FORD WSS-M3H123-C-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) TUFTED FLOOR BACKING TO BE USED WITH FORD WSS-M99P1111-A .pdf
《FORD WSS-M3H123-C-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) TUFTED FLOOR BACKING TO BE USED WITH FORD WSS-M99P1111-A .pdf》由会员分享,可在线阅读,更多相关《FORD WSS-M3H123-C-2018 CARPET BCF NYLON CUT PILE SHIVA PATTERN 678 g m2 (20 oz) TUFTED FLOOR BACKING TO BE USED WITH FORD WSS-M99P1111-A .pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions Rev. 2 2018 05 04 Revised See Summary of Revisions L. Sinclair, NA 2015 05 08 Revised See Summary of Revisions L. Sinclair, NA 2014 06 13 Released L. Sinclair, NA Controlled document at www.MATS Copyright 2018, Ford Global Technologies, LLC P
2、age 1 of 5 CARPET, BCF NYLON, CUT PILE, WSS-M3H123-C SHIVA PATTERN, 678 g/m2 (20 oz), TUFTED FLOOR BACKING CARPET, BCF NYLON, CUT PILE, WSS-M3H123-C2 SHIVA PATTERN, 678 g/m2 (20 oz), NON WOVEN FLOOR BACKING 1. SCOPE The materials defined by this specification are fine denier, bulked continuous filam
3、ent (BCF) nylon, cut pile carpets, tufted into a synthetic primary foundation. The mat may be backed with either rubber or other material. 2. APPLICATION WSS-M3H123-C- The material approved to this specification was released originally for floor mats used on tufted floors. WSS-M3H123-C2 The material
4、 approved to this specification was released originally for floor mats used on tufted floors. 2.1 LIMITATION Model year 2016 and beyond compression molding is not allowed to marry the face to backing material or to pull any B side features. Compression molding is only allowed as a secondary process
5、to change geometry (3D shape). 3. REQUIREMENTS 3.1 APPROVED SOURCES This specification requires the use of approved sources. Only the sources identified on the Ford Approved Source List (ASL) can be used when this specification is listed on the drawing, CAD file, or other documents. The list of appr
6、oved sources is located within Ford at or available externally through a Ford Materials Engineer. 3.2 CONDITIONING AND TEST CONDITIONS All test values are based on material conditioned for not less than 24 h prior to testing in a controlled environment of 23 +/- 2 C and 50 +/- 5% relative humidity.
7、 Testing of the material should occur in the conditioning environment or soon after removal. 3.3 PERFORMANCE CRITERIA 3.3.1 In addition to the requirements listed herein, the end-item mat assembly shall be tested to WSS-M15P44-B and any additional SDS requirements. 3.3.2 The details for each of the
8、suppliers specific construction shall be documented in the supplement attached and saved by Ford in the construction package. ENGINEERING MATERIAL SPECIFICATION WSS-M3H123-C/C2 Copyright 2018, Ford Global Technologies, LLC Page 2 of 5 3.4 SAMPLE SELECTION All evaluations shall be conducted on test s
9、pecimens taken from finished mat assemblies. 3.5 APPEARANCE The color, pattern, and gloss shall match the approved Design Center master sample. 3.6 COMPOSITION 3.6.1 Pile Yarn 100% Nylon 6/6 or 6* (ASTM D 276) *Type will be documented on the approved construction supplement held in the Ford Construc
10、tion Package. 3.6.2 Primary Foundation Polyester (ASTM D 276) 3.6.3 Back Coating Report* (ASTM D 276) 3.6.4 Pre Coat Report * (ASTM D 276) 3.6.5 Secondary Foundation Report * (ASTM D 276) 3.6.6 Secondary Backing Report * (ASTM D 276) * Materials approved for each suppliers construction can be found
11、in the Ford Construction package. 3.7 METHOD OF DYING Solution Dyed 3.8 CONSTRUCTION 3.8.1 Pile Yarn 1000 Denier (ASTM D 1244) 3.8.2 Pile Count (ISO 1763) Rows / 100 mm 50.4 Stitches / 100 mm 65.0 Rows and stitches per 100 mm shall be based on an average count on a 254 mm length of carpet and shall
12、not exceed the tolerance provided on the approved construction supplement in the Ford Construction Package for the approved material. 3.8.3 Needle Gauge 1.98 mm 3.9 THICKNESS 3.9.1 Final Pile Height 6.2 mm Nominal (ISO 1765) ENGINEERING MATERIAL SPECIFICATION WSS-M3H123-C/C2 Copyright 2018, Ford Glo
13、bal Technologies, LLC Page 3 of 5 Pile Height tolerances approved for each suppliers construction can be found in the Ford Construction package. 3.9.2 Primary Foundation (mm) Report * (ISO 1765) 3.9.3 Back Coating (mm) Report * (ISO 1765) The back coating shall thoroughly saturate the base of the pi
14、le fiber bundles to ensure adequate tuft lock. Penetration of the back coating through to the face shall be controlled to provide the required resistance to abrasion and fiber loss, but it shall not be visible on the face of the pile fiber. 3.9.4 Pre Coat (mm) Report * (ISO 1765) 3.9.5 Secondary Fou
15、ndation (mm) Report * (ISO 1765) 3.9.6 Secondary Backing (mm) Report * (ISO 1765) * Thicknesses and tolerances approved for each suppliers construction can be found in the Ford Construction package. 3.10 WEIGHT 3.10.1 Pile Yarn 678 g/m2 (20 oz) (ASTM D5848) Nominal 3.10.2 Primary Foundation 120 +/-
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSSM3H123C2018CARPETBCFNYLONCUTPILESHIVAPATTERN678GM220OZTUFTEDFLOORBACKINGTOBEUSEDWITHFORDWSSM99P1111APDF

链接地址:http://www.mydoc123.com/p-753286.html