NAVY UFGS-07 19 00-2011 WATER REPELLENTS《防水剂》.pdf
《NAVY UFGS-07 19 00-2011 WATER REPELLENTS《防水剂》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-07 19 00-2011 WATER REPELLENTS《防水剂》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-07 19 00 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-07 19 00 (April 2006)UFGS-07190 (September 1999)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 07 - THERMAL AND MOISTUR
2、E PROTECTIONSECTION 07 19 00WATER REPELLENTS05/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.3.1 Qualifications1.3.2 Performance Requirements1.3.3 Evidence of Acceptable Variation1.4 SAMPLE TEST PANEL1.4.1 Sample Test Panel1.4.1.1 Testing1.4.1.2 Approval1.4.2 Pre-Installation Me
3、eting1.5 REGULATORY REQUIREMENTS1.5.1 Environmental Protection1.6 DELIVERY, STORAGE, AND HANDLING1.7 SAFETY METHODS1.7.1 Toxic Materials1.8 ENVIRONMENTAL CONDITIONS1.8.1 Weather and Substrate Conditions1.8.2 Moisture Condition1.9 SEQUENCING AND SCHEDULING1.9.1 Masonry Surfaces1.9.2 Plaster Surfaces1
4、.9.3 Concrete Surfaces1.9.4 Sealants1.10 INSPECTIONS1.11 SURFACES TO BE COATED1.12 WARRANTYPART 2 PRODUCTS2.1 MATERIALS2.2 WATER REPELLENTS2.2.1 Silane, 20 Percent SolidsSECTION 07 19 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.2 Sil
5、ane, 40 Percent Solids2.2.3 Silane, 85 Percent Solids or Greater2.2.4 Siloxanes2.2.5 Low-Solids Acrylic2.2.6 High-Solids Acrylic2.2.7 VOC-Complying Water Repellents2.3 PERFORMANCE CRITERIA2.3.1 Silane, 20 Percent Solids2.3.2 Silane, 40 Percent Solids2.3.3 Silane, 85 Percent Solids or Greater2.3.4 Si
6、loxanesPART 3 EXECUTION3.1 EXAMINATION3.2 PREPARATION3.2.1 Surface Preparation3.2.2 Protection3.2.3 Compatibility3.3 MIXING3.4 APPLICATION3.4.1 Water Repellent Treatment3.4.1.1 Spray Application3.4.1.2 Brush or Roller Application3.4.1.3 Covered Surfaces3.4.1.4 Rate of Application3.4.1.5 Number of Co
7、ats3.4.1.6 Appearance3.5 CLEANING3.6 FIELD QUALITY CONTROL3.6.1 Field Testing3.6.2 Site Inspection- End of Section Table of Contents -SECTION 07 19 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-07 19 00
8、 (May 2011)-Preparing Activity: NAVFAC SupersedingUFGS-07 19 00 (April 2006)UFGS-07190 (September 1999)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 07 19 00WATER REPELLENTS05/11*NOTE: This guide specification covers the requirements for the ap
9、plication of water repellent coatings to above grade concrete, concrete masonry, and plaster surfaces.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specifica
10、tion for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recomm
11、ended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Graffiti resistance and glossy surface finish are not obtained with these penetrant-type repellents.*NOTE: On the drawings, show location of each type of water repellent to be use
12、d. Designate by code.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the SECTION 07 19 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-publications cited in the text of the guide specification. The publications are referre
13、d to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use
14、 the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of thi
15、s specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)AAMA 501.1 (2005) Standard Test Method for Water Penetration of Windows, Curtain Walls and Doors Using Dynamic PressureAMERI
16、CAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)AASHTO T 259 (2002; R 2006) Standard Method of Test for Resistance of Concrete to Chloride Ion PenetrationAASHTO T 260 (1997; R 2009) Standard Method of Test for Sampling and Testing for Chloride Ion in Concrete and Concrete Raw M
17、aterialsASTM INTERNATIONAL (ASTM)ASTM C 140 (2011) Standard Test Methods for Sampling and Testing Concrete Masonry Units and Related UnitsASTM C 642 (2006) Density, Absorption, and Voids in Hardened ConcreteASTM C 672/C 672M (2003) Scaling Resistance of Concrete Surfaces Exposed to Deicing Chemicals
18、ASTM D 1653 (2003; R 2008) Water Vapor Transmission of Organic Coating FilmsASTM D 2369 (2010) Volatile Content of CoatingsASTM D 3278 (1996; R 2004e1) Flash Point of Liquids by Small Scale Closed-Cup ApparatusSECTION 07 19 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitte
19、d without license from IHS-,-,-ASTM E 514/E 514M (2009) Standard Test Method for Water Penetration and Leakage Through MasonryASTM E 96/E 96M (2010) Standard Test Methods for Water Vapor Transmission of MaterialsASTM G 154 (2006) Standard Practice for Operating Fluorescent Light Apparatus for UV Exp
20、osure of Nonmetallic MaterialsU.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)29 CFR 1910.1000 Air Contaminants1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for t
21、he project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0719002011WATERREPELLENTS 防水剂 PDF