1、Lessons Learned Entry: 2042Lesson Info:a71 Lesson Number: 2042a71 Lesson Date: 2009-3-17a71 Submitting Organization: JPLa71 Submitted by: David Oberhettingera71 POC Name: Michaela71 POC Email: Michael.A.Grossjpl.nasa.gova71 POC Phone: 818-393-3342Subject: Each NASA Project Should Assess Its Complian
2、ce with NASA Lessons Learned Abstract: NASA has been criticized for failing to systematically make use of information in the NASA Lesson Learned Information System. Mars Exploration Rover, Kepler, and Juno are examples of major current JPL flight projects that have assessed their compliance with the
3、 lessons learned in this compendium. All NASA programs and projects should obtain insight into known risks by assigning each lesson learned to a subject matter expert, re-assessing its applicability at major milestones, and documenting their compliance status.Description of Driving Event: The NASA L
4、esson Learned Information System (LLIS) is a compendium of significant lessons learned from decades of spaceflight and support activities. However, NASA has been criticized for failing to systematically use this valuable information from past experience (Reference (1). In discussing the LLIS, the Co
5、lumbia Accident Investigation Board (Reference (2) remarked that “design engineers and mission assurance personnel use it only on an ad hoc basis, thereby limiting its utility.“ NASA once required programs and projects to assess, and report at each major project milestone, their application of these
6、 lessons learned (Reference (3). This iterative self-assessment is beneficial because the applicability of a given lesson learned (e.g., dont use this lubricant on titanium motor bearings) to a project may not be evident in an early project phase (i.e., when it hasnt yet selected a material for its
7、bearings). Projects beginning Phase A would typically assign each lesson learned in Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the LLIS to a subject matter expert, perform a preliminary assessment of its applicability, update this assessment as
8、necessary, and document the projects compliance status. In addition to assuring that lessons from prior experience are not ignored, this process may also identify content for the projects Significant Risk List. Major current Jet Propulsion Laboratory (JPL) flight projects that have assessed/self-aud
9、ited their application of NASA lessons learned include Kepler, Juno, and the “flagship“ Mars Exploration Rover (MER) project. Both the Kepler project and its system contractor assessed their compliance against the complete LLIS compendium- over 1100 lessons learned. The Juno project conducted self-a
10、udits prior to Preliminary Design Review (PDR) and Critical Design Review (CDR) to confirm that Juno had accounted for lessons learned not yet incorporated into the JPL Design Principles (Reference (4), and the project is continuing to review new LLIS content. The MER project elected to assess its a
11、pplication of the lessons learned contributed by two NASA Centers, JPL and NASA Goddard Space Flight Center (GSFC), because those Centers conduct mainly robotic missions similar to MER. The MER project prepared a Lessons Learned Compliance Matrix (Reference (5) that lists 364 lessons learned publish
12、ed between 1985 and 2003. (The MER project was in Phase D in 2003, with few opportunities to modify the rover design based on any lessons learned published after 2003.) For each entry, the matrix summarizes the lesson learned, identifies the engineering process owners assigned to review the lesson,
13、and reports on the status of MER compliance with the recommendations in the lesson learned. For example, Reference (6) is a JPL lesson learned that explains the need to involve project scientists in critical project decisions during system development. This compliance item was assigned on the matrix
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS20422009LESSONSLEARNEDEACHNASAPROJECTSHOULDASSESSITSCOMPLIANCEWITHNASALESSONSLEARNEDPDF

链接地址:http://www.mydoc123.com/p-1019346.html