ARMY MIL-D-60095-1964 DETONATOR ELECTRIC XM65 LOADING ASSEMBLING& PACKING《XM65型电能激发雷管的装载 组装及包装》.pdf
《ARMY MIL-D-60095-1964 DETONATOR ELECTRIC XM65 LOADING ASSEMBLING& PACKING《XM65型电能激发雷管的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-60095-1964 DETONATOR ELECTRIC XM65 LOADING ASSEMBLING& PACKING《XM65型电能激发雷管的装载 组装及包装》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-D-60075 23 W 7797906 0335508 6 = r- - - /- MIL-D- 60095 (MU) 30 October 1964 MILITARY SPECIFICATION DhTONATOR, ELECTFtIC, XM65 LOAPINO, ASSEMBLING AND PACKING 1. SCOPE 1.1 This specification contains requirements not normally required by Lhe drawings and p-ovides for quality asurance provisions
2、for the loading, assembling and packing for one type of fnitiating device designated 8s Detonator, Electric, xbI65, 2. APPLICABLE DO-NTS. 2.1 The following documents of the Issue in effect on date of invitation for bids or request for proposals, form a part of this epeciflcatlon to the extent specif
3、ied herein. SPECIFICATIONS MILITARY MIL-P-116 - Preservatfon, Methods of. MIL-A-2550 - Ammunition md Special Weapons; General Specification for. MIL-P-14077 -.Polytgtafluoroethylene (Teflon), Molding aid Extruding Material. ML-1-45208 - Inspection Requfrements, General Specification for, MIL-1-45607
4、 - fnspection Equipment, Supply and BYalnteneutce of. STANDARDS MILITARY ML-STD-105 - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105). I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-I)-60095 (Mu) ML-STD-109 MiL-STD-
5、1235 - Single and Multilevel Continuous - Quality AssuranCe Terms and Definitions. Samplng Procedures and Tables for Inspection by Attributes, DRAWINGS ORDNANCE CORPS 8798134 - Ammunition Container, Hetal Por Detonators 8798135 - Box, Packlng, Ammuntton for Detonators 8798136 - Box, Set-up, Packing,
6、 Amunition for Detonators 9204230 - Detonator, Electric XM65 Assembly. Electric. Electric. Electric. PUBLICATIONS ORDNANCE CORPS IEL-9204230 - Index of Inspection Equipment Lists. (Copes of speclficationa, standards, drawings and publications required by contractors in connection with specific procu
7、rement functions should be obtained from the procuring activity or a8 directed by the contracting officer). 3. REQUIREMENTS 5.1 Material.-Matrials shall be in accordance wth applicable 3.2 Detonator.-The detonator shall comply with all requments dpawings and specfffcatlons. specified on ion by the G
8、overnment;, Any critical defect encountered, unless annotated by an asterrk (*) to the rlght of the chakacterlstic cade mmber (aste 6.2)s will be repopted wfttifai 48 hours. clpiticai defects amstated by an asterisk wili be fwnishad. The agencies tu whm tke repmts will be furrdahsd ape idcrn+iffed i
9、n paragrzf G,6, The reporta ahall. cotstal? as a inZnurn, Lhe following information; Reierence shall be made to The Contractrss quality assurance eystxm.-Ths contractor 4.3.1 A moz=arisy rhipmt c0vePir.g those a. ConPractor and con%at mmke b. C. Characteslwtlo code tluarher. . Lot or Berial number.
10、e. Number of defectives fouraol of the contractor OP the mope of the coritrai-t, the report. skiell. ontafn the cntrczchrce recommendation to the Government;. Number and revidioas ing for acceptance by the Goverment ehal be s%opped. Subsequen% testing for waterproofness, duds, and output. shall not
11、be conducted. The standmd deviation shall be calculated using ths fokmrrla lin 6.6 OP its equivalent. 4.%.9,4.2 Waterproofness (see 3.5) - Major defect Code No. 03015, outgut (see 3.6.2) - Major defect - Code No. 03016 and duds (see 3.6.3) - Ma,jur defect - Code No. 03014.4f the lot has not been PJe
12、ctssl in 4.%.3.4.0b9 a portion of SO detonators shall be tested a8 epeclficad in 4.3.5, using test equipment specified In 4.2.4. The lot shall be rejected if two OF more detonators fail to produce a perfoation in the disc of the required size. fal to fim shall he replaced with detonators from the Pe
13、maning goktioa of bhe ox+gfnal sample. encountered dwng the time and output tests combined, the 10% shall be kejected and fwther teaking for acceptance by the Government shall be stopped. If a total of three dude has not been encountered buk one detonator fafla 60 create a perforation in the lead di
14、sc of the required sizes the balance of the original sample ahall be tested ais $peeiffed in 4.3.4. The lot shall be rejected and testing for Goverment acceptance shall be stopped If and when one or mom detonator fail8 to weate a perforation in ehe disc of the pequlped size OF when a tP;al of thme d
15、uds is encountered in all the combned testing. Detonators that If a total of three duds has been 4.2.3.4.3 Thab (me 3.6.3) - Major defect - Code No. 03014.-ff all of the fipst 50 detonatore teated In 4.2.3.4.2 unction satis- facto?ify ia the outgut phase, and the lot has not been rejected for duds;
16、the xoemanng gok%ioa of the original sample shall be subjected to the teat for uda specified in 4.3.6. The lot shall be rejected when and if a total of three dud6 ia encountered in all of %he omb%ned tesixhg and testing for Government acceptance erhall be stopped. If two du. Lists shall be submitted
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD600951964DETONATORELECTRICXM65LOADINGASSEMBLINGPACKINGXM65 电能 激发 雷管 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442532.html