REG NASA-LLIS-1401-2003 Lessons Learned Program and Project Management Strategic Work Breakdown Structure (WBS).pdf
《REG NASA-LLIS-1401-2003 Lessons Learned Program and Project Management Strategic Work Breakdown Structure (WBS).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1401-2003 Lessons Learned Program and Project Management Strategic Work Breakdown Structure (WBS).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1401Lesson Info:a71 Lesson Number: 1401a71 Lesson Date: 2003-01-01a71 Submitting Organization: ARCa71 Submitted by: Donald R. MendozaSubject: Program and Project Management: Strategic Work Breakdown Structure (WBS) Abstract: A detailed WBS is critical to the initial formulatio
2、n and planning of a Program/project. The absence of a WBS or one without sufficient detail will hinder the successful implementation of the Program/project, as resources will not be allocated effectively or efficiently, especially with respect to critical activities that are system-wide.Description
3、of Driving Event: The Project (one of several within a Program), which was formulated to develop and demonstrate technologies that contribute to a reduction in the aviation fatal accident rate, was initially organized into three elements. These three elements, while distinct from each other, also sh
4、ared many common aspects of Human Factors (HF). The Project was not initially intended to supply human factors expertise to other Program Projects. Each Project was responsible for their own integration within the Program and for addressing independent human factors issues related to their specific
5、products. Because of budget reductions and re-planning exercises, cross-cutting HF (i.e., HF issues that cut across several products within the Program) were not being addressed. In addition, independent HF issues were not sufficiently funded and scheduled. Thus, as the Project progressed under sche
6、dule and budget reallocations, both common and independent HF issues became the first items to be descoped or cut entirely from the Program. Since these HF issues are critical to the overall success of the Program, a solution was adopted that integrated all the crosscutting HF aspects into its own P
7、roject element. It was decided by the Program Manager, that the Project in question was the best suited to manage this new effort. No solution was identified for the Programs lack of sufficient human factors work within individual Projects.Provided by IHSNot for ResaleNo reproduction or networking p
8、ermitted without license from IHS-,-,-References: none Additional Key Words: WBS, Budget, Resource Allocation, Human Factors & Systems Engineers Lesson(s) Learned: 1. A detailed WBS is critical to the initial formulation and planning of a Program/project. The absence of a WBS or one without sufficie
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS14012003LESSONSLEARNEDPROGRAMANDPROJECTMANAGEMENTSTRATEGICWORKBREAKDOWNSTRUCTUREWBSPDF

链接地址:http://www.mydoc123.com/p-1019040.html