NAVY MIL-B-85251-1981 BOMB BINARY CHEMICAL EMPTY (BLU-80 B)《二元化学武器空(BLU-80 B)炸弹》.pdf
《NAVY MIL-B-85251-1981 BOMB BINARY CHEMICAL EMPTY (BLU-80 B)《二元化学武器空(BLU-80 B)炸弹》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-B-85251-1981 BOMB BINARY CHEMICAL EMPTY (BLU-80 B)《二元化学武器空(BLU-80 B)炸弹》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、MILL-85251 13 7747906 03b4070 4 MIL-B-85251(AS) 13 June 1981 K MILITARY SPECIFICATION BOMB, BINARY CHEMICAL, EMPTY (BLU-80/B) This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of
2、 Defense. 1. SCOPE. 1.1 Scope. This Specification establishes the manufacture and accept- ance of the BLU-80/B Bomb, Chemical, Empty, critical item, referred to herein as the bomb in accordance with DL X4900592. 2. APPLICABLE DOCUMENTS. 2.1 Issues of documents. The following documents of the issue i
3、n effect on date of invitation for bids or request for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-W-52574 Welding Process and Welding Procedure Requirements for Manufacture of . Equipment Utilizing Steel. MIL-B-85252 Ballonet, Cartridge Act
4、ivated (MXU-695/B). MIL-C-85254 Charge, Linear Shaped. MIL-M-85255 Motor, Hot Gas (MAU-l32A/B) 5 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Air Engineering Center,
5、 Engineering Specifications and Standards Department (ESSD), Code 93, Lakehurst, NJ 08733, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document, or by letter. Licensed by Information Handling ServicesMIL-B-5253 13 MIL-B-85251(
6、AS) MIL-C-85257 MIL-G-85258 MIL-F-85328 STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-129 MIL-STD-810 MIL-STD-45662 DRAWINGS Naval Air Systems Command (Code Ident 30003) 479AS100 DL X4900537 DL X4900592 DL X4900750 DL X4900810 SA 2875560 X4900593 _. X49 005 9 4 - Cord Assembly, Detonating Gener
7、ator, Gas Pressure. Firing Device, Explosive Actuator. Sampling Procedures and Tables for Inspection by Attributes. Quality Assurance Terms and Definitions. Marking for Shipment and Storage. 2 Environmental Test Methods. Calibration Systems Requirements. MA; Dufingthe four . to five complete 360 deg
8、 turns the impulse cartridge (CCU-l3/B) shall be. - initiated due to the rotation of the central injector. Theimpulse cartridge shall cause the ballonet to expand. The expansion of the . ballonet shall cause the material contained on the ballonet to be injected into the bomb reactor tank, due to the
9、 rupture of the scored segments of the-injector tube (see Drawing X4900623). . 3.2.1.6 Port opening. Upon initiation of the MARK 339 fuze, the explosive train shall cause the two forward ports to be completely severed from the weapon and the two aft ports to be severed so as to leave a hinge about w
10、hich the port deflects into the weapon body. 3.2.2 Environmental. The weapon performance shall not be degraded below that specified in 3.2.1 after exposure to the following environments. 3.2.2.1 High temperature. Exposure to a high temperature of +74 de- grees Celsius (OC) for 48 consecutive hours (
11、see 4.4.3.1). 3.2.2.2 Low temperature. Exposure to a low temperature of -48OC for 24 consecutive hours (see 4.4.3.2). 3.2.2.3 Vibration. Exposure to the vibration schedule specified in Figure 2 in each of the three mutually perpendicular axes at a temper- ature of -4OOC (see 4.4.3.3). 3.2.2.4 Shock.
12、 Exposure to half sine wave impact shocks in each of three mutually perpendicular axes having a peak amplitude of 25 gravity units (8) and a total duration of 11 ms (see 4.4.3.4). 3.2.2.5 Temperature cycling. Exposure to temperatures alternating between -40 and +6OoC (see 4.4.4). 3.2.2.6 Humidity. E
13、xposure to a relative humidity of up to 95 percent (see 4.4.3.5). 3.3 Design and construction. 3.3.1 Production.drawings. The bomb shall be fabricated and assembled in accordance with the drawings, parts list, and other documents listed on DL X4900592 5 Licensed by Information Handling Services3.3.2
14、 Standards of manufacture. 3.3.2.1 Certification. When specified in the contract or purchase order, the contractor shall include written certification to the pro- curing activity (see 6.2.2), accompanied by objective quality evidence, as defined in MIL-STD-109, that the materials, processes, and par
15、ts used in the assembly meet the applicable requirements for each item. Further, the certification shall attest that the following bomb subcom- ponents installed on each bomb meet the requirements specified: Subcomponent Specification a. Detonating Cord Assembly MIL-C-85257(AS) b. Gas Generator MIL-
16、G-85258(AS) c. Linear Shaped Charges MIL-C- 85254 (AS) d. Firing Device Explosive Actuator MIL-F-85328CAS) e. Hot Gas Motor MIL-Fl-85 255 (AS) f. Fuze, Mechanical Time, MARK 339 MOD 1 AS-2671 3.3.2.2 Manufacturing processes and procedures. When specified in the contract or purchase order, the contra
17、ctor shall prepare, in his own format, written procedures for welding performed in the manufacture of the bomb. The procedures shall be in accordance with MIL-W-52574. The procedures shall reflect the requirements for welding specified on the applicable drawings as listed on DL X4900592. Copies of s
18、uch pro- cedures, together with referenced documents, shall be made available to the procuring activity in the manner specified in the contract or pur- chase order (see 6.2.2) for technical concurrence. 3.3.2.3 Working environments. Special working environments for the manufacture of the bomb and bo
19、mb components shall be as specified in Appendix A. 3.4 First article. 3.4.1 Preproduction sample. Unless otherwise specified in the con- tract or purchase order (see 6.2.1), a preproduction sample consisting of ten bombs shall be manufactured, filled in accordance with 4.2.3.1, and delivered to the
20、testing activity designated in the contract or purchase order and subjected to the preproduction tests of 4.1.2.1. The preproduction sample shall be manufactured using the same methods, materials, processes, and procedures proposed for production. Any production prior to acceptance of the preproduct
21、ion sample is totally at the contractors risk. Any changes in design, materials or processes 6 Licensed by Information Handling Services MIL-B-85251 13 m 9777906 03611076 5 m MIT-B-85251 (AS) used in the manufacture of the preproduction sample shall be cause for resubmission of another preproduction
22、 sample for testing. Any such changes shall have prior written approval of the procuring activity. 3.4.2 Preproduction verification. At the discretion of the procuring activity (see 6.2.1), preproduction verification shall be repeated under any of the following conditions: a. The manufacturer has mo
23、dified his product (such as a change of raw materials, the process, production procedures, or methods). It shall be the responsibility of the contractor to notify the procuring activity prior to the incorporation of any such changes, and to provide quantitative evidence of the effect of such changes
24、 on the performance or character- istics of the product. Requirements for such tests shall be based on an evaluation of the evidence supplied. b. Where there is evidence that the quality of the product has not been maintained. This evidence may be in the form of accumulated failure reports of the pr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILB852511981BOMBBINARYCHEMICALEMPTYBLU80B 二元 化学武器 BLU80B 炸弹 PDF

链接地址:http://www.mydoc123.com/p-977301.html