ANSI ASME B30.3 INTERPRETATIONS-1996 Interpretations to B30.3-1996 Hammerhead Tower Cranes.pdf
《ANSI ASME B30.3 INTERPRETATIONS-1996 Interpretations to B30.3-1996 Hammerhead Tower Cranes.pdf》由会员分享,可在线阅读,更多相关《ANSI ASME B30.3 INTERPRETATIONS-1996 Interpretations to B30.3-1996 Hammerhead Tower Cranes.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、ASME 630.3 Interpretations Replies to Technical Inquiries December 1992 - October 1996 FOREWORD This publication includes all of the written replies issued between the indicated dates by the Secretary, speaking for the ASME B30 Committee, Safety Standard for Cableways, Cranes, Demcks, Hoists, Hooks,
2、 Jacks, and Slings, to inquiries concerning interpretations of technical aspects of ASME B30.3, Construction Tower Cranes. These replies are taken verbatim from the original letters, except for a few typographical corrections and some minor editorial corrections made for the purpose of improved clar
3、ity. In some few instances, a review of the interpretations revealed a need for corrections of a technical nature: in these cases a corrected interpretation immediately follows the original reply. These interpretations were prepared in accordance with the accredited ASME procedures. ASME procedures
4、provide for reconsideration of these interpretations when or if additional information is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by this interpretation may appeal to the cognizant ASME Committee or Subcommittee. ASME does not approve,” “cert
5、ify,” “rate,” or “endorse” any item, construction, proprietary device, or activity. “ 5 3-3, 3-4 830.3 interpretations Interpretation: 3-3 Subject: Reconsideration of Interpretation 3-2, Lightning Protection Date Issued: June 14, 1996 Question: Which persons does the Interpretation 3-2 intend the li
6、ghtning protection to protect? Reply: Section 3-1.16(h) states that “Lightning protection shall be provided.” and Interpretation 3-2 states in part that the lightning protection shall be “capable of protecting persons from injury.” To clarify the wording of the interpretation, the volume does not in
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASMEB303INTERPRETATIONS1996INTERPRETATIONSTOB3031996HAMMERHEADTOWERCRANESPDF

链接地址:http://www.mydoc123.com/p-431865.html