NAVY MIL-C-85122-1980 CARTRIDGES 20 MM MARK 100 SERIES《20MM标注100串行的炮弹》.pdf
《NAVY MIL-C-85122-1980 CARTRIDGES 20 MM MARK 100 SERIES《20MM标注100串行的炮弹》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-85122-1980 CARTRIDGES 20 MM MARK 100 SERIES《20MM标注100串行的炮弹》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION FOR MIM-85 12 2(A) b!#” neck, shoulder, body, or base (c) Flange cracks Failure to extracts including sheared rim Failure to chamber Gun stoppage (from ammunition defects not listed) Separation of metal parts of projectile assembly during flight: (a) Body Breakup (b) Loss of n
2、ose, fuze, or windshield (c) Complete rotating band separation (d) Partial rotating band separation with band seat knurling imprint detectable on band 8 Maximum allowable defective unit& O O 2 5 81 O O O 3 - 31 21 O O O O O O O i I t 1 Provided by IHSNot for ResaleNo reproduction or networking permi
3、tted without license from IHS-,-,-. TABLE L Maximum allowable firing defects per lot sample (continued), Defects (e) Partid. rotating band separation with bands, having no evidence of band seat knurling imprint: (1) Fragments having lengths no greater than 0.500 inch (2) Fragments having length grea
4、ter than 0.500 inch (3) Particles from normal band fringing or slivering Maximum allowable defective units- 3 O - 5/ - &/The number of defective units permitted pertain to the total number of cart- ridges fired as specified in Table II, except that primer leaks shall not be consi- ered defects for c
5、artridges fired in a single action. ?Unseated or upset primer buttons without indication of gas leakage are not considered as defective units. -Flange cracks, as determined by visual examination, shall not be cause for rejection of the lot but shall be recorded and reported. $Prior to firing a light
6、 application of oil or other lubricants, as required, may be applied to the cartridge case. ?/Lot will not be penalized. 3.6.1 Dro sensitivit HEI and API projectiles shall not deflagrate or function on impact + wit a steel plate at a velocity of 52 f5 ft/sec or a drop, nose down, from a &foot height
7、. 3.7 Identification and marking. The cartridges shall be identified and marked as specified on the applicable drawing. 3.8 Government-loaned property. The following gage will be Government- loaned property: 20 MM Cartridge MARK 5 MOD O Assembled Ammunition Gage (Drawing 1314850). 9 Provided by IHSN
8、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4 MIL-C-85122 13 999940b 0363885 O i! 3.9 Workmanship. The cartridges shall be assembled utilizing good workman- ship practices common to the ordnance industry. Particular care shall be taken that ail components are cl
9、ean, free from grease, dirt, corrosion, chips and foreign material. Components with obvious defects or handling damage that could affect performance of the cartridge or test weapon shall not be assembled. 3.9.1 Special working conditions. Facilities used in the manufacture, testing, and inspection o
10、f cartridges shall meet the minimum standards for working con- dit ions of MIL-STD-1695. 3.10 Ammunition data cards -Ammunition data cards (DD Form 1650) shall be completed in accordance with MIL-STD-1167 for each lot of cartridges (see 6.2.2). An ammunition data card shall be placed on top of the c
11、ontents of each am munition box, 4. QUALITY ASSURANCE PROVISIONS. 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspec- tion requirements as specified herein. Except as otherwise specified in
12、the con- tract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specifica
13、tion where such inspec- tions are deemed necessary to assure that supplies and services conform to pre- scribed requirements. * 4.1.1 Special working environment. To meet the requirements of 3.9.1, the contractor shall provide adequate facilities for the fabrication, assembly, and testing of supplie
14、s to be delivered in accordance with this specification. 4.2 Classification of inspections. inspection requirements specified herein are classified as follows: (a) (b) First article inspections (see 4.4). Quality conformance inspections (see 4.5). (1) Individual. inspections. (2) Sampling inspection
15、s. -*. , 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIM-85 12 2(AS) 4.3 Inspection provisions and conditions. All firing inspections (tests) shall be accomplished at the testing activity specified in contract or purchase order (see 6.2.1). 4.
16、3.1 Inspection equipment. Unless otherwise specified in the contract or pur- chase order (see 6.2.11, all inspection equipment shall be supplied and maintained by the contractor in accordance with MIL-1-45607. 4.4 First articio inspection. The 1,250 first article samples (see 3.2) shall be subjected
17、 to the examinations and tests of Table II. Failure of any cartridge to meet the requirements specified herein shall be cause for rejection of the first article samples. 4.5 Quality conformance inspection. The quality conformance sample shall be subjected to the examinations and tests of Table II. 4
18、.5.1 Production lot. The production lot shall be not less than 20,000 cartridges and not more than 50,000 cartridges. The lot shall consist of the following: (a) Projectiles from one lot. (b) Cartridge cases from one lot. (cl Primers from one lot. (d) Propellant from one index. (e) Tracers from one
19、lot. , (f) Fuzes from one lot. 4.5.1.1 Mixed component lot. When the lot size has been established, all com- ponents that are left over me to be retained until a sufficient number is accumu- lated for a mixed lot of 20,000 to 50,000 Cartridges. The accumulated leftovers of propellant shall not be us
20、ed in mixed component lots unless blended by a method acceptable to the procuring activity as determined by the Government representa- tive, with a charge determination made for its assembly into the cartridges. The blending method shall be made available for review by the Government representa- tiv
21、e. Mixed components shall not be used without prior approval of the procuring activity. The ammunition data card shall contain information on all lots of com- ponents used. 4.5.1.2 Lot identification. Each cartridge and each packed cartridge lot shall be identified in accordance with applicable draw
22、ings and MIL-STD-1168, supple- mented as directed by the procuring activity (see 6.2.1). 11 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- L, _I_I_ - MIL-C-85122 13 7777906 O363887 4 - _- TABLE II. First article and quality conformance inspection.
23、Test or examination Group I Visual and mechanical Cer tif ication Gaging- 21 Proiec tile extraction- 2/ - 21 il 51 . Group II- Velocity-pressure Waterproof velocity Action time 6/ Accuracy firing Function and casualty- Group III- 2/ $/ High pressure (HPT) Low pressure (LPT) Safety (HEI, API, APT) Dr
24、op sensitivity (HEI, API) Incendiary performance ( API) ”racer functioning (APT) High explosive incendiary (HEI 1 Group IV Preparation for delivery Quantity i/ All- All All 50- 31 25 20 20 20 300 25 25 20 10 20 20 20 Requirement 3.3, 3.7 and 3.9 3.3 and 3.4.1.2 3.3 3.4.3.1 3.5.1.1 3.5.1.2 3.5.1.3 3.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC851221980CARTRIDGES20MMMARK100SERIES20MM 标注 100 串行 炮弹 PDF

链接地址:http://www.mydoc123.com/p-978157.html