AASHTO R 67-2015 Standard Practice for Sampling Asphalt Mixtures after Compaction (Obtaining Cores).pdf
《AASHTO R 67-2015 Standard Practice for Sampling Asphalt Mixtures after Compaction (Obtaining Cores).pdf》由会员分享,可在线阅读,更多相关《AASHTO R 67-2015 Standard Practice for Sampling Asphalt Mixtures after Compaction (Obtaining Cores).pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Standard Practice for Sampling Asphalt Mixtures after Compaction (Obtaining Cores) AASHTO Designation: R 67-151American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 249 Washington, D.C. 20001 TS-2c R 67-1 AASHTO Standard Practice for Sampling Asphalt
2、 Mixtures after Compaction (Obtaining Cores) AASHTO Designation: R 67-1511. SCOPE 1.1. This method describes the process for removal of a core sample of compacted asphalt mixture from a pavement for laboratory testing. Cores may range in diameter from 2 in. to 12 in. 1.2. This standard does not purp
3、ort to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 2. SIGNIFICANCE 2.1. Samples obtained in acco
4、rdance with the procedure may be used for measuring asphalt mixture thickness, density, and other testing. 3. APPARATUS 3.1. Core Drilling MachineA power-driven wet-core drilling machine shall be used to obtain the sample. The device shall be capable of obtaining a core to the full depth of the asph
5、alt mixture sampled and shall consist of a rigid frame or platform such that the core barrel can be maintained perpendicular to the pavement during the drilling process. The core drilling machine must be of sufficient horsepower and have the ability to reach a sufficient depth to minimize distortion
6、 of the compacted cores of asphalt mixture. 3.2. Core Drill BitThe cutting edge of the core drill bit shall be made of hardened steel or other suitable material with diamond chips embedded in the metal or as recommended by the core drill bit manufacturer in order to drill through the compacted aspha
7、lt mixture cleanly. The inside diameter of the core barrel shall be as specified. 3.3. Separation EquipmentA saw or other method(s) that provides a clean, smooth plane representing the layer to be tested without damaging the specimen. 3.4. Retrieval DeviceA device for removing core samples that will
8、 preserve the integrity of the core. Note 1Suitable devices have been made from steel rods, wire, or banding material. 3.5. Cooling AgentSuch as water, ice, dry ice, or liquid nitrogen. 4. PROCEDURE 4.1. Freshly compacted asphalt mixtures shall be allowed sufficient time to cool prior to coring in o
9、rder to prevent damage to the core. 2015 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-2c R 67-2 AASHTO 4.1.1. To accelerate the coring process, compacted asphalt mixtures may be cooled to expedite the r
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOR672015STANDARDPRACTICEFORSAMPLINGASPHALTMIXTURESAFTERCOMPACTIONOBTAININGCORESPDF

链接地址:http://www.mydoc123.com/p-418020.html