1、Lessons Learned Entry: 1851Lesson Info:a71 Lesson Number: 1851a71 Submitting Organization: KSCa71 Submitted by: Scott Estesa71 POC Name: Scott Estesa71 POC Email: Scott.Estes-1nasa.govSubject: KSC Checkout and Launch Control System (CLCS) - Project, Systems, SM&A Abstract: The CLCS project was initi
2、ated in FY 1997 to modernize the Launch Processing System (LPS) that was engineered and developed in the 1970s. The modernization was needed to ensure continued safe and dependable launch support for the Shuttle program. Per initial planning, CLCS was projected to reduce the costs for Shuttle operat
3、ions at KSC, in addition to being an architecture in place that would support future planning and new program activities to occur at KSC. The CLCS project experienced many significant challenges even from the project startup (i.e., time and resources that included both funding and manpower). This le
4、sson document covers project/program management, systems engineering, and safey and mission assurance.Description of Driving Event: N/ALesson(s) Learned: Project startup takes time. Its difficult for the agency to free up resources (people and $) to get a project started. While a relatively small pr
5、oject office can perform initial project planning, follow-on contracts and civil service support takes a significant amount of time and effort to get in place.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Recommendation(s): Project/Program Manageme
6、nt 1. Dont fall into the trap of success-oriented planning. While it sells well, it causes a lot of pain down the road when problems inevitably occur. If the customers/sponsors cant stand the truth upfront, negotiate something that they can stomach or cancel the project. Make sure that the early pro
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS18512009LESSONSLEARNEDKSCCHECKOUTANDLAUNCHCONTROLSYSTEMCLCSPROJECTSYSTEMSSMAPDF

链接地址:http://www.mydoc123.com/p-1019320.html