GME 01123-2012 Pillar Trim Panel and Inner Glass Trim Panel (Revision 2 English German Includes Appendix A - E This standard may be applied only for current projects It is SupercedW.pdf
《GME 01123-2012 Pillar Trim Panel and Inner Glass Trim Panel (Revision 2 English German Includes Appendix A - E This standard may be applied only for current projects It is SupercedW.pdf》由会员分享,可在线阅读,更多相关《GME 01123-2012 Pillar Trim Panel and Inner Glass Trim Panel (Revision 2 English German Includes Appendix A - E This standard may be applied only for current projects It is SupercedW.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、GeneralSpecification SUPERCEDEDGME 01123Pillar Trim Panel and Inner GlassTrim PanelSulenverkleidungen und Fenster-verkleidungen (innen)Note: This standard may be applied only forcurrent projects. It is Superceded for all futureprojects and replaced by GMW16793.Hinweis: Diese Spezifikation darf nur n
2、och frlaufende Projekte angewendet werden und istfr alle zuknftigen Projekte ungltig und ersetztdurch GMW16793.1 Introduction 1 Einfhrung1.1 Scope. Applicable for all pillar trim panels. 1.1 Anwendungsbereich. Gltig fr alle Sulenver-kleidungen.1.2 Mission / Theme. This General Specificationdetermine
3、s the test conditions and requirements forthe testing of the pillar trim panel.1.2 Aufgabe / Thema. Diese General Specificationlegt die Prfbedingungen und die Anforderungen frdie berprfungen der Sulenverkleidungen fest.1.3 Classification. 1.3 Einteilung.1.3.1 Trim panel A-pillar 1.3.1 Sulenverkleidu
4、ng A1.3.2 Trim panel B-pillar, seat belt adjuster with 1.3.2 Sulenverkleidung B; Gurthhenversteller mit:closed D-ring geschlossenem D-Ringopen D-ring offenem D-Ring1.3.3 Trim panel C-pillar 1.3.3 Sulenverkleidung C1.3.3.1 Without seat belt adjuster with 1.3.3.1 Ohne Gurthhenversteller mitclosed D-ri
5、ng geschlossenem D-Ringopen D-ring offenem D-Ring1.3.3.2 Seat belt adjuster with 1.3.3.2 Gurthhenversteller mitclosed D-ring geschlossenem D-Ringopen D-ring offenem D-Ring1.3.4 Trim panel D-pillar 1.3.4 Sulenverkleidung D1.3.5 Window bezel 1.3.5 Blende Fenster1.3.6 Trim panel upper tailgate 1.3.6 Ve
6、rkleidung Heckklappe oben Copyright 2012 General Motors Company All Rights ReservedPublication Department: GME Specification CenterMay 2012 Page 1 of 25PRD045 - VPRE ST 1 10/03 SUPERCEDED GME 01123 GM EUROPE ENGINEERING STANDARDSNote: Nothing in the specification, however, super-sedes applicable law
7、s and regulations unless a spe-cific exemption has been obtained.Hinweis: Die Vorschrift darf keine anzuwendendenGesetze und Regelungen auer Kraft setzen.Note: In the event of a conflict between the Germanand theEnglishlanguage,the German languageshalltake precedence.Hinweis: Im Falle von Unstimmigk
8、eiten zwischendem deutschen und dem englischen Text ist derdeutsche Text ausschlaggebend.2 References 2 ReferenzenNote: Only the latest approved standards are appli-cable unless otherwise specified.Hinweis: Wenn nicht anders angegeben, ist jeweilsdieneueste Fassung der angegebenen Referenz gl-tig.2.
