NAVY MIL-T-46632 B-1994 THRUSTER CARTRIDGE ACTUATED M2A2 METAL PARTS ASSEMBLY《M2A2金属零件集合发动弹药筒推进器》.pdf
《NAVY MIL-T-46632 B-1994 THRUSTER CARTRIDGE ACTUATED M2A2 METAL PARTS ASSEMBLY《M2A2金属零件集合发动弹药筒推进器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-46632 B-1994 THRUSTER CARTRIDGE ACTUATED M2A2 METAL PARTS ASSEMBLY《M2A2金属零件集合发动弹药筒推进器》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、HIL-T-46632B = 9999906 1985852 Tb5 INCH-POUND MlL-T-46632B(OS) 11 Augwst 1994 SUPERSEDING 20 August 1969 MIL-T-46632A0 MILITARY SPECIFICATION THRUSTER, CARTRIDGE ACTUATED, M2A2 METAL PARTS ASSEMBLY is specification is approved for use by the Naval Sea System Command, Department of the Navy, and is a
2、vailable for use by all Departments and Agencies of the Departments of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the M2A2 Cartridge Actuated Thruster Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards
3、. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited
4、 in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-4 13 Sampling Procedures And Tables For Inspection By Attributes Quality Assurance Terms And Definitions Visual Inspection Guide for Elastomeric
5、 O-rings Beneficial comments (recommendations, additions, deletions) ad any pertinent data which may be of use in improving this documen should be ddressed to: Coder, Mian Head Division, Naval Surface Warfare Center, Standardization Branch (Code 8420), 101 Strauss Avenue, Indian Head, MD 20640-5035,
6、 by using the Standardization Document Improvement Proposal D Form 1426) appearing at the end of this document or by sending a letter. AMSC N/A FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permit
7、ted without license from IHS-,-,-NIL-T-4bb32B 9999906 1985853 9TL (Unless otherwise indicated, copies of federai and military specifications and standards are available from Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 191 1 1-5094.) 2.1.2 Other Government doc
8、uments, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS Naval Surface Warfare Center, Indian Head (CAGE Codes 19200 and 19203
9、) 8593874 Thruster, Cartridge Actuated, M2A2 Metal Parts Assembly 8797633 Box, Fiberboard (Inner), Packing, Ammunition, For Thruster, Cartridge Actuated, M2A2 8 7 9 7 6 3 4 Box, Packing, Ammunition, For Thruster, Cartridge Actuated, M2A2 - 9235819 Box, Fiberboard (Outer), Alternative, Packing Ammuni
10、tion, for Thruster, Cartridge Actuated, M2A2 U.S. Air Force TPO 00-921-5048 Thruster, Cartridge Actuated, M2A2 (Application for copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Attn: Data Control Branch (Code 8410), Indian Head, MD 20640-5035.) 2.2 Order
11、of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Fi
12、rst article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to the first article inspection (see 4.4 and 6.3). 3.2 Materials. All materiais used in the manufacture of the thrusters shall conform to the specifications referred to on the respective drawings unl
13、ess specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.2.1 Raw
14、material. The contractor shall be responsible for selecting from the classification list contained in the raw material specification the surface and physical condition of the raw material intended for use in manufacture. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without
15、license from IHS-,-,-MIL-T-4bb32B 999990b 1985854 838 3.3 Hardness and other physical properties. Hardness and other physical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenching and
16、 tempering. 3.4 Hydrostatic pressure. The body and head shall withstand a hydrostatic pressure of 10,ooO pounds per square inch (psi) for 15 seconds, minimum, without leaking, deformation, or mechanical failure (see 6.4.1). 3.5 Torque. 3.5.1 Assembly torque. The body and holding rings shall be assem
17、bled hand tight. A torque of 100 + 20 inch pounds shall then be applied between the body and holding ring for the purpose of tightening the assembly prior to spotting threads for setscrew installation. 3.5.2 Breakaway torque. The body with respect to the holding ring shall withstand a breakaway torq
18、ue application of 400 inch pounds, minimum, without any movement or deformation. 3.6 Structural strength. The assembled thruster shall withstand a static tensile force of 2,000 pounds, minimum, for 15 seconds, minimum, between mounting points without unlocking and without mechanical failure (see 6.4
19、.1). 3.7 Shear pin strength. The shear pin, after application of protective finish, shall shear when a load of 55 k 4 pounds is applied at the steady rate of 0.125 inch per minute. 3.8 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requirements of the meta
20、l parts assembly drawing and the requirements of 3.8.1 through 3.8.3. 3.8.1 Head and body. The head and body shall be assembled hand tight. 3.8.2 Piston locking spring and end sleeve. The piston locking spring shall enter the spring hole in the piston without any bending along its entire length. The
21、 assembly of the piston locking spring to the end sleeve, with the cap screw and washer, shall be hand tight. If axial misalignment of the piston locking spring occurs upon completion of assembly, it will be permissible to back off the cap screw sufficiently to eliminate axial misalignment of the pi
22、ston locking spring. 3.8.3 End sleeve rotation. Upon completion of assembly and after the structural strength test, the end sleeve shall be free to rotate 360 degrees in a clockwise direction. 3.9 Protective finish. Protective finish shall be in accordance with the applicable specifications and shal
23、l apply to all surfaces of the component regardless of contour configuration. 3.10 Residual magnetism. The metal parts assembly shall not deflect the indicator of the compass more than five degrees in either direction using procedures in 4.6.7. 3.11 Workmanship. Thrusters shall be free of cracks, sp
24、lits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-46632B M 9999906 1985855 774 M 3.11.1 Metal defects. All components shall be f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT46632B1994THRUSTERCARTRIDGEACTUATEDM2A2METALPARTSASSEMBLYM2A2 金属 零件 集合 动弹 药筒 推进器 PDF

链接地址:http://www.mydoc123.com/p-982720.html