AIAA R-092-1-2003 Wind Tunnel Testing Part 1 Management Volume《风洞试验.第1部分 管理卷》.pdf
《AIAA R-092-1-2003 Wind Tunnel Testing Part 1 Management Volume《风洞试验.第1部分 管理卷》.pdf》由会员分享,可在线阅读,更多相关《AIAA R-092-1-2003 Wind Tunnel Testing Part 1 Management Volume《风洞试验.第1部分 管理卷》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、Recommended PracticeAIAAR-092-1-2003Wind Tunnel Testing Part 1:Management VolumeAIAA standards are copyrighted by the American Institute of Aeronautics andAstronautics (AIAA), 1801 Alexander Bell Drive, Reston, VA 20191-4344 USA. All rightsreserved.AIAA grants you a license as follows: The right to
2、download an electronic file of this AIAAstandard for temporary storage on one computer for purposes of viewing, and/or printingone copy of the AIAA standard for individual use. Neither the electronic file nor the hardcopy print may be reproduced in any way. In addition, the electronic file may not b
3、edistributed elsewhere over computer networks or otherwise. The hard copy print may onlybe distributed to other employees for their internal use within your organization.AIAAR-092-1-2003Recommended PracticeWind Tunnel Testing Part 1: ManagementVolumeSponsorAmerican Institute of Aeronautics and Astro
4、nauticsAbstractThis recommended practice document is the first of a two-part series intended to provide test projectmanagement and practitioners with best practices that maximize the data value of wind tunnel testprojects. Part I help managers understand the impact of decision making before and duri
5、ng thedevelopment of a test project and provides key activities to help improve the timeliness and cost-effectiveness of future wind tunnel test projects. Part II provides those responsible for test execution withbest practices to employ when preparing for and implementing tests.AIAA R-092-1-2003iiL
6、ibrary of Congress Cataloging-in-Publication DataRecommended practice : wind tunnel testing.p. cm.pt. 1. Management volume - pt. 2. Practitioners volume.Includes bibliographical references and index.ISBN 1-56347-650-9 (v. 1) - ISBN 1-56347-651-7 (Electronic) - ISBN1-56347-652-5 (v. 2) - ISBN 1-56347
7、-653-3 (Electronic)1. Wind tunnels. 2. Aerodynamics-Research-Standards. 3. Windtunnel models-Testing-Standards. I. American Institute of Aeronauticsand Astronautics.TL567.W5R437 2003629.13452-dc222003019165Published byAmerican Institute of Aeronautics and Astronautics1801 Alexander Bell Drive, Resto
8、n VA 20191Copyright 2003 American Institute of Aeronautics andAstronauticsAll rights reserved.No part of this publication may be reproduced in any form, in electronic retrieval system orotherwise, without prior written permission of the publisher.Printed in the United States of America.AIAA R-092-1-
9、2003iiiContentsForeword .v1 Introduction .11.1 History and Background .12 Managing Todays Wind Tunnel Test Programs22.1 Planning Issues in Wind Tunnel Test Programs22.1.1 Test Requirements 22.1.1.1 Integrated Test Programs .22.1.1.2 Test Article Size and Fidelity22.1.1.3 Data and Instrumentation Req
10、uirements 32.1.1.4 Facility Selection.32.1.2 Planning and Scheduling.42.1.3 Special Issues52.1.3.1 Security 52.1.3.2 Contracting and Procurement 52.1.4 Advanced Tools and Technologies52.2 Keys to Managing a Successful Test Program.52.2.1 Program Test Plan.62.2.1.1 Key #1: Establish Goals, Quality, a
11、nd Success Criteria 62.2.1.2 Key #2: Understand Program Considerations62.2.1.3 Key #3: Involve Test Community Early.72.2.2 Detailed Test Planning and Execution72.2.2.1 Key #4: Establish Test Teams72.2.2.2 Key #5: Develop and Execute Detailed Test Plans .92.2.3 Post-Test Activities.92.2.3.1 Key #6: P
12、roject Reviews/Lessons Learned/Feedback 92.2.3.2 Key #7: Documentation 103 Summary. 10Annex A Advanced Tools and Methods for Consideration in Test. 11A.1 Integrating Testing and Computational Fluid Dynamics (CFD) . 11A.2 Rapid Prototype Tools 11A.3 Effective Use of Computer-Aided Design (CAD). 11A.4