9、1 External Standards/Specifications. None. 2.1 Externe Normen/Vorschriften. Keine.2.2 GM Standards/Specifications. 2.2 GM Normen/Vorschriften.GMI 00004 GMUTS L/R-0-12.3 Additional References. None. 2.3 Zustzliche Referenzen. Keine.3 Test Preparation and Evaluation 3 Prfungsvorbereitung undAuswertung
10、3.1 Resources. 3.1 Gerte und Einrichtungen.3.1.1 Calibration. The test facilities and equipmentshall be in good working order and shall have a validcalibration label.3.1.1 Kalibrierung. AllePrfeinrichtungen und -aus-rstungen mssen funktionsfhig sein und eine gl-tige Kalibrierplakette haben.3.1.2 Alt
11、ernatives. Alternative test facilities andequipment may also be used. However, all measur-ing variables as specified in this specification shallbe determined correctly with respect to its physicaldefinition.3.1.2 Alternativen. EsknnenauchalternativePrf-einrichtungen und -ausrstungen verwendet werden
12、.Alle Messvariablen, wie sie in dieser Vorschrift ange-geben werden, mssen jedoch in Bezug auf ihre phy-sikalische Definition korrekt festgelegt werden.3.1.3 Facilities. 3.1.3 Einrichtungen.3.1.3.1 Dudenhofen test center (Belgian block waveroad, Rheinstrae) or equivalent proving ground.3.1.3.1 Testz
13、entrum Dudenhofen (Groblockwellen-bahn, Rheinstrae) oder quivalentes Prffeld.3.1.3.2 Climatic chamber. 3.1.3.2 Klimakammer.3.1.4 Equipment. 3.1.4 Ausrstung.3.1.4.1 Tensile/compression gauge (measuringrange (0.500) N) with piston (diameter: 10 mm) andhook.3.1.4.1 Zug-/Druckwaage (Messbereich (0.500)
14、N)mit Stempel (Durchmesser: 10 mm) und Haken.3.1.4.2 Thermometer. 3.1.4.2 Thermometer.3.1.4.3 Gauges. 3.1.4.3 Messuhren. Copyright 2012 General Motors Company All Rights ReservedPage 2 of 25 May 2012PRD045 - VPRE ST G 10/03GM EUROPE ENGINEERING STANDARDS SUPERCEDED GME 011233.1.4.4 Caliper gauge wit
15、h depth gauge. 3.1.4.4 Messschieber mit Tiefenmesser.3.1.4.5 Steel ruler. 3.1.4.5 Stahllineal.3.1.4.6 Finished sizes. 3.1.4.6 Endmae.3.1.4.7 Device for attachment of a gauge. 3.1.4.7 Gestell zur Aufnahme einer Messuhr.3.1.4.8 Device for clip/retainer pull-off tests. 3.1.4.8 Vorrichtung zur Durchfhru
16、ng der Clip-/Retainer Ausreiversuche.3.1.4.9 Contour marker and attachment. 3.1.4.9 Konturstift und Befestigung.3.2 Test Samples. Pillar and glass trim panels ininstalled condition.3.2 Prfteile. Sulenverkleidungen und Fensterver-kleidungen im eingebauten Zustand.3.3 Conditioning. Not applicable. 3.3
17、 Probenvorbehandlung. Nicht anwendbar.3.4 Documentation. Samples of componentsor material released to this specification shall betested for conformity with the requirements of thisspecification and approved by the responsible GMDepartment prior to the start of delivery of productionlevel components
18、or materials.3.4 Dokumentation. Freigabemuster fr die dieseVorschrift zutrifft, mssen nach dieser Vorschriftgeprft werden und von der verantwortlichen GMAbteilung genehmigt sein, ehe eine Lieferung erfol-gen kann.Any change to the component or material, e.g.design, function, properties, manufacturin
19、g processand/or location of manufacture requires a newrelease of the product. It is the sole responsibility ofthe supplier to provide the customer, unsolicited, withdocumentation of any change or modification to theproduct/process, and to apply for a new release.nderungen von z.B. Aufbau, Funktion,
20、Eigen-schaften, Herstellungsprozess und Ort macheneine Neufreigabe notwendig. Der Hersteller istverpflichtet, unaufgefordert den Abnehmer mit einerDokumentation ber alle Abstimmungen, Modifikatio-nen von Teilen und / oder Prozessen zu informierenund eine Neufreigabe zu beantragen.If not otherwise ag
21、reed to the entire verification testshall be repeated and documented by the supplierprior to start of delivery of the modified or changedproduct. In some cases a shorter test can be agreedto between the responsible GM Department and thesupplier.Wenn nicht anders vereinbart, ist die komplette Frei-ga
22、beprfung durch den Lieferanten zu wiederholenund das Ergebnis zu dokumentieren, bevor die nde-rungen in der Lieferung einsetzen knnen. In Einzel-fllen kann zwischen der verantwortlichen GM Abtei-lung und Lieferant eine verkrzte Prfung vereinbartwerden.3.4.1 Test Results. Variables shall be provided
23、forvalues which are not explicitly listed. The valuesshall be entered in the drawing under the relevantvariables.3.4.1 Prfergebnisse. Werte, die nicht explizit auf-gefhrtsind, werden mit Variablen versehen. Sie sindunterdenentsprechendenVariableninderZeichnungangegeben.Subjective evaluation shallbe
24、performed accordingtoGMUTS L/R-0-1.Die subjektive Beurteilung erfolgt nachGMUTS L/R-0-1.The results shall be entered in the relevant datasheets (Appendix B, C, D and E).DieErgebnissesindindieentsprechendenDatenblt-ter (Anhang B, C, D und E) einzutragen.3.4.2 Deviations from Test Procedure. Deviation
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME011232012PILLARTRIMPANELANDINNERGLASSTRIMPANELREVISION2ENGLISHGERMANINCLUDESAPPENDIXAETHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROJECTSITISSUPERCEDWPDF

链接地址:http://www.mydoc123.com/p-754812.html