欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0790--2000 Lessons Learned Problem Failure Report Independent Review Approval.pdf

    • 资源ID:1018436       资源大小:15.71KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0790--2000 Lessons Learned Problem Failure Report Independent Review Approval.pdf

    1、Best Practices Entry: Best Practice Info:a71 Committee Approval Date: 2000-04-17a71 Center Point of Contact: JPLa71 Submitted by: Wil HarkinsSubject: Problem/Failure Report Independent Review/Approval Practice: Problem/Failure (P/F) Reports are reviewed independently and approved by reliability engi

    2、neering specialists to ensure objectivity and integrity in the closure process. This practice assures that the analysis realistically bounds the extent of the P/F, and the corrective action and its verification are successfully accomplished. The key elements are:a71 Analysis must address the problem

    3、.a71 Corrective action must address the analysis and the problem.a71 Analysis must address the effect on other items.a71 Corrective action must have been implemented.a71 Item must have passed the gate that caused the P/F - the hardware/software must be successfully retested.Abstract: Preferred Pract

    4、ice for Design & Test. The utilization of a P/F reporting system that has an independent P/F closure process is a major factor in the elimination of in-flight hardware/software failures attributed to preflight P/F that were not resolved adequately prior to launch. Problem/Failure (P/F) Reports are r

    5、eviewed independently and approved by reliability engineering specialists to ensure objectivity and integrity in the closure process.Programs that Certify Usage: This practice has been used on the Mariners, Seasat, IRAS, VGR, VIK, GLL and MGN programs.Center to Contact for Information: Provided by I

    6、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-JPLImplementation Method: This Lesson Learned is based on Reliability Practice number PD-AP-1304, from NASA Technical Memorandum 4322A, Reliability Preferred Practices for Design and Test.Benefit:Any independent rev

    7、iew process increases the level of compliance of the subject process. It also broadens the scope and depth of experience available for each individual issue without the need for a large supporting staff at each supplier organization. Also, an in-place independent review structure improves the rate o

    8、f data flow for a given level of effort.Implementation Method:There are several levels of independent review in a sequential review process. A Problem/Failure (P/F) not only affects the subject hardware/software but other elements of the system as well. At the first level of independent review, the

    9、project/task system engineering organization reviews all identified system related P/F reports, all unknown cause P/F reports, all design related P/F reports, and all critical concern P/F reports that are identified as “Red Flag.“At any level of the independent review process, specialists in the are

    10、a of the P/F can be consulted for their expertise. As a subset of the system level review all project/task systems test or ground operations P/F reports are routed to the test and operations manager for verification of closure adequacy.All P/F reports not initially sent to systems, as well as those

    11、P/F reports that have been approved by systems, are sent to the project/task reliability engineering organization. Reliability engineering reviews each P/F report for adherence to the P/F reporting requirements, for completeness and lucidity of the technical contents, for uniformity of rating standa

    12、rds, and for identification of generic P/F or broad issue-related P/F.At this point in the P/F review process, issue-specific specialists can be consulted on issues requiring their field of expertise (safety, environmental factors, etc.) or to explore broader issues raised by an examination of the P

    13、/F that were not apparent at the internal P/F reporting level. P/F reports can be recycled back up the review chain if conditions are uncovered in the review process that warrant such an occurrence.The final step in the independent P/F closure process is the Project Management review and approval cy

    14、cle. In the optimum review process, the status of closed, nonrisk P/F reports is provided by periodic P/F reporting status reports. The critical P/F reports, classified by the “Red Flag“ rating, are Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-rou

    15、ted through the appropriate Project Management officials to determine the P/F impact on schedule and future funding, and to identify an element of residual mission risk.Technical Rationale:Independent P/F reporting closure is a key to reducing mission risk. On a recent mission, 25 percent of the con

    16、tractor-submitted Problem/Failure Reports (P/FRs) had risk rating changes as a result of independent review by Reliability Engineering. Of the 25 percent changed, 1/4 were significant or red flag P/FRs (i.e., 1/16 or 6 percent were major issues). This process results in fewer schedule delays and att

    17、endant funding problems late in the Project/Task, by providing the earliest isolation and documentation of P/F that can pose serious mission consequences. Generic P/F can be detected and consolidated in an efficient manner, with attendant cost savings. The P/F reporting system is a resource for prov

    18、iding visibility to all levels of management in near real-time.References:1. “Risk Rating of Problem/Failure Reports,“ Reliability Preferred Practice PD-AP-1305.Impact of Non-Practice: The utilization of a P/F reporting system that has an effective independent P/F closure process is a major factor i

    19、n the elimination of in-flight hardware/software failures attributed to preflight P/F that were not resolved adequately prior to launch.Related Practices: N/AAdditional Info: Approval Info: a71 Approval Date: 2000-04-17a71 Approval Name: Eric Raynora71 Approval Organization: QSa71 Approval Phone Number: 202-358-4738Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0790--2000 Lessons Learned Problem Failure Report Independent Review Approval.pdf)为本站会员(eveningprove235)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开