REG UFGS-08 22 20-2009 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES.pdf
《REG UFGS-08 22 20-2009 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES.pdf》由会员分享,可在线阅读,更多相关《REG UFGS-08 22 20-2009 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-08 22 20 (May 2009)-Preparing Activity: NASA NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 08 - OPENINGSSECTION 08 22 20FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES05/09P
2、ART 1 GENERAL1.1 REFERENCES1.2 PERFORMANCE REQUIREMENTS1.2.1 Structural1.2.2 Air Infiltration1.2.3 Water Penetration1.2.4 Provisions for Thermal Movement1.3 SUBMITTALS1.4 DELIVERY, STORAGE, AND HANDLING1.4.1 Delivery1.4.2 Storage1.4.3 Handling1.5 FIELD MEASUREMENTS1.6 WARRANTYPART 2 PRODUCTS2.1 MANU
3、FACTURER2.2 PRODUCT REQUIREMENTS2.2.1 Finish Surfaces2.2.2 Ultraviolet Protection2.2.3 Flame Spread Rating2.2.4 Structural Properties2.3 STANDARD FRP DOORS AND FRAMES2.3.1 General FRP Door and Frame2.3.1.1 FRP Door2.3.1.2 FRP Frame2.3.2 Labeled FRP Door2.3.3 Labeled FRP Frame2.3.4 Frame Anchors2.3.5
4、 Jamb Anchors2.4 HARDWARE PREPARATIONPART 3 EXECUTION3.1 INSTALLATIONSECTION 08 22 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.1 FRP Frame3.1.2 FRP Door3.1.3 Labeled Door and Frame3.2 PROTECTION3.3 ADJUSTMENT- End of Section Table of
5、 Contents -SECTION 08 22 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-08 22 20 (May 2009)-Preparing Activity: NASA NEWUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
6、April 2009*SECTION 08 22 20FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES05/09*NOTE: This guide specification covers fiberglass reinforced plastic (FRP) doors and frames. Some paragraphs may need to be supplemented to meet project requirements.Edit this guide specification for project specific
7、 requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are
8、welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*NOTE: On the draw
9、ings, show:1. Sizes of door openings, thicknesses of doors and frames, swings, and travels of doors, and design of doors, whether flush panel, full flush, paneled, glazed, or louvered.2. Details of structural or non-structural frame; head, jamb, and removable astragal.2. Details of fire rated or non
10、-fire rated frame; head, jamb, and removable astragal.3. Type and thickness of glazing required; whether or not insulating glass units are required.SECTION 08 22 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4. Method, type, and spacing re
11、quired for anchoring door frames to adjoining construction.5. Lintels and reinforcement required to support walls or partitions above doors.6. Type of shop finish surfaces.7. Free area for louvers in doors.8. Complete door schedule. Schedule should assign a separate number for each opening and shoul
12、d indicate door type and style, material, design, size, thickness, glazed or unglazed, class fire rating for fire doors, hardware set number, threshold material, if any, and material for frames; head, jamb, and astragal.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publicati
13、ons cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference A
14、rticle to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references
15、in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)ASCE 7-05 (2006; Errata 2007) Minimum Design Loads for Building
16、s and Other StructuresASTM INTERNATIONAL (ASTM)ASTM D 2344/D 2344M (2000; R 2006) Standard Test Method for Short-Beam Strength of Polymer Matrix Composite Materials and Their LaminatesSECTION 08 22 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
17、-,-,-ASTM D 256 (2006e1) Determining the Izod Pendulum Impact Resistance of PlasticsASTM D 635 (2006) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Self-Supporting Plastics in a Horizontal PositionASTM D 638 (2008) Standard Test Method for Tensile Properties of Plasti
18、csASTM D 695 (2008) Standard Test Method for Compressive Properties of Rigid PlasticsASTM D 696 (2008) Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica DilatometerASTM D 790 (2007e1) Flexural Properties of Unre
19、inforced and Reinforced Plastics and Electrical Insulating MaterialsASTM E 1300 (2007e1) Determining Load Resistance of Glass in BuildingsASTM E 2074 (2000e1) Standard Test Method for Fire Tests of Door Assemblies, Including Positive Pressure Testing of Side-Hinged and Pivoted Swinging Door Assembli
20、esASTM E 2112 (2007) Standard Practice for Installation of Exterior Windows, Doors and SkylightsASTM E 283 (2004) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the SpecimenASTM E 331 (2000; R 2009) Water Penetration
21、 of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure DifferenceASTM E 84 (2009) Standard Test Method for Surface Burning Characteristics of Building MaterialsASTM F 1642 (2004) Standard Test Method for Glazing and Glazing Systems Subject to Airblast LoadingsASTM F
22、 2248 (2003) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated GlassSECTION 08 22 20 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-BUILDERS HARDWARE MANUFACTU
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS0822202009FIBERGLASSREINFORCEDPLASTICFRPDOORSANDFRAMESPDF

链接地址:http://www.mydoc123.com/p-1019634.html