ARMY MIL-C-60932-1968 CARTRIDGE 105MM HE ROCKET ASSISTED XM548 LOADING ASSEMBLING AND PACKING《XM548型105MM火箭辅助炮弹的装载 组装和包装》.pdf
《ARMY MIL-C-60932-1968 CARTRIDGE 105MM HE ROCKET ASSISTED XM548 LOADING ASSEMBLING AND PACKING《XM548型105MM火箭辅助炮弹的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-60932-1968 CARTRIDGE 105MM HE ROCKET ASSISTED XM548 LOADING ASSEMBLING AND PACKING《XM548型105MM火箭辅助炮弹的装载 组装和包装》.pdf(31页珍藏版)》请在麦多课文档分享上搜索。
1、and M MIL-C-60932 (MU) 15 January 1968 MILITARY SPECIFICATION CARTRIDGE, 105MM, HE, ROCKET ASSISTED, XM548 LOADING, ASSEMBLING AND PACKING 1. SCOPE 1.1 This specification covers the loading, assembling acking for one type of rocket assisted artillery cartridge designated as Cartridge, 105MM, HE, Roc
2、ket Assisted, XM548 (including loading of the warhead and the motor body). 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids, or request for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-
3、A-2550 - Ammunition and Special Weapons, General SDecification for MIL-1-45607 - Ihspection Equipment, Supply and Maintenance of PURCHASE DESCRIPTIONS PA-PD-2791 - Primer, Percussion, XM108, Loading, Assembling and Packing STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-453 - Inspection, Radiogra
4、phic - Sampling Procedures and Tables for - Quality Assurance Terms and Definitions Inspection by Attributes (ABC-STD-105) FSC: 1315 - FI,; Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-60932 13 W 7777706 0342262 2 W MIL-C-60932 (MU) MIL-STD-
5、1168 - Lot Numbering of Ammunition MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes DRAWINGS ARMY 9209385 - Container, Ammunition, Plastlc, M-, for 9209387 - Crate, Wood, Open, Wirebound for 105MM 9212376 - Cartridge, Semi-Fixed, 105MM, HE,
6、Rocket 9213636 - Container, Ammunition, Fiber, M-, for 9213637 - Box, Packing, Ammunition, for Cartridge, Cartridge, 105MM, HE, RAP, XM548 (Howitzer) Ammunition, in Plastic Container XM578 Assisted, XM548 for Cannon M2A2, MlO3 or 1.1137 Cartridge, 105MM, HE, RAP, XM548 105MM, HE, RAP, XM548 PUBLICAT
7、IONS ARMY ET-9212376 - Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Material.
8、-Material and parts shall be in accordance 3.1.1 with applicable drawings and specifications. Clean explosive scrap.-Clean explosive scrap produced in regular operations may be remelted and reused provided that it complies with the requirements for the grade of high explosive specified, except for f
9、orm. lation and suction apparatus (other than from drilling operations specifically controlled to prevent contamination of explosive) shall not be used (see 6.6). all requirements specified on Drawing (dwg.) 9212376 and with requirements specified in applicable specifications. Scrap from floor sweep
10、ings, venti- 3.2 Loaded Cartridge.-The loaded cartridge shall comply with 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-60732 13 7777706 03422b3 4 MIL-C-60932 (MU) 3.3 Cavitation in high explosive charge 3.3.1 Cracks and projected cavities.
11、-Cavities and cracks within the explosive charge shall not exceed the requirements specified in Table I when determined in accordance with 4.3.1. Cavities having a maximum projected length of 1/32 inch or less shall be disregarded. TABLE I Segments (see Figure 1) A* B C D Sum of projected areas of t
12、he cavities, excluding pipes, cracks and annular Projected length of any cavity excluding pipes cracks and annular rings (in.) l/U 1/2 1/2 314 Piping cavities, max., projected area (sq. in.) O 1/4 1/2 O ringskquare inch (sq. in.) 1/64* 1/4 1/2 1/2 Piping cavities, max., projected width (in.) O 1/4 1
13、/4 O Cracks, max., projected width (in.) 1/32 1/32 1/32 - Annular rings, max., projected width (in.) O O 1/4 O *Pertains to both composition B and filler E * If the length of the largest cavity is 1/16 inch or less, the maximum total projected area may be 1/20 square inch. 3 Provided by IHSNot for R
14、esaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-60732 13 7777706 0342264 6 = - - MIL-C-60932 (MU) 3.3.2 Porous areas.-Porous areas shall be treated as cavities and shall be subjected to the restriction placed upon cavities, except that 80 percent of the projected leng
15、th and 80 percent of the projected area shall be considered for .acceptance purposes. 3.3.3 Cracked charges,-Not more than four transverse cracks shall be permitted in any charge and not more than one transverse crack shall be permitted in Segment A. Surface cavitation.-Cavities in Segment D of Figu
16、re 1 formed due to chipped or broken explosive from the sidewalls of the fuze well shall not extend in aggregate around more than 1/4 of the circumference. The max. dimension of any visible cavity in the base of the fuze well shall not exceed 1/4 1nch.in any direction and the total area of all such
17、cavities shall not exceed 80 percent of the area of the fuze well base. -No individual point of explsive shall extend above the flat surface on which the liner would rest. (Cavities having a maximum dimension of 1/32 inch or less shall be disregarded in this computation). Disregard any cavitation in
18、 fuze well above Segment D. 3.3.5 Base separation.-There shall be no separation greater than 1/32 of an inch between the shell base and the filler E and likewise between the filler E and the explosive charge. 3.3.4 3.4 Loading of high explosive 3.4.1 Mating surfaces.-The mating surfaces of threads s
19、hall be free of caked explosive and all threads shall be free of foreign material. acetone or methylene chloride shall be used. Care shall be taken to prevent the chemical cleaner from coming into contact with the charge and becoming entrapped in the warhead, present in the warhead before loading or
20、 be added to the shell during pouring or cooling. Coating.-Warhead having the interior wall imperfectly coated shall not be loaded. The interior surface of the warhead shall be dry when the high explosive is poured into the warhead. withstand a minimum disassembly torque of 200 foot pounds when test
21、ed as specified In 4.3.4. If a chemical cleaner is required, 3.4.2 Solid explosives.-Solid explosives shall not be 3.4.3 . . 3.5 Warhead . disassembly torque.-The Warhead shall 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.6 Primer.-The primer
22、shall have the required number and location of flash holed as specified on the appropriate primer drawing. 3.7 Waterproofness (applicable to plastic containers).- The plastic container shall be waterproof as evidenced by abs of air leakage when tested as specified in 4.3*2* n 3.8 Proving ground test
23、.-The cartridge shall comply with the following requirements when tested as specified in 4.3.3, 3.8.1 Functioning 3.8.1,l Failure to fire.-The cartridge shall not fail to fire 3.8.1.2 Rocket Motor Functioning,-When the rocket selector cap is removed, the rocket shall fire in flight. When the rocket
24、selector cap is leftin place (set to remain inert) the rocket shall not fire. 3.8.1.3 Impact functioning.-The cartridge shall function 3.8,1.4 Horizontal range 3.8.1.4.1 The mean corrected horizontal range shall be high order on impact. within 80 meters of that predicted by the applicable range tabl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC609321968CARTRIDGE105MMHEROCKETASSISTEDXM548LOADINGASSEMBLINGANDPACKINGXM548 105 MM 火箭 辅助 炮弹

链接地址:http://www.mydoc123.com/p-441960.html