1、May 24,2002 1 SUBJECT 1588 OUTLINE OF INVESTIGATION FOR ROOF AND GUTTER DE-ICING CABLE UNITS Issue Number 4 MAY 24, 2002 COPYRIGHT O 1993, 2002 UNDERWRITERS LABORATORIES INC. 2 SUBJECT 1588 MAY 24,2002 No Text on This Page MAY 24. 2002 SUBJECT 1588 3 CONTENTS FOREWORD 4 INTRODUCTION 1 Scope . 5 4 Un
2、dated References CONSTRUCTION 5 Heating Conductors . 6 6 Grounding Component . 6 7 Outer Jacket . 7 8 Nonheating Leads . 7 9 Installation Components . 8 PERFORMANCE 10 General . 8 11 Heating Cable Tests 8 11 . 1 Crushing test . 8 11.2 Impact test 11.3 Abrasion tes 11.4 Cold-bend test 11.5 Flame test
3、 . 11 12.1 Installation test . 11 12.2 Input test 13 12.3 Temperature test . 13 12.4 Thermal protection . 13 12.5 Dielectric voltage-withstand test 13 12.6 Ground-fault current test 14 12.7 Lead pull-out test . 15 12.8 Weatherometer tests . 15 12.9 Tension test . 15 12.1 O Severe-use test . 15 12.1
4、1 Splice-insulation/insulation-resistance test 16 12.1 2 Splice-enclosure mechanical evaluation 16 12 Complete-System Tests 11 MARKINGS 13 Cable Unit . 16 INSTRUCTIONS 14 Installation Instructions 17 4 SUBJECT 1588 MAY 24,2002 FOREWORD A. This Outline of Investigation contains basic requirements for
5、 products covered by Underwriters Laboratories Inc. (UL) under its Follow-Up Service for this category within the limitations given below and in the Scope section of this Outline of Investigation. They are subject to revision as further experience and investigation may show is necessary or desirable
6、. B. The observance of these requirements by a manufacturer is one of the conditions of the continued coverage of the manufacturers product. C. A product which complies with the text of this Outline of Investigation will not necessarily be judged to comply with the Outline of Investigation if, when
7、examined and tested, it is found to have other features which impair the level of safety contemplated by these requirements. D. A product that contains features, characteristics, components, materials, or systems new or different from those covered by the requirements in this Outline of Investigatio
8、n, and that involves a risk of fire or of electric shock or injury to persons shall be evaluated using appropriate additional component and end-product requirements to maintain the level of safety as originally anticipated by the intent of this Outline of Investigation. A product whose features, cha
9、racteristics, components, materials, or systems conflict with specific requirements or provisions of this Outline of Investigation does not comply with this Outline of Investigation. Revision of requirements shall be proposed and adopted in conformance with the methods employed for development, revi
10、sion, and implementation of this Outline of Investigation. E. UL, in performing its functions in accordance with its objectives, does not assume or undertake to discharge any responsibility of the manufacturer or any other party. The opinions and findings of UL represent its professional judgement g
11、iven with due consideration to the necessary limitations of practical operation and state of the art at the time the Outline of Investigation is processed. UL shall not be responsible to anyone for the use of or reliance upon this Outline of Investigation by anyone. UL shall not incur any obligation
12、 or liability for damages, including consequential damages, arising out of or in connection with the use, interpretation of, or reliance upon this Outline of Investigation. F. Many tests required by the Outline of Investigations of UL are inherently hazardous and adequate safeguards for personnel an
13、d property shall be employed in conducting such tests. MAY 24, 2002 SUBJECT 1588 5 INTRODUCTION 1 Scope 1.1 This outline covers roof and gutter de-icing cable units intended for permanent connection. These cable units are intended for use in accordance with Article 426 of the National Electrical Cod
14、e, NFPA 70. 2 Components 2.1 Except as indicated in 2.2, a component of a product covered by this outline shall comply with the requirements for that component. 2.2 A component is not required to comply with a specific requirement that: a) Involves a feature or characteristic not required in the app
15、lication of the component in the product covered by this outline; or b) Is superseded by a requirement in this outline. 2.3 A component shall be used in accordance with its rating established for the intended conditions of use. 2.4 Specific components are incomplete in construction features or restr
16、icted in performance capabilities. Such components are intended for use only under limited conditions, such as certain temperatures not exceeding specified limits, and shall be used only under those specific conditions. 3 Units of Measurement 3.1 Values stated without parentheses are the requirement
17、. Values in parentheses are explanatory or approximate information. 4 Undated References 4.1 Any undated reference to a code or standard appearing in the requirements of this outline shall be interpreted as referring to the latest edition of that code or standard. 6 SUBJECT 1588 MAY 24,2002 CONSTRUC
18、TION 5 Heating Conductors 5.1 The heating conductors of other than a metallic-sheathed roof and gutter de-icing cable shall be insulated with a compound acceptable for use at 75C (167F) or higher in dry locations and 60C (140F) or higher in wet locations. The average thickness of the insulation shal
19、l not be less than 0.762 mm (0.030 inch) with a minimum of 0.686 mm (0.027 inch) at any one point. Magnesium oxide suitable for the purpose is acceptable as an insulating compound for use with metallic sheathed cables. 6 Grounding Component 6.1 The heating section of a roof and gutter de-icing cable
20、 shall be provided with a grounding component which consists of a metallic sheath or a metallic braid. In the case of a metallic braid, provision shall be made for connecting the braid to the branch-circuit grounding means by a means such as: a) A grounding lead 14 AWG minimum bare or green insulate
21、d copper wire; b) A fitting that surrounds the cable and mechanically secures the braid; or c) A lug to be crimped onto the pigtailed braid and then secured to a grounding screw in the supply junction box. If the heating section consists of more than one conductor, the grounding component may be inc
22、orporated on each conductor or all conductors may be enclosed within a common sheath or braid. The grounding component shall have an ampacity not less than that of 18 AWG copper conductor. 6.2 If the grounding component consists of a braid, it shall provide at least 50 percent coverage as determined
23、 according to the following formula: Percent coverage = 100 (2F - F2) in which: F= E; (OIFII) sina a - Angle of braid with axis of cable MAY 24. 2002 SUBJECT 1588 7 2nDP Tana= - C d - Diameter of individual braid wires in inches C - Number of carriers D - Diameter under shield in inches N - Number o
24、f wires per carrier P - Picks per inch 7 Outer Jacket 7.1 A weather-resistant jacket shall be provided over a metal braid used as a grounding component. Exception: An outerjacket is not required to be provided over a metal braid in units which demonstrate acceptable performance after being subjected
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT15882002OUTLINEOFINVESTIGATIONFORROOFANDGUTTERDEICINGCABLEUNITSISSUE4 屋顶 水槽 除冰 电缆 装置 调查 大纲 发布

链接地址:http://www.mydoc123.com/p-1069181.html