1、COMPLIANCE IS MANDATORY DIRECTIVE IS UNCONTROLLED WHEN PRINTED Verify curent version before use at htps:/dml.msfc.nasa.gov/directives MWI 8071.1 REVISION F EFFECTIVE DATE: OCTOBER 25, 2013 EXPIRATION DATE: OCTOBER 25, 2018 MARSHALL WORK INSTRUCTION ED01 FRACTURE CONTROL BOARD Provided by IHSNot for
2、ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshal Work Instruction ED01 Fracture Control Board MWI 8071.1 Revision: F Date: October 25, 2013 Page 2 of 9 DIRECTIVE IS UNCONTROLED WHEN PRINTED Verify curent version before use at htps:/dml.msfc.nasa.gov/directives DOCUM
3、ENT HISTORY LOG Status (Baseline/ Revision/ Change Canceled) Document Revision/ Change Effective Date Description Baseline 10/28/99 Revision A 3/22/2004 Added reference to NASA-STD-5007, updated Master List URL, updated appendix B, updated paragraph formatting (per MPG 1410.2) Revision B 10/28/2004
4、Update to curent format, complied with HQ rules review action Revision C 6/22/2005 Update for curent MSFC organization Revision D 1/23/2008 Update references, records, and Appendix B. Revision E 5/13/2008 Revised 2. Aplicability statement to adres the aplicability of this directive to the Michoud As
5、embly Facility. Revision F 10/25/13 Revised to adres 5-year expiration, format to new MWI template, and remove responsibilities statements. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshal Work Instruction ED01 Fracture Control Board MWI 8071.
6、1 Revision: F Date: October 25, 2013 Page 3 of 9 DIRECTIVE IS UNCONTROLED WHEN PRINTED Verify curent version before use at htps:/dml.msfc.nasa.gov/directives 1. PURPOSE To provide instructions for the Fracture Control Board (FCB) proces in order to comply with NASA-STD-5019 and NPR 1441.1. 2. APLICA
7、BILITY 2.1 This MWI applies to Center personnel, programs, projects, and activities, including contractors and resident agencies to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantes, Cooperative Agreement re
8、cipients, Space Act Agreement partners, or other agreement parties.) 2.2 This MWI applies to the Michoud Asembly Facility. 2.3 This MWI applies the following: al mandatory actions (i.e., requirements) are denoted by statements containing the term “shal.” The terms: “may” or “can” denote discretionar
9、y privilege or permision, “should” denotes a good practice and is recommended, but not required, “wil” denotes expected outcome, and “are/is” denotes descriptive material. 2.4 This MWI applies the following: al document citations are asumed to be the latest version unles otherwise noted. 2.5 This MW
10、I applies to al spaceflight hardware per NASA-STD-5019. 3. AUTHORITY 3.1 NPR 1441.1, “NASA Records Retention Schedules (NRRS)” 3.2 NASA-STD-5019, “Fracture Control Requirements for Spaceflight Hardware” 4. APLICABLE DOCUMENTS AND FORMS None. 5. INSTRUCTIONS 5.1 FCB Proces. The fracture control progr
11、ams for applicable MSFC spaceflight hardware shal be reviewed by the FCB. 5.1.1 Fracture control related data shal be developed by the Project/Program Organization (PPO) and submited to the FCB for review and approval acording to the schedule of the project/program design reviews as detailed below.
12、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshal Work Instruction ED01 Fracture Control Board MWI 8071.1 Revision: F Date: October 25, 2013 Page 4 of 9 DIRECTIVE IS UNCONTROLED WHEN PRINTED Verify curent version before use at htps:/dml.msfc.na
13、sa.gov/directives Project/Program Design Review Data Required circa the Systems Requirements Review Fracture Control Plan circa the Preliminary Design Review Fracture Control Plan Update Preliminary Fracture Mechanics Analysis Results circa the Critical Design Review Fracture Control Plan Update Fra
14、cture Mechanics Analysis Results Update 30 days prior to the Functional Certification Audit or Pre-shipment Review Complete Fracture Control Report 5.1.1.1 Fracture control data shal be provided to the FCB in writen form and/or oral presentation. 5.1.1.2 When requested by the PPO, the FCB shal also
15、review specific fracture control isues during the design proces, after shipment, and/or during the service life of the hardware. 5.1.2 Following each meting or review by the FCB of project/program fracture control isues, a memorandum shal be prepared detailing the discussions, any action items, and
16、FCB approval or concurrence, and communicated following the procedure detailed in Appendix E. 5.2. FCB Actionee Instructions Actionee Shal Perform Al Actions ED01/QD01 5.2.1 Jointly isue FCB appointment leters. (Se Appendix E.) ED01 5.2.2 Approve al asignments from ED01 to the FCB. QD01 5.2.3 Approv
17、e al asignments from QD01 to the FCB. Chairperson 5.2.4 Perform the duties asigned to the MSFC FCB. 5.2.5 Asign action items as necesary to correct deficiencies identified in the review proces. FCB 5.2.6 Support the MSFC FCB Chairperson in performing the duties asigned to the FCB. 5.2.7 Participate
18、in al scheduled FCB metings. 5.2.8 Review and comment on documents submited to the FCB for review. 5.2.9 Act as liaison with parent organization on isues concerning Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshal Work Instruction ED01 Fractur
19、e Control Board MWI 8071.1 Revision: F Date: October 25, 2013 Page 5 of 9 DIRECTIVE IS UNCONTROLED WHEN PRINTED Verify curent version before use at htps:/dml.msfc.nasa.gov/directives fracture control. FCBTS 5.2.10 Schedule FCB metings and provide meting notification. 5.2.11 Distribute documents subm
20、ited to the FCB for review. 5.2.12 Collect FCB members comments on reviewed documents. 5.2.13 Participate in al scheduled FCB metings. 5.2.14 Draft FCB review and approval leters. EM20 Records 5.2.15 Maintain records and files of FCB activity. Custodian PPO 5.2.16 Submit necesary fracture control do
21、cuments to the FCB for review and approval per the schedule in 6.1.1. 5.2.17 Participate and support scheduled FCB metings. 5.2.18 Respond to action items as asigned. 5.3 FCB Organization. The MSFC QD01 Director and the ED01 Director shal asign FCB members and their alternates from the following org
22、anizations: Position Organization Chairperson EM20 Technical Secretary EM20 Safety and Mision Asurance QD01 Non-Destructive Evaluation EM20 Materials/Fracture Mechanics EM20 Propulsion/Fracture Mechanics ER41 Spacecraft/Fracture Mechanics EV31 Payload/Fracture Mechanics ES22 5.3.1 The members and th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASAMWI80711REVF2013FRACTURECONTROLBOARDPDF

链接地址:http://www.mydoc123.com/p-1017608.html