ETSI TS 186 022-2-2015 Core Network and Interoperability Testing (INT) Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem Conformance test specificatio.pdf
《ETSI TS 186 022-2-2015 Core Network and Interoperability Testing (INT) Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem Conformance test specificatio.pdf》由会员分享,可在线阅读,更多相关《ETSI TS 186 022-2-2015 Core Network and Interoperability Testing (INT) Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem Conformance test specificatio.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TS 186 022-2 V4.1.1 (2015-10) Core Network and Interoperability Testing (INT); Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance test specification (3GPPTMRelease 10); Part 2: Test Suite Structure and Test Purposes (TSS Essential, or potentially Essen
2、tial, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can
3、 be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Core Network and Inte
4、roperability Testing (INT). The present document is part 2 of a multi-part deliverable covering the Conformance Test Specification of Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem, as identified below: Part 1: “Protocol Implementation Conformance Statement (PICS)“;
5、Part 2: “Test Suite Structure and Test Purposes (TSS Universal Mobile Telecommunications System (UMTS); LTE; Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem; Protocol Specification (3GPP TS 24.615 version 10.5.0 Release 10)“. 2 ETSI TS 186 022-1: “Core Network and Int
6、eroperability Testing (INT); Communication Waiting (CW) using IP Multimedia (IM) Core Network (CN) subsystem; Conformance test specification (3GPP Release 10); Part 1: Protocol Implementation Conformance Statement (PICS)“. 3 ISO/IEC 9646-1: “Information technology - Open Systems Interconnection - Co
7、nformance testing methodology and framework - Part 1: General concepts“. 4 ISO/IEC 9646-7: “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 7: Implementation Conformance Statements“. 5 ETSI ETS 300 406: “Methods for testing and Specificati
8、on (MTS); Protocol and profile conformance testing specifications; Standardization methodology“. 2.2 Informative references References are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version appl
9、ies. For non-specific references, the latest version of the referenced document (including any amendments) applies. NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee their long term validity. The following referenced documents are not nec
10、essary for the application of the present document but they assist the user with regard to a particular subject area. Not applicable. ETSI ETSI TS 186 022-2 V4.1.1 (2015-10)6 3 Definitions and abbreviations 3.1 Definitions For the purposes of the present document, the terms and definitions given in
11、1 and the following apply: Implementation Under Test (IUT): Refer to ISO/IEC 9646-1 3. PICS proforma: Refer to ISO/IEC 9646-1 3. Point of Control and Observation: Refer to ISO/IEC 9646-1 3. Protocol Implementation Conformance Statement (PICS): Refer to ISO/IEC 9646-1 3. System Under Test (SUT): Refe
12、r to ISO/IEC 9646-1 3. Test Purpose (TP): Refer to ISO/IEC 9646-1 3. NOTE: This may contain additional information. 3.2 Abbreviations For the purposes of the present document, the abbreviations given in 1 and the following apply: AS Application Server CW Communication Waiting ISC IP Multimedia Subsy
13、stem Service Control IUT Implementation Under Test SUT System Under Test UE User Equipment 4 Test Suite Structure (TSS) and Test configuration 4.1 Configuration Table 4.1 CW destination_UE CW_U01_xxx originating_UE CW_U02_xxxAS CW_N01_xxxinteraction CDIV CW_N02_xxxconfiguration CW_N03_xxx The scope
14、of the present document is to test the signalling and procedural aspects of the stage 3 requirements as described in 1. The stage 3 description respects the requirements to several network entities and also to requirements regarding to end devices. Therefore several interfaces (reference points) are
15、 addressed to satisfy the test of the different entities. Therefore to test the appropriate entities the configurations below are applicable: Testing of the Application Server: This entity is responsible to perform the service. Hence the ISC interface is the appropriate access point. Figure 4.1 poin
16、ts to this. ETSI ETSI TS 186 022-2 V4.1.1 (2015-10)7 Figure 4.1: Applicable interface to test AS functionalities If the ISC interface is not accessible it is also applicable to perform the test of the AS using any NNI (Mw, Mg, Mx) interface (consider figure 4.2). In case only the Gm interface is acc
17、essible this shall be used instead. In this case, be aware that the verification of several requirements is impeded. Figure 4.2: Applicable interfaces to test using the (generic) NNI interface Figure 4.3 illustrates the usage of any NNI interface. Testing of User Equipment: There are several require
18、ments regarding to the end devices. Therefore a special configuration appears Figure 4.3: Applicable configuration to test the User Equipment ETSI ETSI TS 186 022-2 V4.1.1 (2015-10)8 5 Test Purposes (TP) 5.1 Introduction 5.1.1 TP naming convention TPs are numbered, starting at 001, within each group
19、. Groups are organized according to the TSS. Additional references are added to identify the actual test suite and whether it applies to the network or the user (see table 5.1). Table 5.1: TP identifier naming convention scheme Identifier: _ = supplementary service: e.g. “CW“ = type of IUT: U User -
20、 equipment N Network = group 2 digit field representing group reference according to TSS = sequential number (001-999) 5.1.2 Test strategy As the base standard ETSI TS 124 615 1 contains no explicit requirements for testing, the TPs were generated as a result of an analysis of the base standard and
21、the PICS specification ETSI TS 186 022-1 2. The criteria applied include the following: whether or not a test case can be built from the TP is not considered. 5.2 TPs for Communication Waiting (CW) 5.2.1 Test purposes at the destination (user B) UE TSS CW/destination_UE TP CW_U01_001 Reference 4.5.5
22、.3.2/1 Selection expression PICS 4.1/1 AND PICS 4.2/4 Test purpose The terminating User Equipment applies the Communication Waiting indication to the user. Ensure that the user B User Equipment is able to notify the user that the communication establishment is waiting. Preconditions: SIP header valu
23、es: INVITE: MIME body Content-Type: application/vnd.3gpp.cw+xml Content_Disposition: 3gpp-alternative-service MIME XML ims-cw xmlns=“urn:3gpp:ns:cw:1.0“ communication-waiting-indication Comments: Test System User Equipment Establish a confirmed communication INVITE barb4right 100 Trying barb4left 18
24、0 Ringing barb4left Indicate Communication Waiting to the user Apply post test routine ETSI ETSI TS 186 022-2 V4.1.1 (2015-10)9 TSS CW/destination_UE TP CW_U01_002 Reference 4.5.5.3.2/1 Selection expression PICS 4.1/1 AND PICS 4.2/4 Test purpose The terminating User Equipment sends a 180 Ringing if
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITS18602222015CORENETWORKANDINTEROPERABILITYTESTINGINTCOMMUNICATIONWAITINGCWUSINGIPMULTIMEDIAIMCORENETWORKCNSUBSYSTEMCONFORMANCETESTSPECIFICATIOPDF

链接地址:http://www.mydoc123.com/p-744387.html