13、 Remote-Access Testing . 11A.5 Advanced Instrumentation 12A.6 Model Automation 12A.7 Test Simulation Tools. 13AIAA R-092-1-2003ivAnnex B Subcontracting Mechanisms . 14FiguresFigure 1 Key Activities and Their Alignment to Test Program Phases.6Figure 2 Illustration of a Test Team Structure during Prep
14、aration Activities.8Figure 3 Illustration of a Team Arrangement During Testing8AIAA R-092-1-2003vForewordThe American Institute of Aeronautics and Astronautics (AIAA) Ground Test Technical Committee (GTTC)began looking at best practices associated with test article development as a way to recommendi
15、mprovements in wind tunnel test efficiency, cost, and cycle time. It became apparent early on that trying toseparate test article development from overall wind tunnel test process was not a productive and usefulactivity. The highly integrated nature of the processes, organizations, and personnel inv
16、olved in windtunnel test programs requires that a broader viewpoint of the wind tunnel test process be evaluated inorder to develop successful techniques and methods. This two-volume effort, “Recommended Practicefor Successful Wind Tunnel Testing,” is the result of that evaluation.Part I was written
17、 to provide test program managers with clear insight into achieving technically focused,affordable, and low-risk test programs to support the development of aerodynamic vehicles andtechnologies. This recommended-practices document will help managers understand the impact ofdecision making before and
18、 during the development of a test program and will provide key activities tohelp improve quality, timeliness, and cost-effectiveness of wind tunnel test programs.Part II provides additional detail about successful methods for personnel who are directly involved indeveloping and executing test progra
19、ms.Neither volume is intended to be a totally comprehensive document on successful wind tunnel testing.Instead, they represent a compilation of best practices to provide a strong foundation for the successfuldevelopment of a test program or test effort. While these practices focus on wind tunnel tes
20、t processes,the information is applicable to many other ground test activities.The GTTC Test Processes Working Group consisted of a diverse group of industry and governmentexperts in the fields associated with wind tunnel testing. During the development of these documents,this group consisted of:Mr.
21、 Mark Melanson, Chairman (Lockheed Martin Aeronautics)Mr. Tom Aiken (NASA Ames Research Center)Mr. Allen Arrington (QSS Group Inc./NASA Glenn Research Center)Mr. Chris Athaide (Tri Models Inc.)Mr. Rene Barakett (Bombardier Aerospace)Mr. Mark Betzina (NASA Ames Research Center)Ms. Jean Bianco (NASA G
22、lenn Research Center)Mr. Jim Brunges Mr. Steve Craft (NASA Langley Research Center)Mr. Roger Crites (Boeing Company, St. Louis)Mr. Drew Hope (NASA Langley Research Center)Mr. Mark Kammeyer (Boeing Company, St. Louis)Mr. Ray Knowis Mr. Dan Marren (AEDC White Oak)Ms. Laura McGill (Raytheon Missiles)Mr
23、. Dave Minto (Holloman High-Speed Test Track)AIAA R-092-1-2003viMr. Michel Ouellette (Bombardier Aerospace)Mr. Barry Price (NASA Langley Research Center)Mr. Al Roberts (Tri Models Inc.)Mr. Matt Ruegers (Boeing Company, St. Louis)Mr. Lew Scherer (Northrop Grumman)Mr. Rob Sheehan (Northrop Grumman)Dr.
24、 Frank Steinle (Sverdrup/Jacobs Engr. at Arnold Engineering DevelopmentCenter)Mr. Bill Straka (Penn State University)Mr. Steven Westmore (Boeing Company, Seattle)Many others also contributed to this document during its development.AIAA Standards Procedures provide that all standards, recommended pra
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIAAR09212003WINDTUNNELTESTINGPART1MANAGEMENTVOLUME 风洞试验 部分 管理 PDF

链接地址:http://www.mydoc123.com/p-426697.html