SANS 10120-2 LD-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LD Sew.pdf
《SANS 10120-2 LD-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LD Sew.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-2 LD-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section LD Sew.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Fart 2 SecLion LD-1382 Sewers Clause 1 . 2 . 3 . 3.1 3.2 3.2.1 3.2.2 PART 2 : PROJECT SPEClFICATION SECTION LU CONTENTS Page Number ESSENTIAL
4、 PROJECT SPECIFICATlON CLAUSES 1 ESSENTIAL DATA . 1 ADDITIONAL CLAUSES 1 General 1 Normal Projects 1 Hjqh strength or special quality vitrified clay pipes . Elastomeric joints 3.2.3 Concxete and mortar of dolomitic aqgregate . 3.2.4 Acceptable bows in AC pipes on flat grades . . 3.2.5 Marker posts 3
5、.2.6 Channel layouts in manholes 3.2.7 Lowering of existing manholes 3.2.P Minox changes to level of manhole covers . . Connectinq sewers Marking of positions of pipe ends . Bedding and infiltration at manholes Testing of manholes for watertiyhtness Other PSLU clauses Prestige Projects . Subeconomic
6、 Projects Labour-Based Projects . First Revision November 1982 This section of the code supersedes SABS 0120 : Part 2 : Section LD-1980 Approved by the COUNClL OF THE SOUTH AEHLCAN BUREAU OF STANDARDS SABS 0120 : Part 2 Section LD-1982 Sewers SARS 1200 LD : SEWERS NOTE: a) Number the PStU clauses in
7、 Portion 2 of the project specification in the sequence in which the clauses to which they relate appear in SABS 1200 LD. b) The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 LD. ESSENTIA
8、L PROJECT SPECIFICATION CLAUSES Set out suitable clauses in Portion 2 of the project specification to provide the essential informatio, as follows: a) (Subclause 3.5.3) Where prefabricated AC manholes will be accepted, state the requirements. h) (Subclause 5.6.4.3) If brick manholes are to be plaste
9、red, include a suitable clause. (See also Subclauses 1.1.3 of Section LD of Part 3 and 3.1.8.4 of Section LD of Part 5 of the code.) ESSENTIAL DATA The availability of certain essential data may affect the prices tendered. Except where such data have been given in the schedule, set out suitable clau
10、ses covering items such as the following in Portion 2 of the project specification: a) (Subclause 3.1.l.2) State the requirements for vitrified clay pipes that are to have a crushing strength of at least 45 kN per metre. (See also 3.2.1 below.) b) (Subclause 3.1.2) When relevant, state or schedule t
11、he class of reinforced concrete pipe to be supplied. c) (Subclauses 3.5.4 and 3.5.5) If reinforced concrete manholes, etc., are required to be manufactured from dolomitic aggregate, or if dolomitic sand is to be used for benching or mortar, set out the requirements. (See also 3.2.3 below and Subclau
12、se 1.1.3 of Section LD of Part 3 of the code.) d) (Suhclause 3.6) Where marker posts are required, state the requirements and include one or more suitable items in the schedule. (See also 3.2.5 below.) e) (Subclause 5.7) Designate the lengthls) of the pipeline(s1 to be encased in concrete, and state
13、 (or give on a drawing) the thickness of concrete required round the pipes. f) (Suhclause 5.9) For connecting sewers 1) state (or give on a drawing or in the schedule) the diameter of the connecting pipe and the main pipe, and the position and depth of the connection to the main sewer; and 2) where
14、the relative positions and invert levels at the end of the connecting sewer on an erf boundary and of the main sewer are such that neither a direct connection nor a sloping drop connection (as shown on Drawings LD-7 and LW8 of SABS 1200 LD) is practicable, set out alternative requirements for a suit
15、able drop connection, and schedule the connection accordingly. (See also Subclauses 1.1.5 and 1.3.7 of Section LD of Part 3 of the code.) ADDITIONAL CLAUSES GENERAL. Where it is necessary to amplify or otherwise to vary the terms of SABS 1200 LD to render them suitable for use in projects to be carr
16、ied out in particular locations or under particular circumstances, include in the project specification clauses dealing with matters other than those covered by Clauses 1 and 2. NORMAL PROJECTS NOTE: To meet requirements imposed by various norms of economic development, projects are classified as no
17、rmal, prestige, subeconomic, and labour-based projects (see Clause 4 of Section 0 of Part 3 of the code) . Hightrength or Special Quality Vitrified Clay Pipes (Subclause 3.1.1). Designate the portions of the - pipeline for which pipes are required that a) have been manufactured to tolerances that ar
18、e closer than normal, or bi have higher crushing strengths, or C) are to be subjected to special tests to prove their suitability or the suitability of their oitits for we in conveying strong chemical effluents. (See also Subclauses 2.2.2 arid 2.2.3 of Section LD of Part 3 of the code. Elastomeric J
19、oints (Subclauses 3.1.1 and 7.1). Where the provision of “suitable approved flexible joints“ means that special jointing or elastomeric materials are required that must be subjected to chemical tests, state the requirements. (See also Subclauses 1.3.1 and 1.3.10.1 of Section LD of Part 3 of the code
20、. ) Concrete and Mortar of Dolomitic Aggregate (Subclauses 3.1.2, 3.5.2, 3.5.4, and 3.5.5). Although it is desirable to use dolomitic materials, their use is uneconomic in many parts of the country because of the cost of transport. There is for instance no dolomitic stone in Natal. Where use of dolo
21、mitic aggregate is not economic, set out altarnative requirements in a suitable clause or schedule AC or vitrified clay pipes. Acceptable Bows in AC Pipcs on Flat Grades (Subclauscs 3.1.3 and 5.2.2). Unless, as in Subclause 5.2.2 of SAAS 1200 LD, bowed pipes are required to be laid with bows horizon
22、Eal, where grades are so nearly flat that the bow or maximum deflection permitted in terms of SABS 819 may cause pooling of sewage and lead to septic problems, jnclude a clause such as the following: PSLD 1.1 Acceptable bows in AC pipes (Subclause 3.1.3). Except that the deviatior from straightness
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101202LD1982CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART2PROJECTSPECIFICATIONSECTIONLDSEWPDF

链接地址:http://www.mydoc123.com/p-1028496.html