ABS 69-1993 Certification of Oil Spill Recovery Equipment《石油溢出恢复仪器证明》.pdf
《ABS 69-1993 Certification of Oil Spill Recovery Equipment《石油溢出恢复仪器证明》.pdf》由会员分享,可在线阅读,更多相关《ABS 69-1993 Certification of Oil Spill Recovery Equipment《石油溢出恢复仪器证明》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、- AMERICAN BUREAU OF SHIPPING 8 AFFILIATED COMPANIES GUIDE FOR CERTIFICATION OF OIL SPILL RECOVERY EQUIPMENT JANUARY 1993 This Guide represents the present approach of the American Bureau of Shipping in this subject and is being released for trial use. ABS will consider the modification of these req
2、uirements as necessary and appropriate. . - _ _ _ - ABS TITLEsGCQSRE TRIALWSE 93 0651iL02 Ob75L T9L = AMERICAN BUREAU OF SHIPPING 6 AF!ALlAED COMPANIES Guide for Certification of Oil Spill Recovery Equipment January 1993 American Bureau of Shipping Incorporated by Act of the Legislature of and State
3、 of New York 1662 Copyright 8 1993 American Bureau of Shipping Two World Trade Center, 106th Floor New York, NY, 10048 U.S.A. -_ _ - ABS TITLE*GCOSRE TRJAL*USE 93 .Ob5bb02 0006753 Ab4 Foreword This Guide has been prepared to provide a framework for the assessment and certification of equipment for o
4、il spill clean up. No representation is made as to the actual performance in a real spill situation. The Bureau makes no warranties regarding the efficacy or adequacy of the equipment beyond those expressly stated in the reports covering witnessed tests. It is expected that all equipment will be ope
5、rated as recommended by the respective manufacturers. Contents Guide for Certification of Oil Spill Recovery Equipment Foreword 1 General . 1 1.1 Application 1 1.2 Scope 1 1.3 Certification Basis 1 1.4 Registration . 1 1.4.1 Initial Registration 1 Continuation of Registration . 1 1.5 Drawings and da
6、ta to be submitted . 1 1.6 Design 2 1.7 Plant Audit 2 1.8 Construction 2 1.9 Capacity . 2 1.10 Availability 2 1.11 Portability 2 2 Storage 2 2.1 Protection from Seizure 2 2.2 Protection from Corrosion 3 2.3 Non-metallic Components 3 2.4 Protection from Biological Attack . 3 2.5 Communication Equipme
7、nt . 3 2.6 Source of Electrical Power . 3 2.7 Deployment . 3 3 Quality Assurance . 3 3.1 Type Approval (Option A) . 3 3.2 IS0 9000 Certified Quality System (Option B) . 4 4 Inspections and Surveys 4 4.1 Witnessing of Prototype Testing 4 4.2 Inspection of Production Units 4 4.3 Initial Storage Survey
8、 . 4 4.4 Annual Survey . 5 4.5 Special Periodic Survey . 5 5 Certificates . 5 5.1 General 5 5.2 Certificate of Type Approval 5 5.3 Certificate of Equipment Approval . 6 5.4 Certificate of Initial Storage . 6 5.5 Certificate of Annual Survey 6 5.6 6 Operations Manual . 6 1.4.2 . Certificate of Specia
9、l Periodical Survey . 6 Guide for Certification of Oil Spill Recovery Equipment Section 1 General 1.1 Application This Guide is applicable to equipment engaged in oil spill recovery and clean-up. 1.2 Scope All equipment which is in compliance with the requirements of this Guide will be listed in the
10、 ABS List of Certified Oil Spill Recovery and Cleanup Equipment along with the design identification number, serial number and date of most recent survey (see 4.3 through 4.5). 1.3 Certification Basis Certification will be carried out on the basis of a national, international, governmental, industry
11、 or manufacturer?s published standard. The standard specified by the manufacturer will be noted in the List. 1.4 Registration 1.4.1 Initial Registration A unique design identification number will be assigned to each equipment design upon satisfactory completion of design review, plant audit, equipme
12、nt inspection and witnessing of any applicable prototype testing. This number and the manufacturer?s serial number are to be indelibly marked on the item and are to be supplied to the Bureau by the manufacturer for publication in the List. 1.4.2 Continuation of Registration Continued inclusion in th
13、e List will depend upon continued compliance with the requirements of this Guide. 1.5 Drawings and data to be submitted The following drawings and data as applicable are to be submitted for review prior to commencement of audits, inspections and tests: a A description of the equipment. b Standard to
14、 which certification is being requested. c Schematic diagram of control, alarm and monitoring system. d Arrangement and details of the storage method including location of equipment or any limitations for storage. e Wiring diagram and arrangement and details of power supply for heating or dehumidifi
15、cation, if applicable. f Manufacturer?s specifications, drawings and data for compressors, motors, control, alarm and monitoring system. g Arrangements for pressure and vacuum relief in any pressurized system. GUIDE FOR CERTIFICATION OF OIL SPILL RECOVERY EQUIPMENT I i ABS TITLE*GCOSRE TRIAL*USE 73
16、E Ob5LL02 000b75b 573 h Details of pressure vessels as required by Section 8, Division I of the ASME Boiler and Pressure Vessel Code, or other applicable standard. i Piping system arrangement and details j Details of explosion proof and intrinsically safe equipment with copies of certification docum
17、ents. k Operations Manual (see Section 6). 1.6 Design All equipment is to be designed on the basis of a recognized standard. Sufficient details are to be submitted to permit review to determine compliance with the selected standard. 1.7 Plant Audit The plant where the item is produced or where the f
18、inal assembly is carried out is to be audited in accordance with Section 3 to ensure the capability to produce the item under consideration. 1.8 Construction All equipment is to be constructed using good commercial practice and workmans hip. 1.9 Capacity Capacity noted in the List will be as witness
19、ed during prototype tests conducted in accordance with the specified standard. 1.10 Availability All certified equipment is to be so constructed and stored as not to require removal from stand-by service for maintenance purposes for a period exceeding two (2) weeks per year. 1.11 Portability Any pie
20、ce of equipment which can be handled by two persons may be described as being “portable“. Section 2 Storage All certified equipment is to be stored in accordance with the following requirements: 2.1 Protection from Seizure All equipment is to be stored so as to prevent seizing of moving parts. Prese
21、rvatives which require extensive cleaning of the equipment prior to use are to be avoided. GUIDE FOR CERTIFICATION OF OIL SPILL RECOVERY EQUIPMENT I 2 ABS TITLE*GCOSRE TRIALWSE 93 m Ob5LL02 O006757 4OT m 2.2 Protection from Corrosion All equipment is to be stored so as to resist rusting or deteriora
22、tion due to corrosion. Relief devices are to be protected from inadvertent alteration of relief setting. 2.3 Non-metallic Components Materials sensitive to temperature are to be stored in locations where temperature fluctuations are within the manufacturers stated limits. Rubberized fabric is to be
23、folded and stored in accordance with the manufacturers recommendations such that creases formed are not deleterious to the intended purpose, nor would cause deterioration in performance. 2.4 Protection from Biological Attack Items susceptible to biological attack are to be protected from such attack
24、. Any chemical agents used are to be approved for such use by the cognizant authorities. 2.5 Communication Equipment Portable radios and other communications equipment are to be kept fully charged. Spare batteries are to be provided. 2.6 Source of Electrical Power Electrical generators are to be sto
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS691993CERTIFICATIONOFOILSPILLRECOVERYEQUIPMENT 石油 溢出 恢复 仪器 证明 PDF

链接地址:http://www.mydoc123.com/p-400942.html