1、11-10 23 05 11 - 1 SECTION 23 05 11 COMMON WORK RESULTS FOR HVAC SPEC WRITER NOTES: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. References to pressure in this section are gage pressure unles
2、s otherwise noted. 3. The spec writer shall review the Physical Security Design Manual for VA Facilities to determine and include in this section any Mission Critical or Life Safety requirements called out. PART 1 - GENERAL 1.1 DESCRIPTION A. The requirements of this Section apply to all sections of
3、 Division 23. B. Definitions: 1. Exposed: Piping, ductwork, and equipment exposed to view in finished rooms. 2. Option or optional: Contractors choice of an alternate material or method. 3. RE: Resident Engineer 4. COTR: Contracting Officers Technical Representative. 1.2 RELATED WORK A. Section 00 7
4、2 00, GENERAL CONDITIONS B. Section 01 00 00, GENERAL REQUIREMENTS C. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES /D. Section 02 65 00, UNDERGROUND STORAGE TANK REMOVAL/ /E. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT / /F. Section 31 20 00, EARTH MOVING: Excavation and Backfill
5、/ G. Section 03 30 00, CAST-IN-PLACE CONCRETE: Concrete and Grout H. Section 05 31 00, STEEL DECKING, / and Section 05 36 00, COMPOSITE METAL DECKING: Building Components for Attachment of Hangers / I. Section 05 50 00, METAL FABRICATIONS J. Section 07 84 00, FIRESTOPPING K. Section 07 60 00, FLASHI
6、NG AND SHEET METAL: Flashing for Wall and Roof Penetrations L. Section 07 92 00, JOINT SEALANTS M. Section 09 91 00, PAINTING /N. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS/ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
7、IHS-,-,-11-10 23 05 11 - 2 O. Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC and STEAM GENERATION P. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT Q. Section 23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC R. Section 23 07 11, HVAC, PLUMBING, and Boiler Plan
8、t Insulation S. Section 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT T. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC U. Section 23 10 00, FACILITY FUEL SYSTEMS V. Section 23 11 23, FACILITY NATURAL-GAS PIPING W. Section 23 21 13, HYDRONIC PIPING X. Section 23 21 23, HYDRONIC PU
9、MPS Y. Section 23 22 13, STEAM and CONDENSATE HEATING PIPING Z. Section 23 22 23, STEAM CONDENSATE PUMPS AA. Section 23 23 00, REFRIGERANT PIPING BB. Section 23 25 00, HVAC WATER TREATMENT CC. Section 23 31 00, HVAC DUCTS and CASINGS DD. Section 23 34 00, HVAC FANS EE. Section 23 36 00, AIR TERMINAL
10、 UNITS FF. Section 23 37 00, AIR OUTLETS and INLETS GG. Section 23 38 13, COMMERCIAL-KITCHEN HOODS HH. Section 23 40 00, HVAC AIR CLEANING DEVICES II. Section 23 51 00, BREECHINGS, CHIMNEYS, and STACKS JJ. Section 23 52 25, LOW-PRESSURE WATER HEATING BOILERS KK. Section 23 52 33, WATER-TUBE BOILERS
11、LL. Section 23 52 39, FIRE-TUBE BOILERS MM. Section 23 64 00, PACKAGED WATER CHILLERS NN. Section 23 65 00, COOLING TOWERS OO. Section 23 72 00, AIR-TO-AIR ENERGY RECOVERY EQUIPMENT PP. Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS QQ. Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATI
12、ON AIR-HANDLING UNITS RR. Section 23 81 00, DECENTRALIZED UNITARY HVAC EQUIPMENT SS. Section 23 81 23, COMPUTER-ROOM AIR-CONDITIONERS TT. Section 23 81 43, AIR-SOURCE UNITARY HEAT PUMPS UU. Section 23 81 46, WATER-SOURCE UNITARY HEAT PUMPS VV. Section 23 82 00, CONVECTION HEATING and COOLING UNITS W
13、W. Section 23 82 16, AIR COILS XX. Section 23 84 00, HUMIDITY CONTROL EQUIPMENT YY. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training ZZ. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS Provided by IHSNot for Resal
14、eNo reproduction or networking permitted without license from IHS-,-,-11-10 23 05 11 - 3 AAA. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS 1.3 QUALITY ASSURANCE A. Mechanical, electrical and associated systems shall be safe, reliable, efficient, durable, easily and safely operable and maintainable,
15、easily and safely accessible, and in compliance with applicable codes as specified. The systems shall be comprised of high quality institutional-class and industrial-class products of manufacturers that are experienced specialists in the required product lines. All construction firms and personnel s
16、hall be experienced and qualified specialists in industrial and institutional HVAC B. Flow Rate Tolerance for HVAC Equipment: Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC. C. Equipment Vibration Tolerance: 1. Refer to Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING and
17、EQUIPMENT. Equipment shall be factory-balanced to this tolerance and re-balanced on site, as necessary. 2. After HVAC air balance work is completed and permanent drive sheaves are in place, perform field mechanical balancing and adjustments required to meet the specified vibration tolerance. D. Prod
18、ucts Criteria: 1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years (or longer as specified elsewhere). The design, model and size of each item shall have been in satisfactory and effic
19、ient operation on at least three installations for approximately three years. However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the current generation of technology and basic design that has a proven satisfactory service record
20、of at least three years. See other specification sections for any exceptions and/or additional requirements. 2. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly. 3. Conform to code
21、s and standards as required by the specifications. Conform to local codes, if required by local authorities such as the natural gas supplier, if the local codes are more stringent then those specified. Refer any conflicts to the Resident Engineer. 4. Multiple Units: When two or more units of materia
22、ls or equipment of the same type or class are required, these units shall be products of one manufacturer. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 23 05 11 - 4 5. Assembled Units: Manufacturers of equipment assemblies, which use compone
23、nts made by others, assume complete responsibility for the final assembled product. 6. Nameplates: Nameplate bearing manufacturers name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise p
24、ermanently marked on each item of equipment. 7. Asbestos products or equipment or materials containing asbestos shall not be used. E. Equipment Service Organizations: 1. HVAC: Products and systems shall be supported by service organizations that maintain a complete inventory of repair parts and are
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2305112010COMMONWORKRESULTSFORHVACPDF