and standard weapon conditions, the propellant shall be capable of charge assessment to a velocity of 2710 feet per second (fps) without an associated expected pressure greater than 47500 pounds per square inch (psi). for the lot at 7O0F shall not exceed 6.
9、5 fps. at recommended charge weight shall not produce a chamber pressure greater than 58,500 psi at any operating temperature (-50F to S145OF) when fired in a standard weapon. 3.2.2 Uniformity of velocity. The standard deviation in velocity 3.2.3 Permissible Individual Maximum Pressure. The propella
10、nt 2 .+ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P- 483 49 (PA ) f. 3.3 Straightness. Twenty seven pounds of stick propellant, cut to the length specified in the contract, shall fit into a 6.1 inch inside diameter cylinder. In addition, ea
11、ch of these individual sticks of propellant shall not bow more than .25 inch. 3.4 Workmanship. The best commercial practices shall be used in the formulation of propellant furnished under this specification, and all other applicable documents. The propellant and its standarc ingredients shall be pro
12、tected from the action of direct sunlight and acid fumes. No reground propellant or nitrocellulose shall be used in the manufacture of propellant procured under this specification unless otherwise specified. 3.5 Physical Properties. The following physical properties shall be determined as specified
13、in 4.3.6 and reported for information (see 6.3): a. Density b. c. Deformation at maximum load. Compressive strength at 77 t 4OF 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection, Unless otherwise specified in the contract or purchase order, the supplier is responsible for the perform
14、ance of all inspection requirements as specified herein, Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government res
15、erves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109, in order to define terms used herein. The provisions of MIL-A-2550
16、shall apply, 4.1.1 Submission of product. At the time the completed lot of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product be
17、ing submitted: a. A statement that the lot complies wibh all of th.e quality assurance provisions specified within this specification. 3 o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-qB347 L3 9997906 0317136 3 . MIL-P-48349 (PA) b. Number o
18、f batches of product inspected (shall be made available upon request by the contracting officer). c. Results obtained, by defect code, for all inspections peyformed (shall be made available upon request by the contracting officer ) d. Drawing, specification number, and date, together with an identif
19、ication and date of changes. e. Certificates of conformance on all material purchased by the contractor when such material is controlled by Government or commercial specifications referenced in any of the contracting documents (shall be made available upon request by the contracting officer). f. Num
20、ber of items in the lot. g. Date submitted. h. Eight copies of propellant description sheet SMU Form 1047 containing the applicable data (see 6.6) 4.1.2 The certificate shall be signed by a responsible agent The initial certificate submitted of the certifying organization. shall be substantiated by
21、evidence of the agents authority to bind his principal. will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. Substantiation of the agents authority 4.2 Inspection provisions 4.2.1 Lot fo
22、rmation. The term “lot“ as used throughout this specification, refers to an inspection lot, which is defined as an essentially homogeneous quantity of propellant from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for inspection. A lot
23、 shall consist of one or more sub-lots or one or more batches of M30A1 propellant produced by one manufacturer, in accordance with the same specification, and same specification revision, under one continuous set of operating conditions, Each lot shall consist of that quantity of M30A1 propellant wh
24、ich has been subjected tothe same unit chemical or physical process intended to make the final product homogeneous. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-483Y9 33 999990b 0339337 5 MIL-P-48349 (PA) 4.2.2 Testing 4.2.2.1 Materials (
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP483491974PROPELLANTM3OA1FORUSEIN155MMPROPELLINGCHARGES155 毫米 发射 系统 M3OA1 PDF

链接地址:http://www.mydoc123.com/p-446381.html