SANS 10339-2009 Underground rail trackwork in mines《矿中地下轨道工程》.pdf
《SANS 10339-2009 Underground rail trackwork in mines《矿中地下轨道工程》.pdf》由会员分享,可在线阅读,更多相关《SANS 10339-2009 Underground rail trackwork in mines《矿中地下轨道工程》.pdf(32页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. ISBN 978-0-626-22996-2 SANS 10339:2009Edition 2.1 SOUTH AFRICAN NATIONAL STANDARD Underground rail trackwork in mines Published by SABS Standards Divisio
4、n 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001 Tel: +27 12 428 7911 Fax: +27 12 344 1568 www.sabs.co.za SABS SANS 10339:2009 Edition 2.1 Table of changes Change No. Date Scope Amdt 1 2009 Amended to update a referenced standard. Foreword This South African standard was approved by Nat
5、ional Committee SABS SC 82A, Mining equipment Underground railway transport systems, in accordance with procedures of Standards South Africa, in compliance with annex 3 of the WTO/TBT agreement. This document was published in October 2009. This document supersedes SANS 10339:2006 (edition 2). In cla
6、use 3 reference is made to the “approving authority“. In South Africa this means the Engineering Council of South Africa (ECSA). A vertical line in the margin shows where the text has been technically modified by amendment No.1. Annexes B, G, and I form an integral part of this standard. Annexes A,
7、C, D, E, F and H are for information only. SANS 10339:2009 Edition 2.1 1 Contents Page Foreword 1 Scope 3 2 Definitions 3 3 Design . 8 4 Track technology . 8 5 Maintenance 10 Annex A (informative) Track geometry . 11 Annex B (normative) Classification criteria . 12 Annex C (informative) Typical haul
8、age cross-sections . 13 Annex D (informative) Turnouts and special trackwork. 15 Annex E (informative) Rail sections 19 Annex F (informative) Rail joints. 21 Annex G (normative) Maximum permissible deviations for track gauges . 23 Annex H (informative) Joint sleeper spacing. 25 Annex I (normative) R
9、ail fasteners 26 Bibliography 27 SANS 10339:2009 Edition 2.1 2 This page is intentionally left blank SANS 10339:2009 Edition 2.1 3 Underground rail trackwork in mines 1 Scope This standard covers the track systems currently in general use underground in mines. This standard specifies the requirement
10、s for the maintenance and safe use of underground and associated shaft head track systems. It is generally appreciated that safe, efficient and economical mining is very largely dependent on the efficiency of the horizontal transport system employed to convey men, materials and minerals. This standa
11、rd aims to give a guide to the standard of tracks required for the safe and economic operation of mines. The primary objective being to provide standards of trackwork which will result in minimizing accidents. NOTE 1 This standard concentrates on the bringing together of components to form a system
12、and specifies minimum requirements to which the system should be constructed and maintained. NOTE 2 This standard excludes trackwork in inclines and declines. 2 Definitions For the purposes of this standard, the following definitions apply. 2.1 axle load static load applied equally to the track stru
13、cture via each individual axle on which either a locomotive or an item of the rolling stock rests 2.2 ballast support structure placed on the top of the formation or footwall on which the sleepers will be laid 2.3 ballasting operation of placing the ballast to support and complete a track structure
14、2.4 breakaway any deviation of any underground tunnel from the prevailing tunnel direction NOTE A breakaway can facilitate another tunnel or provide additional space for utilities. SANS 10339:2009 Edition 2.1 4 2.5 camber inclination of the rail flange when placed on the sleeper in the correct posit
15、ion, to the horizontal 2.6 cross slacks twist difference in vertical alignment of two rails at the same point in a track that causes a sideward rolling motion of locomotives and rolling stock, i.e. rate of change of super elevation over a distance of 2 m Figure 1 Twist 2.7 fasteners application of a
16、 clip, spike, screw, clamp or any other such device that ensures that the rail remains firmly in position against the sleeper 2.8 fishplates pairs of shaped, parallel plates clamped through the web across the joint of two successive rails so as to form a well-supported running surface NOTE Fishplate
17、s are used to form a resilient rail joint. 2.9 formation track work foundation which consists of a compacted layer of material, preferably impervious to water, on which the ballast and other track structure will be placed NOTE The formation constitutes the lowest portion of the track structure suppo
18、rt. 2.10 gauge shortest distance between the internal vertical surfaces of the rail crowns 2.11 gauge widening increase in the nominal gauge SANS 10339:2009 Edition 2.1 5 2.12 geometry track geometry is the generic term describing the position of the rails in three dimensional space (see annex A) 2.
19、13 grade line surveyed line that provides a vertical datum at any required point along the haulage 2.14 high speed haulage underground haulage specifically designed for the transport of large tonnages of ore at speeds in excess of 16 km/h 2.15 horizontal differential at joint horizontal difference b
20、etween two rail ends at a joint measured on the inside of the crown of the rail 2.16 horizontal misalignment kinks deviation from the required horizontal alignment of both rails in the track at the same point Figure 2 Kinks 2.17 locomotive self-propelled mobile machine that operates on rails, that r
21、equires a driver and is specifically designed and constructed for the purpose of performing traction operations 2.18 low speed haulage underground haulage used for the transport of people, explosives, materials and ore safely at speeds up to a maximum of 5 km/h NOTE This quality of haulage represent
22、s the minimum acceptable standard. SANS 10339:2009 Edition 2.1 6 2.19 medium speed haulage underground haulage used for the transport of people, explosives, materials and ore safely at speeds up to a maximum of 16 km/h 2.20 permanent way rails, sleepers, fastenings and ballast which are laid and fix
23、ed in a proper position for the passage of trains 2.21 permanent way material rails, sleepers, fastenings and other track materials used in the trackwork 2.22 rail bound equipment rolling stock, locomotives and any other such item used for the movement of personnel, minerals, material, explosives an
24、d equipment on a track system 2.23 rail joints means by which the rails are joined together to form a longer continuous, running surface 2.24 rails rolled steel sections of varying composition, quality and size, which provide a continuous, running surface upon which the rail bound equipment can run
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS103392009UNDERGROUNDRAILTRACKWORKINMINES 地下 轨道 工程 PDF

链接地址:http://www.mydoc123.com/p-1028783.html