REG NASA-LLIS-1394--2004 Lessons Learned Project Management Lessons Learned on a Fast Track Engine Test.pdf
《REG NASA-LLIS-1394--2004 Lessons Learned Project Management Lessons Learned on a Fast Track Engine Test.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1394--2004 Lessons Learned Project Management Lessons Learned on a Fast Track Engine Test.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1394Lesson Info:a71 Lesson Number: 1394a71 Lesson Date: 2004-04-02a71 Submitting Organization: WSTFa71 Submitted by: Robert KowalskiSubject: Project Management Lessons Learned on a Fast Track Engine Test Abstract: A fast - track engine test was accepted by NASA before its risk
2、s and challenges were fully understood, leading to cost overruns and failure to meet original schedules.Description of Driving Event: In February 2003, the WSTF Propulsion Test Office accepted a task authorized through the Space Act agreement to perform a rocket engine test for a private company, by
3、 July 2003. While there were no real technical issues associated with the testing to be performed, there were certain aspects of the test program that were slightly different than the majority of testing performed at WSTF. These differences or challenges included high propellant inlet pressures, ver
4、y short duration firing pulse widths, and high accuracy propellant flowrate measurements for these short duration firings. These challenges drove design and fabrication of new test system hardware, with some technology that was not previously used at WSTF. Compounding these challenges were other iss
5、ues such as high work load of NASA and contractor project managers, a short timeframe in which to complete testing in order to not impact other tests in the area, and new and relatively inexperienced staff of project engineers. The technical challenges associated with this test program, drove design
6、 and fabrication of additional test systems to support the program, mainly propellant delivery systems that operated at pressures higher than typically used at WSTF, as well as incorporation of accurate flow measurement devices, using technology also not typically used at WSTF. As it would turn out,
7、 both the cost and schedule for design, fabrication and checkout of these items was greatly underestimated. Compounding these issues was the schedule pressure to complete the testing by a certain date, timeliness (or lack there of) of financial data, and over utilized project managers that could not
8、 adequately assess the financial and schedule data that was obtained. While the project was successful in the fact that testing was completed and requested data was delivered to the customer, the project was significantly over budget. Provided by IHSNot for ResaleNo reproduction or networking permit
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS13942004LESSONSLEARNEDPROJECTMANAGEMENTLESSONSLEARNEDONAFASTTRACKENGINETESTPDF

链接地址:http://www.mydoc123.com/p-1019033.html