EN 50530-2010 en Overall efficiency of grid connected photovoltaic inverters (Incorporates Amendment A1 2013)《并网光伏逆变器的总效率》.pdf
《EN 50530-2010 en Overall efficiency of grid connected photovoltaic inverters (Incorporates Amendment A1 2013)《并网光伏逆变器的总效率》.pdf》由会员分享,可在线阅读,更多相关《EN 50530-2010 en Overall efficiency of grid connected photovoltaic inverters (Incorporates Amendment A1 2013)《并网光伏逆变器的总效率》.pdf(38页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationOverall efficiency of grid connected photovoltaic invertersBS EN 50530:2010+A1:2013BS EN 50530:2010+A1:2013National forewordThis British Standard is the UK implementation of EN 5
2、0530:2010+A1:2013. It supersedes BS EN 50530:2010, which is withdrawn.The start and finish of text introduced or altered by amendment is indicated in the text by tags. Tags indicating changes to CENELEC text carry the number of the CENELEC amendment. For example, text altered by CENELEC amendment A1
3、 is indicated by !“.The UK participation in its preparation was entrusted to Technical Committee GEL/82, Photovoltaic Energy Systems.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provis
4、ions of a contract. Users are responsible for its correct application. The British Standards Institution 2013. Published by BSI Standards Limited 2013ISBN 978 0 580 80513 4ICS 27.160Compliance with a British Standard cannot confer immunity from legal obligations.This British Standard was published u
5、nder the authority of the Standards Policy and Strategy Committee on 31 May 2010.Amendments/corrigenda issued since publicationDate Text affected30 June 2013 Implementation of CENELEC amendment A1:2013BRITISH STANDARDEUROPEAN STANDARD EN 50530:2010+A1 NORME EUROPENNE EUROPISCHE NORM March 2013CENELE
6、C European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Management Centre: Avenue Marnix 17, B - 1000 Brussels 2010 CENELEC - All rights of exploitation in any form and by any means reserved worldwide
7、for CENELEC members. Ref. No. EN 50530:2010 E ICS 27.160 English version Overall efficiency of grid connected photovoltaic inverters Efficacit globale des onduleurs photovoltaques raccords au rseau Gesamtwirkungsgrad von Photovoltaik-Wechselrichtern This European Standard was approved by CENELEC on
8、2010-04-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may
9、be obtained on application to the Central Secretariat or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to t
10、he Central Secretariat has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuani
11、a, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. Foreword This European Standard was prepared by the Technical Committee CENELEC TC 82, Solar photovoltaic energy systems. It was submitted to the Unique Ac
12、ceptance Procedure and approved by CENELEC on 2010-04-01. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and CENELEC shall not be held responsible for identifying any or all such patent rights. The following dates were fixed:
13、 latest date by which the EN has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2011-04-01 latest date by which the national standards conflicting with the EN have to be withdrawn (dow) 2013-04-01 _ This document (EN 50530:2010/A1:2013) h
14、as been prepared by CLC/TC 82 “Solar photovoltaic energy systems“. The following dates are fixed: latest date by which this document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2013-12-24 latest date by which the national standards
15、 conflicting with this document have to be withdrawn (dow) 2015-12-24 Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. BS EN 50530:2010
16、+A1:2013EN 50530:2010+A1:2013 (E) 2 Foreword to amendment A1 Contents 1 Scope . 5 2 Normative references . 5 3 Terms and definitions 5 3.1 Inverter input (PV generator) 5 3.2 Inverter output (grid) . 6 3.3 Measured quantities . 6 3.4 Calculated quantities 7 3.5 Other definitions . 8 4 MPPT efficienc
17、y 8 4.1 General description 8 4.2 Test set-up 9 4.3 MPPT efficiency . 9 4.4 Dynamic MPPT efficiency .11 5 Calculation of the overall efficiency .13 Annex A (normative) Requirements on the measuring apparatus 14 A.1 PV generator simulator .14 A.2 AC power supply 15 Annex B (normative) Test conditions
18、 for dynamic MPPT efficiency .16 B.1 Test profiles 16 B.2 Test sequence with ramps 10 % - 50 % .17 B.3 Test sequence with ramps 30 % - 100 % 18 B.4 Start-up and shut-down test with slow ramps.18 B.5 Total test duration .19 Annex C (normative) Models of current/voltage characteristic of PV generator
19、.20 C.1 20 C.2 PV generator model for MPPT performance tests 25 Annex D (informative) Inverter efficiency .27 D.1 General / Introduction .27 D.2 Conversion efficiency .27 Bibliography 35 BS EN 50530:2010+A1:2013EN 50530:2010+A1:2013 (E) 3 Conversion and static GSTCGSTCAlternative!“!PV generator mode
20、l for MPPT performance tests! Figures Figure 1 Exemplary test set-up for MPPT efficiency measurements . 9 Figure B.1 Test sequence for fluctuations between small and medium irradiance . 16 Figure B.2 Test sequence for fluctuations between medium and high irradiance 16 Figure B.3 Test sequence for th
21、e start-up and shut-down test of grid connected inverters 19 Figure C.1 Irradiation-dependent U-I- and U-P characteristic of a c-Si PV generator . 23 Figure C.2 Irradiation-dependent U-I- and U-P characteristic of a thin-film PV generator . 24 Tables Table 1 10 Table A.1 General requirements on the
22、simulated I/V characteristic of the PV generator 14 . 17 Table B.2 Dynamic MPPT-Test 30 % 100 % 18 Table B.3 . 18 Table C.1 Technology-dependent parameters . 20 Table C.2 Technology-dependent parameters . 22Table C.3 MPP-values obtained with the cSi PV model 22 Table C.4 MPP-values obtained with the
23、 TF-PV mode 25 BS EN 50530:2010+A1:2013EN 50530:2010+A1:2013 (E) 4 Test specifications for the on version and static MPPT efficiency .Table B.1 Dynamic MPPT-Test 10 % 50 % GSTC(valid for the evaluation of MPPTdyn) GSTC(valid for the evaluation of MPPTdyn!“.! “) !“!“1 Scope This European Standard pro
24、vides a procedure for the measurement of the efficiency of the maximum power point tracking (MPPT) of inverters, which are used in grid-connected photovoltaic systems. In that case the inverter energizes a low voltage grid with rated AC voltage and rated frequency. Both the static and dynamic MPPT e
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN505302010ENOVERALLEFFICIENCYOFGRIDCONNECTEDPHOTOVOLTAICINVERTERSINCORPORATESAMENDMENTA12013 并网 逆变器

链接地址:http://www.mydoc123.com/p-717261.html