1、Best Practices Entry: Best Practice Info:a71 Committee Approval Date: 2000-04-17a71 Center Point of Contact: JPLa71 Submitted by: Wil HarkinsSubject: Problem/Failure Report Independent Review/Approval Practice: Problem/Failure (P/F) Reports are reviewed independently and approved by reliability engi
2、neering specialists to ensure objectivity and integrity in the closure process. This practice assures that the analysis realistically bounds the extent of the P/F, and the corrective action and its verification are successfully accomplished. The key elements are:a71 Analysis must address the problem
3、.a71 Corrective action must address the analysis and the problem.a71 Analysis must address the effect on other items.a71 Corrective action must have been implemented.a71 Item must have passed the gate that caused the P/F - the hardware/software must be successfully retested.Abstract: Preferred Pract
4、ice for Design & Test. The utilization of a P/F reporting system that has an independent P/F closure process is a major factor in the elimination of in-flight hardware/software failures attributed to preflight P/F that were not resolved adequately prior to launch. Problem/Failure (P/F) Reports are r
5、eviewed independently and approved by reliability engineering specialists to ensure objectivity and integrity in the closure process.Programs that Certify Usage: This practice has been used on the Mariners, Seasat, IRAS, VGR, VIK, GLL and MGN programs.Center to Contact for Information: Provided by I
6、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-JPLImplementation Method: This Lesson Learned is based on Reliability Practice number PD-AP-1304, from NASA Technical Memorandum 4322A, Reliability Preferred Practices for Design and Test.Benefit:Any independent rev
7、iew process increases the level of compliance of the subject process. It also broadens the scope and depth of experience available for each individual issue without the need for a large supporting staff at each supplier organization. Also, an in-place independent review structure improves the rate o
8、f data flow for a given level of effort.Implementation Method:There are several levels of independent review in a sequential review process. A Problem/Failure (P/F) not only affects the subject hardware/software but other elements of the system as well. At the first level of independent review, the
9、project/task system engineering organization reviews all identified system related P/F reports, all unknown cause P/F reports, all design related P/F reports, and all critical concern P/F reports that are identified as “Red Flag.“At any level of the independent review process, specialists in the are
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS07902000LESSONSLEARNEDPROBLEMFAILUREREPORTINDEPENDENTREVIEWAPPROVALPDF

链接地址:http://www.mydoc123.com/p-1018436.html