NAVY MIL-I-60522 A-1994 INITIATOR CARTRIDGE ACTUATED M5A2 METAL PARTS ASSEMBLY《M5A2火药驱动起始装置金属装配件》.pdf
《NAVY MIL-I-60522 A-1994 INITIATOR CARTRIDGE ACTUATED M5A2 METAL PARTS ASSEMBLY《M5A2火药驱动起始装置金属装配件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-60522 A-1994 INITIATOR CARTRIDGE ACTUATED M5A2 METAL PARTS ASSEMBLY《M5A2火药驱动起始装置金属装配件》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-I-bO522A = O6 L985L4 151 1 INCH-POUND I MIL-I-60522A(OS) 10 Aumist 1994 SUPERSEDING 11 August 1969 MIL-140522 MILITARY SPECIFICATION INITIATOR, CARTRIDGE ACTUATED, MSA2 METAL PARTS ASSEMBLY Zis specijkation is approved for use by the Naval Sea Systems Command, Department of the Navy, and is avai
2、lable for use by all Departments and Agencies of the Deparrments of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the MSA2 Cartridge Actuated Initiator Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards.
3、The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited i
4、n the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For STANDARDS MILITARY MIL-STD- 105 MIL-STD-109 MIL-STD-4 13 Sampling Procedures And Tables For Inspection By Attributes Quality Assurance Terms And Definitions Visual Inspection Guide for Elastomeric
5、O-rings Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Standanlization Branch (Code 8420), 101 Strauss Avenue, Indian Head, MD 206
6、40-5035, by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by sending a letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or network
7、ing permitted without license from IHS-,-,-flIL-I-bO522A = 999990b 1985815 098 (Unless otherwise indicated, copies of federal and military specifications and standards are available from Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.1.2 Other Go
8、vernment documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation (see 6.2). DRAWINGS Naval Surface Warfare Center, Indian Head (CAGE Codes 192
9、00 and 19203) 8596 17 1 Initiator, Cartridge Actuated, M5A2 Metal Parts Assembly 879654 1 Box, Fiberboard (Inner), Packing, Ammunition, For Initiator, Cartridge Actuated, M3A2, M5A2 8796542 Box, Packing, Ammunition, For Initiator, Cartridge Actuated, M3A2, M5A2 92 16934 Box, Fiberboard (Outer), Alte
10、rnative, Packing Ammunition, for Initiator, Cartridge Actuated, M3A2, M5A2 U.S. Air Force TPO 00-932-503 1 Initiator, Cartridge Actuated, M3A2, M5A2 (Application for copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Attn: Data Control Branch (Code 8410), I
11、ndian Head, MD 20640-5035.) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has
12、 been obtained. 3. REQUIREMENTS 3.1 first article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to the first article inspection (see 4.4 and 6.3). 3.2 Materials. All materiais used in the manufacture of the initiators shall conform to the specifications ref
13、erred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be cle
14、arly stated in the proposal. 3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list contained in the raw material specification the surface and physical condition of the raw material intended for use in manufacture. 2 Provided by IHSNot for ResaleNo reprod
15、uction or networking permitted without license from IHS-,-,-3.3 Hardness and other physical properties. Hardness and other physical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenchi
16、ng and tempering. 3.4 Hydrostatic pressure. The initiator chamber and cap shall withstand a hydrostatic pressure of 5500 to 6500 pounds per square inch (psi) for 15 seconds, minimum, without deformation or mechanical failure (see 6.4.1). 3.5 Shear pin strength. The shear pin, after application of pr
17、otective finish, shall shear when a load of 41 f 5 pounds is applied at the steady rate of 0.125 inches per minute. 3.6 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. All threaded joints shall be assembled
18、handtight. 3.7 Protective finish. Protective finish shall be in accordance with the applicable specifications and shall apply to all surfaces of the component regardless of contour configuration. 3.8 Residual magnetism. The metal parts assembly shall not deflect the indicator of the compass more tha
19、n five degrees in either direction using procedures in 4.6.5. 3.9 Workmanship. Initiators shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3.9.1 Metal defects. All components shall be free from cracks, spli
20、ts, cold shuts, inclusions, porosity, or any similar defect. 3.9.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.9.3 Foreign matter. No part or assembly shall contain chips, dirt, grease,
21、rust, corrosion, or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Ex
22、cept as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspection
23、s set forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements (see 6.2). 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification s
24、hall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for 3 Provided by IHSNot fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI60522A1994INITIATORCARTRIDGEACTUATEDM5A2METALPARTSASSEMBLYM5A2 火药 驱动 起始 装置 金属 装配 PDF

链接地址:http://www.mydoc123.com/p-979931.html