1、11-10 23 05 10 - 1 SECTION 23 05 10 COMMON WORK RESULTS FOR BOILER PLANT AND STEAM GENERATION SPEC WRITER NOTES: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. References to pressure in this se
2、ction are gage pressure unless otherwise noted. 3. The spec writer shall review the Physical Security Design Manual for VA Facilities to determine and include in this section any Mission Critical or Life Safety requirements called out. PART 1 - GENERAL 1.1 DESCRIPTION A. The requirements of this Sec
3、tion apply to all sections of Division 23 related to boiler plant and steam generation. B. Definitions: 1. Exposed: Piping, ductwork, and equipment exposed to view in finished rooms. 2. Option or optional: Contractors choice of an alternate material or method. 3. RE: Resident Engineer 1.2 RELATED WO
4、RK A. Section 00 72 00, GENERAL CONDITIONS. B. Section 01 00 00, GENERAL REQUIREMENTS. C. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. /D. Section 02 65 00, UNDERGROUND STORAGE TANK REMOVAL./ /E. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT. / /F. Section 31 20 00, EARTH MOVING: E
5、xcavation and Backfill / G. Section 03 30 00, CAST-IN-PLACE CONCRETE: Concrete and Grout. H. Section 05 31 00, STEEL DECKING, / and Section 05 36 00, COMPOSITE METAL DECKING: Building Components for Attachment of Hangers. / I. Section 05 50 00, METAL FABRICATIONS. J. Section 07 84 00, FIRESTOPPING.
6、K. Section 07 60 00, FLASHING AND SHEET METAL: Flashing for Wall and Roof Penetrations. L. Section 07 92 00, JOINT SEALANTS. M. Section 09 91 00, PAINTING. /N. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS./ Provided by IHSNot for ResaleNo reproduction or networking
7、permitted without license from IHS-,-,-11-10 23 05 10 - 2 O. Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC and STEAM GENERATION. P. Section 23 05 51, NOISE AND VIBRATION CONTROL FOR BOILER PLANT. Q. Section 23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC. R. Section 23 07 11, HVAC, PLUM
8、BING, and BOILER PLANT INSULATION. S. Section 23 08 11, DEMONSTRATIONS and TESTS FOR BOILER PLANT. T. Section 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT. U. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC. V. Section 23 10 00, FACILITY FUEL SYSTEMS. W. Section 23 11 23, FACILITY
9、 NATURAL-GAS PIPING. X. Section 23 21 11, BOILER PLANT PIPING SYSTEMS. Y. Section 23 50 11, BOILER PLANT MECHANICAL EQUIPMENT. Z. Section 23 51 00, BREECHINGS, CHIMNEYS, and STACKS. AA. Section 23 52 25, LOW-PRESSURE WATER HEATING BOILERS. BB. Section 23 52 33, WATER-TUBE BOILERS. CC. Section 23 52
10、39, FIRE-TUBE BOILERS. DD. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training. EE. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS FF. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS. 1.3 QUALITY ASSURANCE A. Mechanica
11、l, electrical and associated systems shall be safe, reliable, efficient, durable, easily and safely operable and maintainable, easily and safely accessible, and in compliance with applicable codes as specified. The systems shall be comprised of high quality institutional-class and industrial-class p
12、roducts of manufacturers that are experienced specialists in the required product lines. All construction firms and personnel shall be experienced and qualified specialists in industrial and institutional HVAC or steam boiler plant construction, as applicable. B. Flow Rate Tolerance for HVAC Equipme
13、nt: Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC. C. Equipment Vibration Tolerance: 1. Refer to Section 23 05 51, NOISE AND VIBRATION CONTROL FOR BOILER PLANT. Equipment shall be factory-balanced to this tolerance and re-balanced on site, as necessary. D. Products Criteria: 1. Standa
14、rd Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years (or longer as specified elsewhere). The design, model and size of each item shall have been in Provided by IHSNot for ResaleNo reproduction o
15、r networking permitted without license from IHS-,-,-11-10 23 05 10 - 3 satisfactory and efficient operation on at least three installations for approximately three years. However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the cur
16、rent generation of technology and basic design that has a proven satisfactory service record of at least three years. See other specification sections for any exceptions and/or additional requirements. 2. Refer to Section 23 09 11, INSTRUMENTATION AND CONTROL FOR BOILER PLANT, for quality assurance
17、requirements for boiler plant computer workstation software. 3. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly. 4. Conform to codes and standards as required by the specification
18、s. Conform to local codes, if required by local authorities such as the natural gas supplier, if the local codes are more stringent then those specified. Refer any conflicts to the Resident Engineer (RE). 5. Multiple Units: When two or more units of materials or equipment of the same type or class a
19、re required, these units shall be products of one manufacturer. 6. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product. 7. Nameplates: Nameplate bearing manufacturers name or identifiable trademar
20、k shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment. 8. Asbestos products or equipment or materials containing asbestos shall not be used. E. Equipment Service Organiza
21、tions: 1. Boiler Plants: Service organizations, authorized and trained by the manufacturers of the equipment supplied, shall be located within 100 miles of the project. These organizations shall come to the site and provide acceptable service to restore boiler plant operations within four hours of r
22、eceipt of notification by phone, e-mail or fax in event of an emergency, such as the shut-down of equipment; or within 24 hours in a non-emergency. Submit names, mail and e-mail addresses and phone numbers of service personnel and organizations providing service under these conditions for (as applic
23、able to the project): burners, burner control systems, boiler control systems, pumps, critical instrumentation, computer workstation and programming. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 23 05 10 - 4 F. Mechanical Systems Welding: Be
24、fore any welding is performed, contractor shall submit a certificate certifying that welders comply with the following requirements: 1. Qualify welding processes and operators for piping according to ASME “Boiler and Pressure Vessel Code“, Section IX, “Welding and Brazing Qualifications“. 2. Comply
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2305102010COMMONWORKRESULTSFORBOILERPLANTANDSTEAMGENERATIONPDF

链接地址:http://www.mydoc123.com/p-1074897.html